W56HZV23R0042.pdf

PDF 114 KB Posted

Attached to
FIRING ATTACHMENT, BLANK Federal contract opportunity
Solicitation number
W56HZV-23-R-0042
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to FIRING ATTACHMENT, BLANK, newest first.
File Type Posted
Attachment A Additonal Guidelines for Controlled Unclassified Information.pdf PDF
First-Article-Waiver-Worksheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-23-R-0042

X

2023MAY25

2023JUN2612:00pm

DOA4

2023MAY25 SEE SCHEDULE

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

JULIA SALCEPUEDES

(571)588-9437

CCTA-APS-C

JULIA.L.SALCEPUEDES.CIV@ARMY.MIL

1 47

X 1

X 4 X 11

X 14 X 16 X 18

X 21

X 23

X 32

X 33

X 43

X 46

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JULIA SALCEPUEDES

Buyer Office Symbol/Telephone Number: CCTA-APS-C/(571)588-9437

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A.1 DESCRIPTION OF THE ACTION

A.1.1 This solicitation is a total small business set-aside.

A.1.2 This solicitation is intended to result in a 5-Year, Firm-Fixed Price (FFP), single-award Indefinite Delivery Indefinite Quantity

(IDIQ) contract under Federal Acquisition Regulation (FAR) 16.504.

A.2 MINIMUM AND MAXIUM QUANTITY _

A.2.1 In accordance with FAR 16.504(a)(4)(ii), the minimum quantity of supplies the Government will acquire under the contract is 264 each. The Government will satisfy this minimum quantity requirement by issuing the first delivery order for the stated minimum at the time of award.

A.2.2 The Government is NOT obligated to purchase any additional requirements beyond the Minimum Guaranteed Quantity.

A.2.3. The maximum quantity of supplies the Government can acquire under the IDIQ contract is 10,772 each.

A.3 ORDERING YEAR

A.3.1 There will be Five, one-year ordering periods beginning the date of contract award.

A.3.2 All proposals received in response to this solicitation shall remain valid for a minimum of 120 calendar days.

A.4 DELIVERY ORDER AWARDS

A.4.1 Future delivery orders will be awarded In Accordance With (IAW) FAR clause 52.216-19, Order Limitations and FAR clause 52.216-22, Indefinite Quantity.

A.5 Electronic Contracting

(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal on the website "https://www.sam.gov/ ", however, until SAM.gov can accept proposals offerors should follow the instructions in paragraph (c) below.

(c) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(d) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the

Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

2 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

A.6 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date: __________________ _____

A.7 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson

. (Best viewed using Google Chrome or Microsoft Edge)_

A.8 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.9 ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0001 ***

3 47

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

THE NUMBERING SYSTEM USED IN THE FOUR-DIGIT

ITEM NUMBERS (CLINs) BELOW IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY THE ITEM AND

THE FOURTH (LAST) DIGIT SIGNIFIES THE

APPLICABLE ORDERING YEAR (I.E., CLIN 0011

IS FOR THE FIRST ITEM - FIRST ORDERING

YEAR, CLIN 0012 IS FOR THE FIRST ITEM -

SECOND ORDERING YEAR, CLIN 0013 IS FOR THE

FIRST ITEM - THIRD ORDERING YEAR, ETC.).

THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH

PART, SUCH AS FAT, TECHNICAL MANUALS, SERVICES,

OR TRAINING, BECOME THE LAST ITEM NUMBER IN

NUMERICAL SEQUENCE FOR EACH ITEM (E.G., 0016).

THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE

SOLICITATION AND RESULTING CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE ___________________

OF AWARD PLUS 364 DAYS.

SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS _____________________

THROUGH 729 DAYS AFTER CONTRACT AWARD.

THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS ____________________

THROUGH 1,094 DAYS AFTER CONTRACT AWARD.

FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 _____________________

DAYS THROUGH 1,459 DAYS AFTER CONTRACT AWARD.

FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 ____________________

DAYS THROUGH 1,824 DAYS AFTER CONTRACT AWARD.

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL

ORDER IS THE PRICE FOR THE ORDERING YEAR IN

WHICH THE ORDER IS ISSUED. THE DELIVERY DATE _________________

DOES NOT DETERMINE THE ORDERING YEAR. ____________________________________

THE INFORMATION PRESENTED BELOW APPLIES TO

ITEM NUMBERS (CLINs) 0011 THROUGH 0015:

MINIMUM 5-YEAR QUANTITY: 264 EA

MAXIMUM 5-YEAR QUANTITY: 10,772 EA

NOTE: ONLY THE MINIMUM 5-YEAR QUANTITY IS ___________________________________

GUARANTEED. __________

(End of narrative A001)

0011 FIRST ORDERING YEAR EST 2957 EA $ $ ___________________ ______________ __________________

4 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

NSN: 1005-01-565-6693

COMMODITY NAME: FIRING ATTACHMENT, BLANK AMMU

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19200

Mfr Part Number: 13020129

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE SECTION D PACKAGING REQUIREMENTS

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at Origin means the contractor

MUST contact the Defense Contract Management Agency

(DCMA) to arrange for a Government inspection BEFORE production under CLIN 0011 is shipped.

