Appendix_C-_SUBMITTAL_REGISTER__25_Feb_19.pdf
PDF 77 KB Posted
- Attached to
- BLDG 212 Chiller Federal contract opportunity
- Solicitation number
- W52P1J19R5008
About this file
Appendix C - Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W52P1J195008_Ammendment.pdf | ||
| Appendix_D_-_ENGINEERING_GRAPHICS_STANDARD_13_Jun_16.pdf | ||
| W52P1J19R5008_Solicitation.pdf | ||
| Attachment_0001_-_212_CHILLER_SOW_22_Apr_19.pdf | ||
| Attachment_0002_-_RIA_ACCESS_CONTROL_RECORDS_CHECK_REQUEST_FORM.pdf | ||
| Appendix_E_-_NON-HAZARDOUS_CONSTRUCTION_&_DEMOLITION_DEBRIS_SUBMITTAL_FORM_13Jun16.pdf | ||
| Attachment_0003-_DAVIS_BACON_WAGE_DETERMINATION_05.17.2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
Replace 30 Ton Chiller and Associated Pumps
01 78 00 SD-03 Product Data 1.5Spare Parts Data
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications 01 91 00.15 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
1.7.1 GLead Commissioning Specialist
SD-06 Test Reports
3.1.3.2 GPre-Functional Checklists
3.2 G DOCommissioning Report
SD-07 Certificates
1.8 GCertificate of Readiness
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
03 30 53 SD-03 Product Data
2.2 GMix Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
03 30 53 2.2Ready-Mix Concrete 23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
2.4 GMiscellaneous Materials
2.5 GSupporting Elements
1.2 GEquipment Foundation Data
SD-05 Design Data
2.1 GPipe and Fittings
2.2 GPiping Specialties
2.3 GValves
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
23 05 93 SD-06 Test Reports
1.5.5.1 GTAB Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Firm
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3Equipment Insulation Systems
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES
23 09 00 3.2 GFinal As-Built Drawings SD-03 Product Data
1.7.3Programming Software 1.7.4Controller Application Programs 1.7.1Configuration Software 1.7.2Controller Configuration Settings
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
SD-10 Operation and Maintenance Data
3.6 GOperation and Maintenance
(O&M) Instructions
23 64 10 SD-03 Product Data
2.4 GWater Chiller
1.6.1Verification of Dimensions 3.4Demonstrations 2.5.1Refrigerant 3.3.1Water Chiller - Field Acceptance
Test Plan SD-06 Test Reports
3.3Field Acceptance Testing 3.3.2Water Chiller - Field Acceptance
Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES
23 64 10 SD-07 Certificates
3.1.6 GRefrigeration System
1.3.1Ozone Depleting Substances
Technician Certification SD-08 Manufacturer’s Instructions
3.1 GWater Chiller - Installation
Instructions
SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.2 SIndoor Air Quality During
Construction 23 64 26 SD-03 Product Data
2.2.2.4 GGrooved Mechanical Connections
For Steel
2.3.3 GGrooved Mechanical Connections
For Copper
2.4.4 GCalibrated Balancing Valves
2.4.5Pump Discharge Valve
2.4.6 GWater Temperature Regulating
Valves
2.6 GPumps
2.5.2Combination Strainer and Pump
Suction Diffuser
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES
23 64 26 2.7Expansion Tanks 2.8Air Separator Tanks
SD-06 Test Reports
3.4.2 GPressure Tests Reports
SD-10 Operation and Maintenance Data
2.4.4 GCalibrated Balancing Valves
2.4.5 GPump Discharge Valve
2.4.6 GWater Temperature Regulating
Valves
2.6 GPumps
2.5.2 GCombination Strainer and Pump
Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
25 08 10 SD-06 Test Reports 3.1UMCS and Building Level DDC
Testing Sequence
3.5 GPerformance Verification Test
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES
26 05 00.00 40 2.1.3 GOutlet Boxes, Pull Boxes and Junction Boxes
SD-06 Test Reports
3.3 GContinuity Test
3.3 GPhase-Rotation Tests
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
3.1Cable Manufacturing Data
26 05 71.00 40 SD-02 Shop Drawings
3.1 GProtective Devices
SD-03 Product Data
2.1.1 GFuses
SD-08 Manufacturer’s Instructions
3.1 GProtective Devices
26 20 00 SD-03 Product Data
2.6 GSwitches
SD-07 Certificates
2.7 GFuses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it.