Performance_Work_Statement-_ESS_Install_Patch_Barracks-_20170609.pdf

PDF 812 KB Posted

Attached to
Electronic Security System (ESS) Federal contract opportunity
Solicitation number
W564KV-17-R-0043
Issued by
Department of the Army Materiel Command Expeditionary Contracting Command Theater Contracting Center Kaiserslautern 409th CSB

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Electronic Security System (ESS), newest first.
File Type Posted
Questions_and_Answers.pdf PDF
52nd_Signal_B2319_ESS_Install_-_PWS_20170901.pdf PDF
W564KV-17-R-0043_SF_30.pdf PDF
W564KV-17-R-0043_MOD.pdf PDF
52nd_Signal_B2319_ESS_Install_-_PWS_20170901.pdf PDF
W564KV-17-R-0043_MOD.pdf PDF
W564KV-17-R-0043.pdf PDF
Exisiting_Drawings-_ESS_Installation_Patch_Barracks.pdf PDF
DD_254-_ESS_Installation-_Patch_Barracks.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

9 June 2017

52ND SIGNAL B2319 ESS INSTALL

Part 1

General Information

1. GENERAL: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personnel services contract to provide a turn-key Electronic Security System (ESS) for United States 52nd Signal Battalion. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2 Background: The U.S. Navy’s Space and Naval Warfare Command (SPAWAR) Atlantic Stuttgart Office is providing 52nd Signal with assistance in providing the necessary changes and additions for the ESS components and devices.

1.3. Scope: The Contractor shall provide non-personal services to include all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, escorting, and all other items necessary for this ESS installation. The contractor shall accomplish a turn-key ESS installation in accordance with 52nd Signal’s security requirements and the DoD Manual 5200.01 (DoD Information Security Program: Protection of Classified Information).

1.4 Objectives: The objective of this project is to provide a turn-key ESS installation including an Intrusion Detection System (IDS) and Access Control System (ACS) in accordance with 52nd Signal’s security requirements and the DoD Manual 5200.01, ultimately providing 52nd Signal with certified secure areas and security posture necessary for the occupancy of these spaces.

1.5 Period of Performance: The period of performance shall be no longer than six (6) months from the date of award.

1.6 General Information:

1.6.1 Quality Control Plan (QCP): Reserved.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: This information is contained in 5152.204-4000 U.S and Host Nation Holidays. US Holidays Work cannot be performed on U.S. holidays occurring during the normal workweek. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. Host Nation Holidays Work Can be performed on local Host Nation* holidays occurring during the normal workweek. Local host nation holidays occur in the region/state where contract performance takes place.

Both holidays are listed.

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0730-1730 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.

The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Training Holidays: USAREUR has historically granted military personnel Training Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.6.7 Place of Performance: The work to be performed under this contract will be performed at Patch Barracks, Bldg 2319.

1.6.8 Type of Contract: The government will award a Firm-Fixed Price Contract.

1.7 Security Requirements:

1.7.1 Security Program: Contractor personnel performing work under this contract must have a SECRET clearance at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.

1.7.2. Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the SECRET level in the Joint Personnel Adjudication System (JPAS) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are In Accordance With (IAW) the attached DD Form 254, Department Of Defense Contract Security Classification Specification. The Contractor shall ensure that contractor employees and sub-contractor employees performing services under this contract comply with FAR 52.204-2, Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor will ensure the employee complies with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M), and any revisions to DOD 5220.22-M, notice of which has been furnished to the Contractor. The contractor needs to send the security clearances of the workers to the USEUCOM SSO, SMO Code W092AA4 in addition to submitting the Visitor Access Request for the duration of their stay.

1.7.3 Installation Access: See clause 5152-225-4001 -- INSTALLATION CLEARANCE RERQUIREMENTS (June 2016) in basic contract. USAG Stuttgart Command Policy Memorandum #58, Local national Screening Program (LNPS) and Installation Access Control. The contractor shall provide an installation pass log within thirty

(30) calendar days after contract award. The pass log shall be updated as employees are added or removed and submitted to the COR within 5 days after changes.

Upon the termination of employment or termination/cancellation of this contract, the Contractor is responsible to collect the installation access passes. The contractor shall collect the installation access passes the same day employment of an individual has expired/terminated, and shall return them to the issuing office within three (3) workdays.”

1.7.3.1 For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1.7.3.2 For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.7.3.3 For contractors authorized to accompany the force: Reserved.

1.7.3.4 For Contract Requiring Performance or Delivery in a Foreign Country: DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives. HSH

1.7.4 Background Checks: See clause 5152.204-4008-Background Checks (June 2016) – U.S. and Host Nation Contractors. The contractor shall provide an installation pass log within thirty (30) calendar days after contract award.

The pass log shall be updated as employees are added or removed and submitted to the COR within 5 days after changes.

1.7.5 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW AR 190-13, “The Army Physical Security Program.”

1.7.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. If applicable, government issued access badges shall not be worn outside designated facilities where visible to the general public. The Contractor shall immediately report suspicious activities to security personnel.

1.7.7 Escort Requirements: The Contractor shall provide all necessary escorts as required to perform the tasking as specified within this PWS and in accordance with the applicable security requirements.

1.7.8 Access and general protection policy and procedures: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.7.9 Handling/Access to Classified Information: Reserved.

1.7.10 Threat Awareness Reporting Program: Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2- 4b.

1.8 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan, and the Contractor’s Security Plan [if applicable]. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys/key cards to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan [if applicable].

1.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.11 Key Personnel: The follow personnel are considered key personnel by the government: Project/Contract Manager, Project Engineer, Lead Installer, and System Administrator. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0800-1630 Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

Qualifications for all key personnel are listed below:

1.11.1 Special Qualifications: The contractor is responsible for ensuring all technicians possess and maintain the required vendor certifications for this ESS Installation.

1.11.1.1 Project/Contract Manager: Contractor Project/Contract Manager shall have the following qualifications/certifications:

Bachelor of Science degree in Business Administration/Management, Engineering field, or equivalent Project Management Professional certification At least six years of experience, managing similar DoD 5200 compliant projects SECRET clearance

1.11.1.2 Project/Design Engineer: Contractor Project/Design Engineer shall have the following

Bachelor of Science degree in engineering field or equivalent At least six years of experience on similar DoD 5200 compliant projects Lenel Certified

1.11.1.3 Lead Installer: Contractor Lead Installer shall have the following qualifications/certifications:

At least six years of Lenel ESS installation experience, performing installs for similar DoD 5200 compliant projects

Lenel Certified

1.11.1.4 System Administrator: Contractor System Administrator/Programmer shall have the following

At least six years of Lenel ESS programming experience, performing installs for similar ICD/ICS 705 compliant projects

Lenel Enterprise Certified TOP SECRET/SCI clearance

1.11.1.4 Other Certifications: Contractor personnel performing any work on any system, component, or device requiring vendor certification shall hold this certification prior to installation. Specifically, contractor personnel performing any work involving the Lenel system, Pelco system, Kaba-Mas or any of these system/device components shall have the proper Lenel, Pelco, and Kaba-mas certification.

1.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel identification shall be easily identifiable through the display of badges IAW AER 27-715 Contractor Identification.

Contractor personnel shall obtain a Stuttgart Community badge and display this badge when working in secure areas.

1.13 Contractor Travel: Reserved.

1.14 Other Direct Costs: Reserved.

1.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents, drawings, and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/dodimagery/commercialuse.html. The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.

1.16.1 Non-Disclosure Statements: Reserved.

1.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5.

The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.18 Phase In /Phase Out Period: Reserved.

1.19 Safety: The Contractor shall comply with all National Fire Protection Association (NFPA) codes and regulations applicable to this installation.

1.19.1 Safety Plan and Program: Reserved.

1.20 Environmental Compliance: The Contractor shall comply with all host nation environmental requirements.

All removed, unused, or left-over equipment and/or material must be disposed of in compliance with host nation requirements and is the responsibility of the Contractor.

1.20 Environmental Compliance Plan and Program: Reserved.

1.21 Required Training:

1.21.1 Anti-Terrorism (AT) Level I Training: All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

1.21.2 OPSEC Training: Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. Level I OPSEC training is available at the following website:

http://cdse.edu/catalog/elearning/GS130.html (Duration: 45 minutes).

1.21.3 iWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

1.21.4 Information Assurance (IA) Training and Certification:

1.21.4.1 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems: All contractor employees with access to a government info system must be registered in the ATCTS (Army Training & Certification Tracking System) at commencement of services, and must successfully complete the DOD Cybersecurity Awareness prior to access to the IS and then annually thereafter.

Adhere to local policies regarding network/domain account documentation, training, and other requirements to receive and maintain network/domain access (i.e. annual signature of acceptable use policy, completion of DD Form 2875 for requesting network access, and other local service provider account maintenance requirements).

1.21.4.2 For information assurance (IA)/information technology (IT) training: All contractor employees and associated sub-contractor employees must complete the DoD CS awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8140.01, DoD 8570.01-M, AR 25-2, and local IA training/certification and account management policies within six months of appointment to IA/IT functions.

1.21.4.3 For information assurance (IA)/information technology (IT) certification: Per DoD 8570.01-M , DFARS 252.239.7001, AR 25-2, and local IA training/certification and account management policies, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award. Additionally, computing environment certifications must be obtained within 180 days of appointment to a privileged/administrator position per DoD 8570.01-M or employees risk loss of privileged access.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms:

2.1 Definitions:

Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the government.

The term used in this contract refers to the prime.

Contracting Officer - A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

Contracting Officer's Representative (COR) - An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

Defective Service - A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable - Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

Key Personnel - Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

Physical Security - Actions that prevent the loss or damage of Government property.

Quality Assurance - The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Quality Assurance Surveillance Plan (QASP) - An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

Quality Control - All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Subcontractor - One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless specified otherwise.

2.2 Acronyms:

ACAS Assured Compliance Assessment Solution ACOR Alternate Contracting Officer's Representative ACS Access Control System AFARS Army Federal Acquisition Regulation Supplement APL Approved Products List AR Army Regulation AT Anti-Terrorism CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DIARMF Defense Information Assurance Risk Management Framework DISA Defense Information Systems Agency DMDC Defense Manpower Data Center DOD Department of Defense eMASS Enterprise Mission Assurance Support Service ESS Electronic Security System FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Assurance IDS Intrusion Detection System KO Contracting Officer NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operational Security PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCAP Security Content Automation Protocol SPAWAR Space and Naval Warfare Command STIG Security Technical Implementation Guide TE Technical Exhibit UC Unified Capabilities

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. Government Furnished Items and Services:

3.1 Services: Reserved.

3.2 Facilities: Reserved.

3.3 Utilities: The Government will provide all utilities available in the facility for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the faucets, turning off lights, and powering off equipment at the end of the work day.

3.4 Equipment: Reserved.

3.5 Property Management: For all issued GFP for this contract, the contractor shall submit a property management plan within thirty (30) days of contract award to COR and KO that addresses the requirements as listed in FAR Clause 52.245-1, Government Property. Contractor shall ensure GFP is maintained IAW AR 735-5, Policies and Procedures for Property Accountability, in addition to the aforementioned clause.

3.6 Materials: The Government will provide any existing drawings of the places of performance that are available.

3.7 Training: The government will provide training as outlined in section 1.21 of this PWS.

3.8 Common Access Cards (CAC): If required for tasking within this PWS, the Government will provide Common Access Cards (CAC) via the Trusted Associate Sponsorship System (TASS) (Web site https://www.dmdc.osd.mil/tass/

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Items and Responsibilities:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Facility Security Clearance: The contractor shall possess and maintain a SECRET facility clearance from the Defense Security Service IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM) and AR 380-49, Industrial Security Program. The Contractor’s employees, performing work in support of this contract shall have been granted a SECRET personnel security clearance from the Defense Industrial Security Clearance Office. The Facility Security Clearance must match the highest security clearance required for personnel.

The DD 254, Department Of Defense Contract Security Classification Specification is provided as an attachment in the basic contract.

4.3 Materials: The Contractor shall provide all materials/equipment necessary to meet the requirements of this

PWS.

4.4 Equipment: The Contractor shall provide all vehicles, tools, ladders, safety equipment, testing equipment, lifting and drilling equipment to meet the requirements under this PWS.

4.5 Common Access Cards (CAC): The contractor shall provide the following information: Last, First Middle Name, Cadency Name, Person identifier (SSN, FIN, or TIN), date of birth, primary email (this email will used to contact the individual) to the COR with 15 calendar days after award. The contractor shall provide a CAC log within the first 30 calendar days after contract award and within 5 calendar days after changes have been made. The COR will provide the format and content. Note CACs are Government property and must be accounted for.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The contractor shall develop the Installation Design Plan (IDP), and based on the approval (by Government) of this IDP, shall procure and install ESS devices for this 52nd Signal Building 2319 ESS Installation.

The Contractor shall comply with the DoD 5200.01. In addition, the Contractor shall abide to standards and regulations specified in PWS, Section 6.

5.2 Meetings, Conferences, and Briefings: The Contractor shall attend in-person all the meetings relevant to the Building 2319 ESS Installation and closely coordinate access/survey/materials delivery/installation/testing with Government representative, tenants, Command Security and all other stakeholders.

The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Project Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

5.3 Coordination Support: Contractor shall work closely with the SPAWAR Government Project Manager, Technical Point of Contact (TPOC), and support the needs of the project at the sponsor level. On-site coordination of meetings, developing agenda items, attending at high-level meetings, generating minutes, and tracking action items shall be required. Support may require a contractor to recommend policies, doctrine, tactics, and procedures at the DoD, Federal, State, and Local level given their past expert opinion or using analysis of actual outcomes.

Project support may require significant coordination and interface with various DoD and non-DoD activities located in and out of OCONUS.

5.4 Plans of Action and Milestone (POA&M): The Contractor shall develop and upkeep a POA&M throughout the life of the contract, to ensure that all deliverables are submitted on time and that the project is aligned with other stakeholders’ efforts.

5.5 IDP Development: The contractor shall develop an Installation Design Plan for the tasking outlined in this

PWS.

5.5.1 The 90%/As-built IDP drawings shall be provided with customization to account for unique elements associated with building 2319. Each design deliverable shall be subject to a SPAWAR TPOC and stakeholder design review approval process, with comments to be incorporated into the next design revision. The contractor shall revise an existing IDP and modify to meet modified Shore Installation Process Handbook (SIPH) format with submittals for approval at conceptual design (30%), equipment specifications (60%), construction (90%), and project completion (100%) stage. An example of the modified SIPH format will be provided upon request and within ten

(10) days after award. The IDP shall be developed to convey the installation and operational provisions of the installation in sufficient detail to ensure no misunderstanding of design intentions or functional capabilities. All other devices and equipment within this building shall be included in this packages for building 2319 to include any equipment that is existing. Each building, if applicable, shall have its own package prepared. If any equipment or devices are not modified by this tasking, the existing IDPs shall be used to be incorporated into this new package.

The IDPs shall be created using AutoCAD 2012 or latest version, and provided electronically in PDF and CAD. For the As-built IDP, the contractor shall provide electronically in PDF and CAD format.

5.5.2 The design reviews shall be structured and include at a minimum the following sections for each review.

5.5.2.1 30% Design Review:

020: Vicinty Site Map 040: Floorplan 060: Simplified Block Diagrams 160: Cable Routing Layout

5.5.2.2 60% Design Review Sections from 30% Review updated as necessary 022: Master Parts List (Excel version) 040: Floorplans and Elevations 070: Cabling Block Diagrams (utilize 060's to begin)

5.5.2.3 90% Design Review

Sections from 60% Review updated as necessary 022: Master Parts List (CAD version) 040: with bubble call outs 070: with bubble call outs 080: Cable Run Sheets 120: Labeling 130: Patch Panel Layouts 140: Power Distribution (if needed) 180: Misc. Install Details

5.6 Materials Procurement: The Contractor shall procure all the equipment/materials listed in the IDP and any other miscellaneous materials required for installation not specifically identified within the IDP to produce an operational and functioning system.

5.7 Materials Storage/Site Delivery: The Contractor shall store procured installation equipment/materials in the local Contractor provided storage facility. The Contractor shall coordinate and deliver installation equipment/materials in a Just-In-Time manner.

5.8 Installation: The Contractor shall install all equipment/materials in accordance with this PWS and the DoD 5200.01, All Volumes (Latest Revision). The requested equipment has to be brand name or equal to below:

Installation requirements: The requested equipment is to be brand name or equal to the list of equipment provided in this PWS. Equivalent equipment is acceptable that meet or exceed requirements and specifications of the example parts and requirements within this PWS.

5.8.1 Building 2319

5.8.1.1. Large Work Area Zone:

5.8.1.1.1. Zone Main Entry, Room 115

5.8.1.1.1.1. Procure and Install one (1) CDX-10 High Security Combination Lock

5.8.1.1.1.2. Procure and Install one (1) Multi-Class Entry Card Reader w/ PIN pad (RPK40)

5.8.1.1.1.3. Procure and Install door hardware consisting of two (2) Magnetic Locks, two (2) High Security Switch

(HSS-L2D-000) Door Sensors, and one (1) Request-to-Exit Button

5.8.1.1.1.4. Procure and Install one (1) 360 degree PIR motion detection device to protect interior space

5.8.1.1.1.5. Procure and Install one (1) Arming Control Unit (LNL-CK) on the secure side of the main entry door including one (1) Multi-Class Mini-Mullion Reader (RP10) and one (1) LED Status Display

5.8.1.1.1.6. Procure and Install emergency hardware consisting of one (1) Emergency Exit Button and one (1) Exit

Alarm Annunciator with Strobe (RED) and one (1) Key Base.

5.8.1.1.2. Conference Room, Room 116

5.8.1.1.2.1. Procure and Install one (1) Intelligent System Controller (LNL-2220), and one (1) Alarm Input Module

(LNL-1100), and one (1) Fiber Transceiver inside a suitable Lenel enclosure

5.8.1.1.2.2. Procure and install one (1) power supply in separate enclosure sufficient to power the ESS equipment and provide battery backup sufficient for eight (8) hours of battery uptime.

5.8.1.1.3. Second Floor Emergency Exit

5.8.1.1.3.1. Procure and Install one (1) 360 degree PIR motion detection device to protect interior space

5.8.1.1.3.2. Procure and Install one (1) High Security Switch (HSS-L2D-010) Door Sensor

5.8.1.1.3.3. Procure and Install emergency hardware consisting of one (1) Exit Alarm Annunciator with Strobe

(RED) and one (1) Key Base.

5.8.1.1.3.4. Procure and Install one (1) door hardware set consisting of a blank exterior and handle on the interior for free egress in case of an emergency.

5.8.1.1.4. Communication Room, Room 117

5.8.1.1.4.1. Procure and Install one (1) Fiber Transceiver

5.8.1.2 S2 Office (108) and Conference Room (107) Sound Attenuation Tasking

5.8.1.2.1. Procure and Install two (2) White Noise Generator amplifiers

5.8.1.2.2. Procure and Install four (4) Speakers placed to prevent the overhearing of information through doors between these spaces.

5.8.1.2.3. Provide easy button activation/deactivation of speakers from a to-be-determined desk in each room.

5.8.1.3 Staff Section Zone:

5.8.1.3.1. Zone Main Entry

5.8.1.3.1.1. Procure and Install one (1) CDX-10 High Security Combination Lock

5.8.1.3.1.2. Procure and Install one (1) Multi-Class Entry Card Reader w/ PIN pad (RPK40)

5.8.1.3.1.3. Procure and Install door hardware consisting of one (1) Electric Strike, one (1) High Security Switch

(HSS-L2D-000) Door Sensor, and one (1) door hardware set consisting of a stationary knob exterior and handle on the interior for free egress in order to work with new access control.

5.8.1.3.1.4. Procure and Install one (1) Arming Control Unit (LNL-CK) on the secure side of the main entry door including one (1) Multi-Class Mini-Mullion Reader (RP10) and one (1) LED Status Display

5.8.1.3.2. Office TBD Location

5.8.1.3.2.1. Procure and Install one (1) Intelligent System Controller (LNL-2220), and three (3) Alarm Input

Modules (LNL-1100), and one (1) Fiber Transceiver inside a suitable Lenel enclosure

5.8.1.3.2.2. Procure and install one (1) power supply in separate enclosure sufficient to power the ESS equipment and provide battery backup sufficient for eight (8) hours of battery uptime.

5.8.1.3.3. First Floor Emergency Exit

5.8.1.3.3.1. Procure and Install one (1) High Security Switch (HSS-L2D-010) Door Sensor

5.8.1.3.3.2. Procure and Install emergency hardware consisting of one (1) Exit Alarm Annunciator with Strobe

(RED) and one (1) Key Base.

5.8.1.3.3.3. Procure and Install one (1) door hardware set consisting of a blank exterior and handle on the interior for free egress in case of an emergency.

5.8.1.3.4. Second Floor Emergency Exit

5.8.1.3.4.1. Procure and Install one (1) High Security Switch (HSS-L2D-010) Door Sensor

5.8.1.3.4.2. Procure and Install emergency hardware consisting of one (1) Exit Alarm Annunciator with Strobe

(RED) and one (1) Key Base.

5.8.1.3.4.3. Procure and Install one (1) door hardware set consisting of a blank exterior and handle on the interior for free egress in case of an emergency.

5.8.1.3.5. Volumetric Coverage

5.8.1.3.5.1. Procure and Install thirty-four (34) Motion Detectors throughout the first and second floor to cover windows and door openings.

5.8.1.3.6. Communication Room, Room 117

5.8.1.3.6.1. Procure and Install one (1) Fiber Transceiver

FIGURE 5.8.1 Building 2319 Preliminary Device Layout

FIGURE 5.8.2 Building 2319 Preliminary Device Layout (Continued)

5.9 Information Assurance (IA) Requirements:

5.9.1 The contractor shall update existing network diagrams and IA artifacts currently uploaded to the Enterprise Mission Assurance Support Service (eMASS) to include required scans of installed equipment. Artifacts include, but are not limited to, the Boundary Diagram, Hardware/Software Lists, Ports, Protocols, and Services List, Data Flow Diagram, and all related security checklists and scans to include Defense Information Systems Agency (DISA) Security Technical Implementation Guides (STIG) checklists, Security Content Automation Protocol (SCAP) Scans, and Assured Compliance Assessment Solution (ACAS) scans for all added/modified network equipment, workstations, servers, and any device with an IP address. Existing artifacts will be made available post-award.

Vulnerability scanner will be provided for use.

5.9.2 Equipment installed must be compatible with the USAG-S Enterprise ESS and must meet the Defense Information Assurance Risk Management Framework (DIARMF) requirements and latest STIGs.

5.9.3 Any network switch installed shall be on the DISA Unified Capabilities (UC) Approved Products List

(APL)

5.10 Vendor and Equipment Specifications: Specific vendor equipment is specified in this PWS for estimation purposes and quality requirements. Equivalent equipment is acceptable that meet or exceed requirements and specifications of the example parts and requirements within this PWS. Specific quantities of logic boards, devices, and modules are provided as an estimate. The Contract shall procure and install all necessary boards, modules, devices, connectors, media converters, transceivers, network devices, patch panels, and all other supporting devices to ensure an operational and functional end product that meets the security requirements for these spaces.

5.11 System Operational Verification Test (SOVT): The Contractor shall develop and perform the SOVT per Government specifications and in the latest SOVT Preparation and Execution Guide (SPEG) for all newly installed ESS and CCTV devices as well as the existing systems transitioned by the Contractor. The SOVT Plan will include procedures for verifying the technical and functional requirements. Contractor shall include test procedures and equipment in accordance to industry best practices and DoD guidelines (PWS Para 6.1).

5.11.1 Fiber Cabling Testing: For fiber optic cabling, Contractor shall perform bi-directional Optical Time Dispersion Reflectance (OTDR), Power Loss, Chromatic Dispersion (CD) and Polarization Mode Dispersion (PMD) testing, in accordance with PWS Reference 6.1.26. Contractor shall capture and incorporate test results within Government acceptance SOVT.

5.11.2 CAT6 Cabling Testing: For CAT6 cabling, Contractor shall perform “Permanent or Basic Link” testing in accordance with PWS Reference 6.1.26.

5.11.3 Grounding Testing: For grounding cabling, Contractor shall perform ground resistance test in accordance with PWS Reference 6.1.11 – 6.1.20, 6.1.25, 6.1.26.

5.12 Site Cleanup: The Contractor shall keep the work area clean and dispose of any waste and excess debris, in accordance with Host Nation laws/codes, at the end of each work day. The Contractor shall remove all legacy and unused equipment and/or material from the site and dispose according to site or Defense Reutilization Management Office (DRMO) requirements.

5.13 Closeout Package: The Contractor shall provide to the Government the final turnover documents electronically via AMRDEC SAFE File Exchange to include:

a) Final documentation of operation and maintenance manuals.

c) Compiled baseline and final project schedules in a single document.

d) Completed SOVT and Test Results.

e) Compiled inventories in a single spreadsheet file.

f) Compiled system warranties and identifying recurring costs (if applicable) in a single document.

g) Compiled As-built drawing package (PDF and CAD)

The Contractor shall not place its company logo, name, or reference anywhere within these documents or on media containing these documents (PWS para 1.15)

5.14 Warranty: The contractor shall warranty the work performed as defined in this PWS for a period of one year from date of final acceptance of the system. The warranty shall include all parts, materials, travel, and labor. This warranty shall exclude user error and system hardware issues that fall outside of the comprehensive manufacturer warranty (such as destruction of hardware due to electrical surges, force of nature, etc.). The contractor shall provide Return Merchandise Authorization (RMA) support within the warranty period for hardware issues that fall within the comprehensive manufacture warranty. Work performed must meet manufacturer requirements in order to not void or otherwise negate the manufacturer provided warranty.

5.15 Enterprise-Wide Contractor Manpower Reporting Application (eCMRA): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for EUCOM via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .