W56HZV-20-R-L818.pdf

PDF 638 KB Posted

Attached to
Data Acquisition (DAQ) and Control System Upgrades Federal contract opportunity
Solicitation number
W56HZV-20-R-L818
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

This solicitation seeks proposals for Data Acquisition and Control System upgrades for four test cells. The Army Materiel Command TACOM Life Cycle Management Command is procuring turnkey DAQ systems, including hardware, software, design services, installation, training, and documentation. Proposals are due by 5 June 2020.

The scope includes upgrading test cells 6, 2, 3, and 9 located at the Ground Vehicle Systems Center in Detroit Arsenal, Michigan. Test cell 6 upgrade will be funded at award, with options to upgrade the others. Offerors must propose solutions using commercial off-the-shelf components with an open LabVIEW-based architecture. Requirements include automated testing capabilities, limits monitoring, high-speed data recording, and Ethernet/CAN connectivity. The period of performance is three years with options to extend selected upgrades up to six months. Evaluation will consider past performance and price using a tradeoff methodology.

View the file

Other files for this federal contract opportunity

Other files attached to Data Acquisition (DAQ) and Control System Upgrades, newest first.
File Type Posted
Attachment 0002 - Government Format Pricing Model.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W56HZV20RL818

b. TELEPHONE NUMBER

586-282-2488

8. OFFER DUE DATE/LOCAL TIME

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W56HZV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ALEXANDRA OUTLAND

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CONTRACTING COMMAND - WARREN (DTA)

6501 E. 11 MILE RD.

DETROIT ARSENAL MI 48937-5000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W91ATL 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DETROIT ARSENAL

SCOTT MROZ BLDG 212/ MS 121

BLDG 212

6501 E. 11 MILE RD

WARREN MI 48397-5000

TEL: 586-216-2171 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

334519

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF80

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W56HZV20RL818

Section SF 1449 - CONTINUATION SHEET

SUMMARY OF PROCUREMENT

1. This requirement is for the upgrade of up to four engine test cells (6, 2, 3 and 9) at the Ground Vehicle System Center (GVSC) in Detroit Arsenal, Michigan. The objective is to install complete operational Data Acquisition (DAQ) and Control systems, data interfaces, and networks.

2. Test Cell 6 Upgrade will be funded at contract award.

3. Test Cell 2, 3, and 9 Upgrades are options.

4. The period of performance for each test cell upgrade is six months.

5. The total period of performance of this contract is three years from the date of award. Performance of one or more Test Cell Upgrade(s) may extend up to six months beyond this three year period.

6. Offers will be evaluated using the tradeoff method between Past Performance and Price. See FAR 52.212-

2, Evaluation – Commercial Items in Section I, and Sections L and M for details.

7. A site visit is HIGHLY RECOMMENDED, and will be conducted via Microsoft Teams. See the

Performance Work Statement for details.

A. SOLICITATION/CONTRACT FORM

A.1 Electronic Contracting

(a) All Army Contracting Command – Warren solicitations will be publicized on the System for Award Management website (https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal beta.SAM.gov, however until beta.SAM.gov can accept proposals offerors should follow the instructions in paragraph (c) below.

(c) With the recent transition from www.FBO.gov to www.beta.sam.gov the site have been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist (alexandra.n.outland.civ@mail.mil) and cc the corresponding Contracting Officer (marie.a.drager.civ@mail.mil) with the subject header: Proposal Submission - W56HZV-20-R-L818 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.

(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: “Message 1 of 3, 2 of 3, 3 of 3”. Bids can be submitted can be submitted using any of the following electronic formats:

(2) Microsoft Office Products ; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.

(5) Other electronic formats are not acceptable.

Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

A.2 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.3 ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.4 ALL OR NONE-COMMERCIAL ITEM ACQUISITION

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

A.5 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)

Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

A.6 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)

In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc).

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Test Cell 6 Upgrade

FFP

The contractor shall provide all parts and equipment required to upgrade Test Cell

6. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the Performance Work Statement (PWS) set forth below.

Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 6625

NET AMT

0002 1 Each Test Cell 2 Upgrade Option - OY 1

FFP

Ordering Year (OY)

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 2. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0003 1 Each Test Cell 3 Upgrade Option - OY 1

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 3. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004 1 Each Test Cell 9 Upgrade Option - OY 1

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 9. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Contract Data Requirements List (CDRLs)

FFP

See Attachment 0001, Contract Data Requirements List (CDRLs) A001-A010.

0006 1 Each Test Cell 2 Upgrade Option - OY 2

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 2. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0007 1 Each Test Cell 3 Upgrade Option - OY 2

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 3. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0008 1 Each Test Cell 9 Upgrade Option - OY 2

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 9. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0009 1 Each Test Cell 2 Upgrade Option - OY 3

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 2. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0010 1 Each Test Cell 3 Upgrade Option - OY 3

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 3. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0011 1 Each Test Cell 9 Upgrade Option - OY 3

FFP

If exercised, the contractor shall provide all parts and equipment required to upgrade Test Cell 9. The contractor shall also provide associated design, installation, and operation and maintenance training services. Supplies and services shall be provided in accordance with the PWS set forth below. Additional parts/materials not specified in the PWS may be needed.

Period of Performance: 6 months NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

C. DESCRIPTION/SPECIFICATIONS

Performance Work Statement

Data Acquisition and Control (DAQ) System Upgrades

Objectives The contractor shall procure and install complete, operational Data Acquisition (DAQ) and Control systems, data interfaces, and networks in identified Engine Test Cells located at the US Army CCDC Ground Vehicle Systems Center (GVSC), Detroit Arsenal, Michigan. These Test Cells measure the torque and rotational speed (RPM) of an engine/motor and provide simulated road loading. The DAQ system shall collect, store, process, and analyze the data generated within the Test Cell(s). Final acceptance will be made by the Government after the system is tested by the contractor and Government with Government-provided test articles to be determined at design review. The contractor shall also provide operation and maintenance training on the DAQ system for GVSC personnel.

System Installation The contractor shall provide all necessary support, project management, labor, equipment, tools, fork-trucks, lifting devices, and materials to successfully install complete, operational DAQ systems at the location referenced above in accordance with the delivery and performance schedule.

Commercial off the Shelf All proposed systems must be commercially established. This means that the data acquisition and control system software must be fully developed and tested prior to being proposed (Commercial Off-The-Shelf).

Facility Details The GVSC facility is located on the Detroit Arsenal, which is a secured facility. Security clearances and US citizenship is required for access. All access required shall be coordinated around normal business hours and federal holidays (M-F 7am – 5pm). All contractors and subcontractors must have a limited background investigation performed by the access control center. If a contractor has a requirement to be on site for long periods of time they can be issued a temporary badge to minimize time at the gate. The contractor shall coordinate this a minimum of 10 business days prior to any visit. Access needs to be identified by the project manager and communicated to the Technical Point of Contact (POC).

Facility Electrical. The contractor is responsible for providing all disconnects, circuit protection, wiring, conduit, transformers, reactors, etc. required for the installation of their equipment to the provided service. All systems should be designed for installation in spaces requiring Class I, Division II devices and wiring below 18 inches above finished floor level per the National Electric Code (NEC).

This facility is listed in the Michigan SHPO (State Historic Preservation Office) so any modification to the exterior of the building must be coordinated with GVSC to obtain the appropriate waivers, The waiver process requires the contractor to submit a detailed modification plan before final design of the system, and is estimated to take up to six months to complete in accordance with CDRL A005. The Government will not extend the performance completion date identified below for any reason related to this process.

The contractor personnel shall possess all required and valid certifications or licenses for rigging, crane operation and fork-trucks from a nationally recognized OSHA approved vendor throughout the entire time on site.

Security Requirements

ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.

(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.

TRUSTED ASSOCIATE SPONSORSHIP SYSTEM (TASS) PROGRAM

(a) The contractor is responsible for processing applications for Common Access Cards (CAC) for every contractor employee who deploys with the military force, OR who has need to access any Government computer network in accordance with FAR 52.204-9, “Personal Identity Verification of Contractor Personnel.”

(b) The contractor is responsible for managing requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The norm is at least ten calendar days’ advance notice to the Trusted Agent* (TA), unless there are extenuating circumstances approved by the Contracting Officer’s Representative (COR) or Contracting Officer. *The COR will be the TA for this contract.

(c) The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a Government computer network. This can be done by going to http://www.us.army.mil and register as an “Army Guest” with the sponsor being the COR. Note:

If a contractor employee loses the privilege to access AKO, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their AKO accounts.

(d) It is recommended that a “Corporate Facility Security Officer (FSO) be established to serve as the firm’s single point of contact for Trusted Associate Sponsorship System (TASS). If a FSO is not established, each contractor employee requiring a CAC card will be required to process their own applications.

(e) CAC applications must be processed through the DOD’s TASS. The contractor’s FSO or contractor employee shall submit requests for a CAC via email to the TASS Trusted Agent (TA) at -1- before accessing the TASS website.

(f) The Government will establish a TASS application account for each CAC request and will provide each contractor employee a USER ID and Password via email to the FSO. The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at https://www.dmdc.osd.mil/tass/operator/consent?continueToUrl=%2Ftass%2Findex.jsp.

(g) The FSO or contractor employee will submit completed applications in TASS, and will follow up to ensure that the TA is processing the request.

(h) The Government will inform the contractor’s applicant via email of one of the following:

- Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time Automated Personnel Identification System (RAPIDS) station (https://www.dmdc.osd.mil/rsl/ provides RAPIDS locations).

- Rejected*. Government in separate correspondence will provide reason(s) for rejection.

- Returned. Additional information, or correction to the application, required by the contractor employee.

*The contractor will maintain records of all approved and rejected applications.

(i) At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC.

(j) Issued CACs shall be for a period of performance not longer than three (3) years or the individual’s contract end date (inclusive of any options) whichever is earlier.

(k) The contractor shall return issued CAC’s to the DEERS office upon return from deployment, departure or dismissal of each contractor employee. A receipt for each card must be obtained and provided to the TA/COR.

(l) A CAC cannot be issued without evidence that a National Agency Check with Written Inquires (NACI) has at least been initiated by the FSO. TASS will be linked to the Joint Personnel Adjudication System (JPAS) in the near future. The TA will have to verify via JPAS that the NACI has been initiated by the FSO before he/she can approve a contractor request for a CAC.

(m) Details and training on TASS are available on AKO at https://www.us.army.mil/suite/portal/index.jsp or by contacting the CAC helpdesk at cacsupport@mail.mil or 866-738-3222.

REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.

(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.

OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training.

OPSEC awareness training is available at: https://securityawareness.usalearning.gov/opsec/index.htm. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officer’s Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).

ACCESS TO THE DETROIT ARSENAL; IDENTIFYING CONTRACTOR EMPLOYEES; NON-

DISCLOSURE STATEMENT

(a) APPLICABILITY. This requirement is only applicable to contractor employees working at, or visiting, Detroit Arsenal. The term “contractor employee” includes employees, agents, or representatives and all employees, agents, or representatives and all employees, agents or representatives of all subcontractors, suppliers and consultants.

(1) DETROIT ARSENAL ACCESS.

All contractor personnel entering the installation and requiring unescorted access must have a valid purpose to enter and be sponsored by a U.S. Government organization or a contractor providing support on the installation.