Failure to have production inspected and accepted at

Origin will result in its rejection at Destination.

Rejected production may be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

(End of narrative F001)

5 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0012 SECOND ORDERING YEAR EST 1056 EA $ $ ____________________ ______________ __________________

NSN: 1005-01-565-6693

COMMODITY NAME: FIRING ATTACHMENT BLANK AMMUN

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19200

Mfr Part Number: 13020129

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS SECTION D

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

6 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 THIRD ORDERING YEAR EST 1056 EA $ $ ___________________ ______________ __________________

NSN: 1005-01-565-6693

COMMODITY NAME: FIRING ATTACHMENT BLANK AMMUN

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19200

Mfr Part Number: 13020129

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS SECTION D

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

7 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0014 FOURTH ORDERING YEAR EST 1056 EA $ $ ____________________ ______________ __________________

NSN: 1005-01-565-6693

COMMODITY NAME: FIRING ATTACHMENT BLANK AMMUN

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19200

Mfr Part Number: 13020129

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS SECTION D

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

8 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0015 FIFTH ORDERING YEAR EST 1056 EA $ $ ___________________ ______________ __________________

NSN: 1005-01-565-6693

COMMODITY NAME: FIRING ATTACHMENT BLANK AMMUN

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19200

Mfr Part Number: 13020129

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS SECTION D

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

9 47

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0021 FIRST ARTICLE TEST - SEPARATELY PRICED 1 LO $ _______________________________________ __________________

SERVICE REQUESTED: FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

CONTRACTOR SHALL CONDUCT THE FIRST ARTICLE TEST

PURSUANT TO THE REQUIREMENTS (FAR CLAUSE 52.209-3) OF

THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL -

CONTRACTOR TESTING."

(End of narrative B001)

Deliveries or Performance _________________________

1000 EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST ___________________________________________

The below ELINs are associated with the Data Item

Numbers on the Contract Data Requirements List (DD

Form 1423), in Section J.

(End of narrative A001)

A001 TEST PROCEDURE - LIGHT PHOSPHATE COATING $ ** NSP ** ________________________________________ __________________

SERVICE REQUESTED: PRE - PRODUCTION PROCEDURE

CLIN CONTRACT TYPE:

Firm Fixed Price

The contractor shall prepare the following deliverable report IAW CDRL A001, Test Procedure -

Light Phosphate Coating and Scope of Work (Section

C.5).

See Section J, Exhibit A - Contract Data Requirements

List - A001, Test Procedure - Light Phosphate

Coating.

(End of narrative B001)

Deliveries or Performance _________________________

10 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number: W56HZV-23-R-0042

To access the data through SAM:

a. Log on to the SAM web site: https://SAM.gov .

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with

Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract

Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and

Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

C.2 DRAWING LIMITATIONS

(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are ___ adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and

11 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

C.3 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER

Acquisition under this contract is restricted to:

(1) The manufacturers part number or numbers set forth in the Schedule or the Technical Data Package; and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided the nonlisted part numbers have been furnished to one of the approved manufacturers listed in the Technical Data Package and that manufacturer has substituted the nonlisted part with one of the approved part numbers, without making any changes in the characteristics or properties of the part.

C.4 CONFIGURATION MANAGEMENT DOCUMENTATION

a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph

3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.

d. All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, Notices of Revision (NORs) or Specification Change Notices (SCNs), the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e (iv) to the Administrative Contracting Officer (ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) Documentation or use of DD Form 1692 (current revision) and delivery of data per DI-SESS-80639 is detailed in paragraph 3.3.1 of EIA-

649-1 for ECPs.

(ii) Documentation or use of DD Form 1694 (current revision) and delivery of data per DI-SESS-80640 is detailed in paragraph 3.3.2 of

EIA-649-1 for RFVs.

(iii) Documentation or use of DD Form 169 (current revision) and delivery of data per DI-SESS-80642 is detailed in paragraph 3.3.4 of

EIA-649-1 for NORs.

(iv) Documentation and delivery of data per DI-SESS-80643 is detailed in Paragraph 3.3.3 of EIA-649-1 for SCNs.

f. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. Incorporation of an approved RFV and/or ECP will require a contract modification execution.

g. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract. If a delivery date change is needed, a contract modification is required.

C.5 NOTICE OF LIGHT PHOSPHATE COATING REQUIREMENT

This solicitation and any resulting purchase order are subject to Federal Specification TT-C-490, Type I, Cleaning Methods for Ferrous

Surfaces and Pretreatments for Organic Coatings. See CDRL A001 TEST PROCEDURE - LIGHT PHOSPHATE COATING.

C.6 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

12 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

OPSEC Level I.

C.7 OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the Procuring

Contracting Officer (PCO).

C.8 Additional Guideline for Controlled Unclassified Information. See Section J, Attachment 0002 ATTACHMENT A ADDITIONAL GUIDELINES FOR

CONTROLLED UNCLASSIFIED INFORMATION.

*** END OF NARRATIVE C0001 ***

13 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1 PACKAGING REQUIREMENTS (SPECIFICATIONS/STANDARDS)

(a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.

(b) The following requirements shall apply:

(1) LEVEL OF PRESERVATION: MILITARY

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIFICATION/STANDARD: MIL-STD-2073-1

(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.

The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.

(d) Marking:

In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.

Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see

"%20http://www.acq.osd.mil/log/sci/ait.html" (best viewed with Internet Explorer 11 or higher, or FireFox) for the current DoD Suppliers

Passive RFID Information Guide and Supplier Implementation Plan. When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:

https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.

Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

(f) Hazardous Materials (As applicable):

14 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(g) SUPPLEMENTAL INSTRUCTIONS: -Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the Contracting Office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage. Packaging shall be in accordance with MIL-

STD-2073-1 and have successfully passed test levels of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criterion 3, Military packing Level B . The warehouse stacking height shall be 16 ft. The shipping unit shall be the unit pack. Marking shall be in accordance with MIL-STD-129. Testing shall be witnessed by the Government Quality Assurance Representative. Packaged gross weight and size shall be included on the test report as well as a detailed description of the packaging. The Contractor is exempted from testing if other data can be provided (see para. 5.6 of MIL-STD-2073-1) and is acceptable to the Government. Similar items do not require retesting.

*** END OF NARRATIVE D0001 ***

15 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

QMS Requirements: ISO 9001:2015 (21 OCT 2015) or equivalent

Full ISO

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT: __________________________________________

(Name) (CAGE)

(Address) (City) (State) (Zip)

E.2 NOTICE REGARDING FIRST ARTICLE

(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.

(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.

(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.

E.3 DRAWINGS FOR INSPECTION

(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable

Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.

(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.

16 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE E0001 ***

17 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.242-15 STOP-WORK ORDER AUG/1989

F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-3 52.247-34 F.O.B. DESTINATION NOV/1991

F-4 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-5 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE WITH FAT

ITEM NO. QUANTITY WITHIN DAYS

AFTER CONTRACT AWARD

CLIN 0011 EST 2957 EA 390 DAYS AFTER AWARD

CLIN 0012 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0013 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0014 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0015 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0021 3 EA 240 DAYS AFTER AWARD

REQUIRED DELIVERY SCHEDULE IF FAT IS WAIVED

ITEM NO. QUANTITY WITHIN DAYS AFTER

CONTRACT AWARD

CLIN 0011 EST 2957 EA 270 DAYS AFTER AWARD

CLIN 0012 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0013 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0014 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0015 EST 1056 EA 270 DAYS AFTER AWARD

CLIN 0021 N/A N/A

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

18 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

F.1 LONG TERM CONTRACTS - FOB DESTINATION

For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed:

100% TO XR WOLF ANNISTON MUNITIONS CENTER (BA4)

F.2 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR ADDRESSES

Rail/ MILSTRIP

Motor Address Rail Motor Parcel Post

SPLC* Code Ship To: Ship To: Mail To:

206721/ W25G1U Transportation Officer Transportation Officer Transportation Officer

209405 Defense Dist Depot Defense Dist Depot Defense Dist Depot

Susquehanna Susquehanna Susquehanna

New Cumberland, PA New Cumberland, PA New Cumberland, PA

17070-5001

NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.

Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.

875670/ W62G2T Transportation Officer Transportation Officer Transportation Officer

875675 XU Def Dist Depot XU Def Dist Depot Dist Depot San Joaquin

San Joaquin San Joaquin P O Box 96001

25600 S Chrisman Rd 25600 S Chrisman Rd Stockton, CA

95296-0130

Rec Whse 10 Rec Whse 10

Tracy, Ca 95376-5000 Tracy, Ca 95376-5000

471995/ W31G1Z Transportation Officer Transportation Officer Transportation Officer

471996 Anniston Army Depot, Anniston Army Depot, Anniston Army Depot, Bynum, AL Bynum, AL Anniston, AL 36201-5021

209741/ W25G1R Transportation Officer Transportation Officer Transportation Officer

209770 Letterkenny Army Depot, Letterkenny Army Depot, Letterkenny Army Depot, 19 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Culbertson, PA Chambersburg, PA Chambersburg, PA

17201-4150

661136/ W45G19 Transportation Officer Transportation Officer Transportation Officer

661157 W56R2M Red River Army Depot, Red River Army Depot, Red River Army Depot, Defense, TX Texarkana, TX Texarkana, TX

75507-5000

764538/ W67G23 Transportation Officer Transportation Officer Transportation Officer

764535 Tooele Army Depot, Tooele Army Depot, Tooele Army Depot, Warner, UT Tooele, UT Tooele, UT 84074-5003

***SPLC indicates Standard Point Locator Code.

NOTE: The following is applicable only when so specified in an individual order or delivery increment:

This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:

New Cumberland Army Depot

Red River Army Depot

Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.

*** END OF NARRATIVE F0001 ***

20 47

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .