W56HZV19C0193.pdf
PDF 70 KB Posted
- Attached to
- Indirect Plotting Board, NSN: 1220-01-548-9063 Federal contract opportunity
- Solicitation number
- W56HZV-19-R-0152
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV19R0152.pdf | ||
| FAT_Worksheet_EH8E1797EH.pdf | ||
| GFE_Attachment_W56HZV-19-R-0152_R1.pdf | ||
| W56HZV-19-R-0153_Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)
Rating Page Of Pages
2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.
5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:
7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery
FOB Origin Other (See Below)
9. Discount For Prompt Payment
10. Submit Invoices Item (4 Copies Unless Otherwise Specified)
Code Facility Code To The Address Shown In:
11. Ship To/Mark For Code 12. Payment Will Be Made By Code
13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount
15G. Total Amount Of Contract
16. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments
C Description/Specs./Work Statement J List of Attachments
D Packaging and Marking Part IV - Representations And Instructions
E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors
H Special Contract Requirements M Evaluation Factors for Award Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable
17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)
18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)
19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer
19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed
By By
(Signature of person authorized to sign) (Signature of Contracting Officer)
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)
DOA4
W56HZV-19-C-0193 2019SEP26 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
CHRISTINA SCHMIDT
CHRISTINA.A.SCHMIDT.CIV@MAIL.MIL
S0701A
DCMA HARTFORD
130 DARLIN STREET
EAST HARTFORD CT 06108-3234
6RQU7
CAPSTONE MANUFACTURING INC
1257 JOHN FITCH BLVD UNIT 2
SOUTH WINDSOR, CT 01030-2624
X
SEE SCHEDULE
HQ0337
DFAS-CO/NORTH ENTITLEMENT OPERATION
P.O. BOX 182317
COLUMBUS OH 43218-2266
SEE SECTION G
SEE SCHEDULE
$985,600.00
X
2 signed
LEE TAPPY
LEE.F.TAPPY.CIV@MAIL.MIL (586)282-2725
/SIGNED/ 2019SEP26
1 25
X 1
X 4
X 7
X 9
X 11
X 14
X 15
X 17
X 25
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHRISTINA SCHMIDT
Buyer Office Symbol/Telephone Number: CCTA-ALS-E/(586)282-2455
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Type of Business: Small Disadvantaged Business Performing in U.S.
Surveillance Criticality Designator: C
Weapon System: Mortar 81mm XM252
Contract Expiration Date: 2020SEP26
*** End of Narrative A0000 ***
1. This contract is awarded to Capstone Manufacturing Inc. as a 100% Small Business Set-aside and with one 100% option for the following item:
CLIN 0001AA
NSN: 1220-01-548-9063
Part No.: 13014357
Noun: Plotting Board, Indirect
Basic Qty.: 1,400
U/I: EA
CLIN 0002AA
NSN: 1220-01-548-9063
Part No.: 13014357
Noun: Unexercised Option, Plotting Board, Indirect
Basic Qty.: 1,400
U/I: EA
2. The contractor is authorized to ship early with no quantity restrictions and at no additional cost to the Government.
3. Packaging requirements are according to local narrative D.1.
4. First Article Test is waived; however FAT clauses will remain in the contact for any subsequent FATs, if required.
5. All shipments will be FOB Destination to the following address:
Parcel Post:
PR Army General Supply LMP Stock Recor
Central Receiving Point
7 Frankford Ave, Blg 362
Anniston, AL 36201-4199
*** END OF NARRATIVE A0001 ***
A.1 RESERVED.
A.2 RESERVED.
A.3 RESERVED.
A.4 RESERVED.
A.5 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title
22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via FedBizOpps) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, 2 25
W56HZV-19-C-0193
CAPSTONE MANUFACTURING INC
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx . Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.6 ACCEPTANCE APPENDIX
(a) Contract Number W56HZV-19-C-0193 is awarded to Capstone Manufacturing Inc, CAGE Code: 6RQU7
(b) The contractor, in its proposal, provided data for various solicitation clauses, and that data has been added in this contract.
(c) Any attachments not included within this document will be provided by ACC-Warren directly to the administrative contracting officer
(ACO) via e-mail as required. Technical data packages that are only available on CD-ROM will be mailed by ACC-Warren to the ACO.
Within one week of this award, any office not able to obtain these attachments from Federal Business Opportunity (fbo.gov) and still requiring a copy, can send an e-mail request to the buyer listed on the front page of this contract.
(d) The First Article Test (FAT) requirement has been waived for Capstone Manufacturing Inc., for this procurement only. All references to FAT requirements in this procurement are to be disregarded.
(d) The following Amendment(s) to the solicitation are incorporated into this contract: N/A
*** END OF NARRATIVE A0002 ***
3 25
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PLOTTING BOARD,INDI
NSN: 1220-01-548-9063
Mfr CAGE: 19200
Mfr Part Number: 13014357
0001AA Production Quantity 1400 EA $ 704.00000 $ 985,600.00 ____________________ ______________ __________________
COMMODITY NAME: PLOTTING BOARD,INDI
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH8E1797EH PRON AMD: 04 ACRN: AA
AMS CD: SM2B1100000
PSC: 1220
This requirment is for Indirect Plotting Board and
Carrying Case. See C.1 for more information.
The TM 9-1220-243-12&P will be provided as Goverment
Furnished Equipment from the Government.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV8261V151 W562RP J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 700 22-JUN-2020
002 700 22-JUL-2020
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
4 25
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 PLOTTING BOARD, INDIRECT
Mfr CAGE: 19200
Mfr Part Number: 13014357
0002AA UNEXERCISED OPTION CLIN 1400 EA $ 704.00000 $ 985,600.00 _________________________ ______________ __________________
COMMODITY NAME: PLOTTING BOARD, INDIRECT
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 1220
OPTION QUANTITY, PURSUANT TO THE CLAUSE
ENTITLED OPTION FOR INCREASED QUANTITY---
SEPARATELY PRICED LINE ITEM (FAR 52.217-7).
The quantity stated for the option CLIN DOES
NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the
Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the
Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.
(End of narrative B001)
This requirment is for Indirect Plotting Board and
Carrying Case. See C.1 for more information.
The TM 9-1220-243-12&P will be provided as Goverment
Furnished Equipment from the Government.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
5 25
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 700 0240
002 700 0270
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
6 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 SPECIFICATIONS
This procurement for NSN: 1220-01-548-9063, Indirect Plotting Board is based on Technical Manual (TM) Part # 13013024, Plotting Board, and Part # 7680317, Carrying Case. The Carrying Case is required.
TM 9-1220-243-12&P shall be provided as Government Furnished Equipment (GFE).
GFE will be shipped by the Government to the contractor upon award of contract to the following address:
SHIP TO:
Capstone Manufacturing, Inc. 6RQU7_____________________________________________
NAME CAGE
Unit 2 & 3 1257 John Fitch Blvd. South Windsor CT 06074________________________________________________________________
ADDRESS CITY STATE ZIP
C.2 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation resides within FedBizOpps (https://www.fbo.gov ), associated with this solicitation number, and can be accessed via this URL:
https://www.fbo.gov/notices/b76f5dbae6ae5c9b8c6efba71e596f5f
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step. To obtain certification, go to http://www.dlis.dla.mil/jcp/ .
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt.
FBO will allow access to export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. FBO will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items. Allow two (2) to three (3) working days to complete this FBO-TDP access/approval process through the FBO system.
7 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to https://www.fbo.gov/index . The FBO helpdesk phone number is
(866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://www.fbo.gov - on the right is User Guides - click on Vendor.
C.3 CONFIGURATION MANAGEMENT DOCUMENTATION
a. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV), in accordance with CDRL A002, is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes
Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
d. All Engineering Change Proposals (ECPs) shall be submitted in accordance with CDRL A001 and will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
e. All Notice of Revisions (NOR) shall be submitted in accordance with CDRL A003.
f. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs, and VECPs to:
ARDEC Engineering Office
OFFICE: RDAR-EIS-PD
EMAIL: usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil
*** END OF NARRATIVE C0001 ***
8 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
A. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.
(1) LEVEL OF PRESERVATION: - Military -
(2) LEVEL OF PACKING: - B -
(3) QUANTITY PER UNIT PACKAGE: - 001 -
(4) SPECIAL PACKAGING INSTRUCTION NUMBER: - 7310800 -
(a) REVISION: - N/A -
(b) DATE OF REVISION 21 Aug 12
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL:
https://www.fbo.gov/index.php?mode=form&id=bad40eed01fbc056080c5944aa89abb7&tab=ntype
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
B. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
C. Marking: In addition to any special markings called out on the SPI;
C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause
252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan.
If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
E. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, 9 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
alternate blocking, bracing, cushioning, and packing.
F. Hazardous Materials (as applicable):
F.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
F.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
International Air Transport Association (IATA) Dangerous Goods Regulations
International Maritime Dangerous Goods Code (IMDG)
Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO
P4030.19/DLAM 4145.3 (for military air shipments).
F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
F.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
SUPPLEMENTAL INSTRUCTIONS: N/A
*** END OF NARRATIVE D0001 ***
10 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
QMS Requirements: ISO 9001:2015 (21 Oct 2015) or equivalent
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or his subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ORIGIN
Capstone Manufacturing, Inc. 6RQU7_____________________________________________
NAME CAGE
1257 John Fitch Blvd. South Windsor CT 06074___________________________________________________________________
ADDRESS CITY STATE ZIP
ACCEPTANCE POINT: ORIGIN
Capstone Manufacturing, Inc. 6RQU7_____________________________________________
NAME CAGE
1257 John Fitch Blvd. South Windsor CT 06074___________________________________________________________________
ADDRESS CITY STATE ZIP
E.2 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL)
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance
Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
11 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. A copy of the First Article Test Report shall will be copy furnished in accordance with CDRL A004.
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
E.3 REWORK AND REPAIR OF NONCONFORMING MATERIAL
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Variance, DD Form 1694, to the Contracting
Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
*** END OF NARRATIVE E0001 ***
12 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
13 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-2 52.247-34 F.O.B. DESTINATION NOV/1991
F-3 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-4 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
F-5 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012
F-6 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
CLIN 0001AA 1,400 EA 700 EA, 23 Jun 2020; 700 EA, 23 Jul 2020
CLIN 0002AA 1,400 EA (if exercised), 240 days at a rate of 700 every 30 days
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
14 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
PRON/ PRON/
AMS CD/ AMS CD/
LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED
ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________
0001AA EH8E1797EH 2 AA $ 985,600.00
SM2B1100000
TOTAL $ 985,600.00
OBLIGATED OBLIGATED
ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________
AA 97 X4930AC9D 6D 26FB S20113 W56HZV $ 985,600.00 __________________
TOTAL $ 985,600.00
LINELINE
ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________
0001AA AA 97 0X0X4930AC9D S20113 6D0000SM2B110000026FB S20113 W56HZV
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
15 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Combo
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Combo
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0337
Issue By DoDAAC W56HZV
Admin DoDAAC S0701A
Inspect By DoDAAC See Scheduled
Ship To Code See Schedule
Ship From Code See Schedule
Mark For Code See Schedule
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC Contact ACO
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and
Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
N/A
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
16 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-1 52.202-1 DEFINITIONS NOV/2013
I-2 52.203-3 GRATUITIES APR/1984
I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014
I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP/2006
I-5 52.203-7 ANTI-KICKBACK PROCEDURES MAY/2014
I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014
IMPROPER ACTIVITY
I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014
I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS OCT/2010
I-9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS JAN/2017
OR STATEMENTS
I-10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011
I-11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2018
I-12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018
I-13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2016
I-14 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES JUL/2018
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES
I-15 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
I-16 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY OCT/2018
MATTERS
I-17 52.211-5 MATERIAL REQUIREMENTS AUG/2000
I-18 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008
I-19 52.215-14 INTEGRITY OF UNIT PRICES OCT/2010
I-20 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS OCT/2018
I-21 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES JAN/2018
I-22 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014
$15,000
I-23 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015
I-24 52.222-26 EQUAL OPPORTUNITY SEP/2016
I-25 52.222-37 EMPLOYMENT REPORTS ON VETERANS FEB/2016
I-26 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS DEC/2010
ACT
I-27 52.222-50 COMBATING TRAFFICKING IN PERSONS JAN/2019
I-28 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION OCT/2015
I-29 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011
I-30 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008
I-31 52.227-1 AUTHORIZATION AND CONSENT DEC/2007
I-32 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT DEC/2007
I-33 52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB/2013
I-34 52.232-1 PAYMENTS APR/1984
I-35 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002
I-36 52.232-11 EXTRAS APR/1984
I-37 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984
I-38 52.232-25 PROMPT PAYMENT JAN/2017
I-39 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013
I-40 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013
I-41 52.233-1 DISPUTES MAY/2014
I-42 52.233-3 PROTEST AFTER AWARD AUG/1996
I-43 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004
I-44 52.242-13 BANKRUPTCY JUL/1995
I-45 52.243-1 CHANGES--FIXED PRICE AUG/1987
17 25
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-46 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AUG/2019
I-47 52.245-1 GOVERNMENT PROPERTY JAN/2017
I-48 52.245-9 USE AND CHARGES APR/2012
I-49 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003
I-50 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR/2012
I-51 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984
I-52 52.253-1 COMPUTER GENERATED FORMS JAN/1991
I-53 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011
I-54 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- DEC/2008
RELATED FELONIES
I-55 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013
I-56 252.204-7000 DISCLOSURE OF INFORMATION OCT/2016
I-57 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992
I-58 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING OCT/2016
I-59 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016
I-60 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS DEC/1991
I-61 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE MAY/2019
GOVERNMENT OF A TERRORIST COUNTRY
I-62 252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS DEC/2010
I-63 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013
I-64 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC APR/2019
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
I-65 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014
I-66 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER FEB/2014
SOFTWARE DOCUMENTATION
I-67 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011
I-68 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013
INFORMATION MARKED WITH RESTRICTIVE LEGENDS
I-69 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE APR/1988
I-70 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000
I-71 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA SEP/2016
I-72 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991
I-73 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006
I-74 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991
I-75 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT DEC/2012
I-76 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS JUN/2013
I-77 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY APR/2012
I-78 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY DEC/2017
I-79 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION APR/2012
I-80 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL DEC/2017
I-81 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC FEB/2019
I-82 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
(a) The Contractor shall test 3 unit(s) of Lot/Item COAI Plotting Board, NSN: 1220-01-548-9063, P/N 13014357 as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Quality Assurance
Representative and usarmy.ria.rdecom-ardec.mbx.rdar-qep@mail.mil, in writing, of the time and location of the testing so that the
Government may witness the tests.
(b) The Contractor shall submit the first article test report within 240 calendar days from the date of this contract in accordance with
CDRL A004, marked First Article Test Report: Contract No. __________________, Lot/Item No. ______. Within 30 calendar days after the
Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for…