They must have their identity proofed and vetted through the National Crime Information Center (NCIC) database, and be issued, or in possession of an authorized and valid access credential from the Detroit Arsenal installation. At the discretion of the Senior Commander, U.S. Army Garrison Detroit Arsenal, any individual known to have a criminal background involving violence or meets the disqualifying standards in the Final Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12 (31 Jul 2008), may be denied access to the Detroit Arsenal. Fingerprinting of employees and any other security procedures deemed necessary for the security of

Detroit Arsenal (vehicle searches or x-raying packages, bags, briefcases) may be required based on the Force Protection Condition level at the time of access and whether the installation or building location is identified as a Restricted Area or Mission Essential Vulnerable Area (MEVA).

(2) BADGES/PASSES.

(a) Contractor employees entering the Detroit Arsenal are responsible for obtaining, and then returning, security identification badges/passes and vehicle registration decals/passes. Badges are valid only for the date spans indicated, by the Government, on each badge application form (STA Form 17).

(i) Obtaining Badges. Government sponsor must prepare and submit a properly completed STA Form 17 (Visitor Notification and/or Temporary Security Identification Badge Application) to the Detroit Arsenal Visitor Control Center not less than 96 hours prior to scheduled visit.

(ii) Returning Badges. The Government sponsor is responsible to ensure the security identification badges are returned to the Visitor Control Center, Bldg 232, upon expiration or termination of the contract relationship with the contract employee. Failure to comply with the requirements in this paragraph may be grounds for withholding any funds due the contractor until completion of the requirement, notwithstanding any other clause or requirements in the contract. Failure to comply may also be taken into account by the Government in evaluating the contractor’s past performance on future acquisitions.

Badge Guidance.

(b) All contractor employees, while on the premises at the Detroit Arsenal, shall continually wear the badge, which shall be visible at all times between the neck and waist of the individual. Badges will be secured from public view when off post and will not be left in privately owned or contractor vehicles unattended. Stolen or lost badges will be promptly reported to DES, USAG Detroit.

(c) The identification badge or pass issued to contractor employee(s) is for their own use only. Misuse of badge or pass, such as permitting others to use it can result in criminal charges under Title 18 USC 499 and 701, and barring the employee from the Detroit Arsenal property.

(d) If the contractor obtains a new or follow-on contract that again requires physical access to the Detroit Arsenal property, he shall obtain new badges for his employees, indicating the new or follow-on contract number.

The security policies described in this clause apply to any contractor employee on base in connection with any contract with TACOM-LCMC – Detroit Arsenal.

(3) MEETING ATTENDANCE. Any contractor employee attending meetings with Government employees within or outside the Detroit Arsenal boundaries, shall, at the beginning of the meeting, announce that he/she is a contractor employee. He/she must state the Contractor's name and address, and state the name of all other companies or persons that (a) currently employ him, or (b) that he currently represents. In addition, for the duration of the meetings, the contractor employee shall wear a second visible badge that displays the contractor's company name.

(4) CLASSIFIED ACCESS. If a visiting contractor is working on a classified contract, his/her visit request, with security clearance information, must be sent to the G2, TACOM LCMC (SMO Code W4GGAA* or W4GGAA5, AMSTA-CSS, Office Phone 586-282-6262, Fax 586-282-6362) and their sponsoring activity.

Government employees hosting meetings will verify contractor employee’s security clearance information with their supporting Security Coordinator or G2, TACOM LCMC using JPAS or the TACOM LCMC Access Roster prior to providing contractor access to classified information based on the approved DD254.

(5) REGULATORY COMPLIANCE. All contractor employees working on the U.S. Army installation, Detroit Arsenal, in the State of Michigan, in connection with this contract, shall conform to all applicable federal or state laws, and published rules and regulations of the Departments of Defense and Army. Also, they must comply with any existing applicable regulations promulgated by Detroit Arsenal, TACOM LCMC, or the Senior Commander.

Additionally, all contractor employees working on classified contracts shall comply with the requirements of the National Industrial Security Program (NISPOM) and Army Regulation 380-5, Department of the Army Information Security Program and their approved DD254.

(6) NON-DISCLOSURE AGREEMENT. Each contractor employee working at the Detroit Arsenal property under this contract shall sign a Non-disclosure Agreement on their company's letterhead prior to commencing work under the contract or obtaining the badges permitting access to the property. There will be one Non-disclosure Agreement for each employee. The Non-disclosure Agreement shall be in the format indicated below. A copy of the agreement will be made a part of the contract file.

FORMAT FOR

NON-DISCLOSURE AGREEMENT

I, ____________________, an employee of __________________________________________, a Contractor providing support services/supplies to Detroit Arsenal, TACOM LCMC, or other tenant organizations (hereinafter Detroit Arsenal), and likely to have access to nonpublic information (hereinafter RECIPIENT), under contract number ______________________, agree to and promise the following:

WHEREAS RECEIPIENT is engaged in delivery support services to Detroit Arsenal under contract; and

WHEREAS, It is the intention of Detroit Arsenal to protect and prevent unauthorized access to and disclosure of nonpublic information to anyone other than employees of the United States Government who have a need to know; and, WHEREAS, Detroit Arsenal acknowledges that RECIPIENT will from time to time have or require access to such nonpublic information in the course of delivering the contract services; and, WHEREAS, RECIPIENT may be given or other have access to nonpublic information while providing such services; and, WHEREAS, "nonpublic information" includes, but is not limited to such information as:

Proprietary information (e.g., information submitted by a contractor marked as proprietary. However please note:

THIS NON-DISCLOSURE STATEMENT IS NOT SUFFICIENT TO ALLOW CONTRACTORS’ ACCESS TO

ANOTHER CONTRACTOR’S PROPRIETARY INFORMATION. FOR THAT, A SEPARATE CONTRACTOR

TO CONTRACTOR AGREEMENT IS REQUIRED.);

Advanced procurement information (e.g., future requirements, statements of work, and acquisition strategies);

Source selection information (SSI) (e.g., bids before made public, source selection plans, and rankings of proposals)

(PLEASE NOTE: THIS AGREEMENT ALONE DOES NOT AUTHORIZE ACCESS TO SSI--ONLY PCO OR

SOURCE SELECTION AUTHORITY CAN AUTHORIZE SUCH ACCESS.);

Trade secrets and other confidential business information (e.g., confidential business information submitted by the contractor);

Attorney work product;

Information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers);

and

Other sensitive information that would not be released by Detroit Arsenal under the Freedom of Information Act (e.g., program, planning and budgeting system information);

NOW THEREFORE, RECIPIENT agrees to and promises as follows:

RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;

RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information of Government employees;

As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information to any unauthorized person or entity for personal, commercial, or any unauthorized purposes; and

If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the contracting officer verbally within two business days, followed up in writing within five business days.

The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, when RECIPIENT no longer performs work under the contract.

RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this Agreement will subject the RECIPIENT and the RECIPIENT's employer to administrative, civil or criminal remedies as may be authorized by law.

RECIPIENT: _____________________________ (signature)

PRINTED NAME: _________________________

TITLE: __________________________________

EMPLOYER: __________________

Site Visit A site visit is HIGHLY RECOMMENDED prior to award. Since physical site visits are currently on hold as a result of the COVID-19 pandemic, a virtual site visit will be offered via the Microsoft Teams application. You can sign up for free at https://www.microsoft.com/en-us/microsoft-365/microsoft-teams/group-chat-software. During the virtual site visit, offerors may inspect the facility. The virtual site visit will be held on 1 June 2020 at 1:00PM EST.

Offerors shall confirm attendance at the scheduled virtual site visit no later than one business day prior to the site visit by contacting the Technical POC, Scott Mroz, by phone at 586-216-2171 or by email at scott.a.mroz.civ@mail.mil. Once attendance is conformed the Technical POC will send the link to the meeting.

Questions about the site visit shall be submitted by COB 2 June 2020.

System Specifications

1. Data Acquisition and Control System

1.1. The Contractor shall provide technical details pertaining to software and hardware architecture CDRLs A001, A003 & A005. The Government is looking for an open software architecture that can be modified and manipulated by Government personnel familiar with software design (software engineer and test engineer). The open architecture software system required is a LabVIEW based system, which can be easily modified to fit the testing requirements of the Government. It is understood by the Government that LabVIEW software becomes proprietary once it is branded.

1.2. The data acquisition system is to be built and comprised of commercially available components and is intended to be an open architecture which will require user input and setup of devices and channels.

1.3. The contractor shall supply a data acquisition and control system meeting all requirements within this scope of work.

1.4. All instrumentation and measurement equipment shall be calibrated by an ISO-17025 accredited laboratory. The contractor shall provide calibration certificates and data required by ISO-17025 as well as required by GVSC in CDRL A008. In circumstances where laboratories are not accredited for the full range of the instrumentation, the calibrations shall be accredited within the range of the facility scope of accreditation. These calibrations will be valid for no less than six months from the date of final acceptance and supplied in accordance with CDRL A008.

1.5. Test Cell Automation

1.5.1. The system shall accommodate time and event driven profiles, which will allow the user to input all test cell control specifications based on a timed or event driven profile. The timed events shall be capable of being executed at a rate of one profile event per second for a sustained period of no less than 24 hours.

1.6. Automation Scripting

1.6.1. The systems shall have a native scripting system that allows programmatic access to system data, controls and variables.

1.6.2. The scripting system shall be able to utilize windows library (win32) function calls to create system standard resources.

1.6.3. The automation scripting software shall have integrated drivers for communication with existing dynamometer controllers allowing it to send serial commands to controller, i.e.: controller selection and related set points.

1.7. Data Recording

1.7.1. The system shall be able to record data at a rate of 1000 samples per second per channel for up to 5 minutes. This data must be time synchronized with and connected lower speed data collection.

1.7.2. The system shall be able to record data continuously at 10 samples per second per channel for up to 12 hours. This data will be available for storage, processing and display.

1.7.3. The system shall maintain no less than a 5-minute, 10-sample per second (Hz), round robin flight data recorder (otherwise known as post-mortem ring buffer) to capture failure data.

1.7.4. All data shall be saved in or exportable to comma separated variables (CSV) format.

1.7.5. This data shall be able to be graphically displayed real time for tracking variations throughout testing;

channels can be added and removed from graphs without requiring tests to be reloaded.

1.8. Limits and Warnings

1.8.1. The system shall have user configurable conditional limits based on startup and shutdown parameters (e.g. Engine Oil Pressure).

1.8.2. The system shall have the capacity for lookup table referenced limits (such as engine oil pressure based on engine speed).

1.8.3. The system shall have selectable high and low warnings and limits.

1.8.4. The system shall have the ability to override all limits or individual limits during test time.

1.8.5. The system shall have the ability to change limits during test time.

1.8.6. All limits will be scanned at their native sample frequency or higher.

1.9. Calibration/ channel scaling

1.9.1. The system shall be capable of 2nd order polynomial scaling of channels.

1.9.2. Calibration files shall be exportable in human readable format such as a portable document format

(PDF).

1.9.3. The system shall have selectable low pass filtering on each channel.

1.9.4. Channel scaling shall be able to be completed by one instrumentation technician, utilizing a portable control console that connects to the DAQ system for functions of creating/ modifying scale factors as well as viewing data real-time via a remote portable control console arrangement; Channel scaling and setup shall be able to be completed at the fixed control console as well.

1.10. Customizable Displays

1.10.1. The system shall have selectable display of channels.

1.10.2. The system shall have multiple types of display indicators

1.10.2.1. Dial gauge numeric indicators.

1.10.2.2. Digital numeric indicators

1.10.2.3. Graphic indicators (such as a strip chart recorder).

1.10.3. The system shall not require use of preset channel names for display and storage users shall be able to program in GVSC test engineer requested naming conventions, and shall allow a minimum of 16 alpha-numeric characters per channel name.

1.11. Data Collection Equipment

1.11.1. The contractor shall supply a National Instruments SC Express (or equal) data acquisition chassis

(PXIe-1085) equipped with 1 Chassis Controller NI RMC-8355 or equal, twelve (12) PXIe-4300, three (3) PXIe-4353, and one (1) PXIe-4357 data acquisition card. Additionally the contractor shall supply all cabling, interfacing and terminal blocks required to ensure the system is useable as configured and installed at GVSC. The contractor shall demonstrate at time of acceptance testing that the DAQ system interfaces with all above DAQ Chassis, controllers and cards described in 1.11.1.

1.11.1.1. (Test Cell 9 Option only) Contractor shall supply National Instruments SC Express (or equal) data acquisition chassis (1) PXIe-1085 equipped with Chassis controller NI-RMC-8355 (or equal), (24) PXIe-4300, (6) PXIe-4353, and (3) PXIe-4357. Additionally the contractor shall supply all cabling interfacing and terminal blocks to ensure the system is useable as configured and installed at GVSC test cell 9.

1.11.2. The contractor shall provide one NI 9145 Chassis, equipped with Two NI-9423 digital input modules, three NI9474 digital output modules, and two NI9263 analog output modules, and one NI9361 timer/ counter card. The contractor shall provide any additional hardware modules or interfaces required to make their systems function as required in this contract.

1.11.2.1. This shall be housed in a wall mounted junction box adjacent to the instrumentation junction box. Approximate size is 3’x41”x12” deep. This box shall house all the equipment, terminal blocks and power supplies related to make the device functional.

1.11.2.2. A drawing of this junction box shall be submitted prior to manufacture for approval in accordance with CDRL A005.

1.11.3. The contractor shall supply a National Instruments LabVIEW based real-time controller, which interfaces the SC Express chassis (or equal) to the data acquisition system.

1.11.4. The contractor shall supply the source code of the SC Express interface controller and an interface control document (ICD) detailing the functions and connections of the device, in accordance to CDRL A003.

1.12. Wall mounted Instrumentation Junction Box should be about 5’x70”x16”deep. A design shall be submitted to the Government for review prior to manufacture in accordance with CDRL A001.

1.12.1. The system shall be supplied with an instrumentation junction box that will serve as a connection point for all test article related instrumentation.

1.12.2. The junction box shall be mounted at a height of 19 (+ 1 inch – 0 inch) inches above the finished floor, measured to the bottom of the junction box.

1.12.2.1. Pressure transducer and other analog voltage/current channels shall utilize Phoenix Contact UTTB 2,5/2P DIN rail mounted terminal strips for wire termination. Each analog channel termination point shall include wire terminals for connection of two (2) excitation power wires (positive and negative), two (2) signal wires (positive and negative), and a signal shield wire.

1.12.3. The junction box shall be equipped with a 24-volt direct current excitation power supply (regulated) that is fuse protected and distributed to all analog voltage/current terminal strips. Each channel shall provide no less than 100 milliamps of excitation current.

1.12.4. The junction box shall provide no less than 4 linear feet of open DIN-type rail space for Government equipment utilization.

1.12.5. All signal wiring shall be shielded and the shields shall only be terminated (grounded) at the data acquisition hardware ground reference.

1.13. Existing instrumentation boom. A retrofit design of the existing instrumentation boom shall be submitted to the Government for review prior to manufacture and retrofitting in accordance with CDRL A005 to ensure it meets the system specifications set forth below.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .