W519TC25Q2109.pdf

PDF 322 KB Posted

Attached to
155MM Obturator Rings Federal contract opportunity
Solicitation number
W519TC-25-R-2109
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a Request for Quotations (RFQ) from Army Contracting Command - Rock Island (ACC-RI) for 155mm Obturator Rings to be produced at Pine Bluff Arsenal. The solicitation seeks 7,100 Obturator Rings under CLIN 0001, with an additional 20 pre-production sample rings under CLIN 0002, and a 100% option for another 7,100 rings under CLIN 0003. The requirement is a firm fixed-price simplified acquisition under FAR Part 13, with delivery to Pine Bluff Arsenal by September 30, 2025 for the base quantity and within one year for the option quantity.

Key technical requirements include first article and lot acceptance testing, certificate of conformance, and certified material test reports for each lot delivery. Vendors must be registered in the System for Award Management (SAM), provide their CAGE and DUNS numbers, and access technical drawings via a certified DD2345 process. The contract will be awarded to the most responsive, responsible offeror with the lowest price, with quotes due by March 26, 2024, and quotes remaining valid for 60 days. Payment will be processed through Wide Area Workflow (WAWF), and the contract includes a three-year warranty on the supplied items.

View the file

Other files for this federal contract opportunity

Other files attached to 155MM Obturator Rings, newest first.
File Type Posted
Exhibit A - Contract Data Requirements List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PINE BLUFF ARSENAL

504TH STREET, BLDG 53 990 CENTRAL RECEIVING P

PINE BLUFF AR 71602

TEL: FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W519TC25Q2109 07-Mar-2025 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

26-Mar-2025(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

309-782-5454MICHELLEANN G. SANCHEZ

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W519TC25Q2109

Section A - Solicitation/Contract Form

EXECUTIVE SUMMARY

1. Army Contracting Command – Rock Island (ACC-RI) has a requirement for Obturator Rings in support of the 155mm Production at Pine Bluff Arsenal (PBA). This requirement is a non-commerical simplified acquisition under FAR part 13, Simplified Acquisition Procedures.

CLIN 0001: 7,100 each Obturator Rings IAW Drawing 10542907 CLIN 0002: Pre-Production Sample 20 each Obturator Rings IAW Drawing 10542907 CLIN 0003: 100% Option 7,100 each Obturator Rings IAW Drawing 10542907

The result of this solicitiation is a Firm Fixed Price Contract. Award will be made to the offeror with the most responsive, responsible offer that represents the lowest price.

2. NOTE: ALL CARRIER SHIPMENTS MUST BE SCHEDULED IN ADVANCE. SEE ADDITIONAL

INFORMATION SECTION FOR FURTHER DETAILS.

Delivery shall be made to the following address:

US Army, Pine Bluff Arsenal Central Shipping Receiving Point (CSRP) Bldg 53-990, 504th Street Pine Bluff, AR 71602

3. First Article and Lot Acceptance Testing required. Certificate of Conformance and Certified Material Test Report required upon each lot delivery.

4. Inspection and Acceptance is Destination. FOB is Destination, Pine Bluff Arsenal.

5. For the contract resulting from this solicitaion, the payment will be made by DFAS via Wide Area Workflow (WAWF). More information can be found at DFARS 252.232-7006, WIDE AREA

WORKFLOW PAYMENT INSTRUCTIONS.

6. QUOTES ARE DUE TO THE POINT OF CONTACT NO LATER THAN 26 MARCH 2024 AT

12:00PM CST:

a. Contractor is liable for ACCURACY of submitted quotes and for any incurred costs if quote was submitted erroneously.

b. Electronic Invoicing instructions shall be provided at time of award. A DD250 will be required.

c. Quotes submitted in response to this solicitation shall remain valid for 60 days.

d. Contractors must be registered in the System for Award Management (SAM) in order to be eligible for an award with the U.S. Government. Application to this site can be found under the following link: www.sam.gov. Failure to comply with SAM registration may deem a quote ineligible for award.

e. Please provide your CAGE Code.

f. Please provide your DUNS number.

7. The following Attachment and Exhibit are incorporated to the solicitation and subsequent contract:

Attachment 0001 - Drawing 10542907 Exhibit A – CDRL A0001

8. The point of contact for this requirement is MichelleAnn Hulett at michelleann.g.hulett.civ@army.mil.

ADDITIONAL INFORMATION

QUALITY REQUIREMENTS: INSPECTION, ACCEPTANCE, QUALITY ASSURANCE, AND RELIABILITY

INSPECTION AND ACCEPTANCE:

Inspection and acceptance will be at destination, unless otherwise provided herein. Until delivery and acceptance, and after any rejections, risk of loss will be on the contractor, unless loss results from negligence of the United States Government.

PACKAGING (PRESERVATION/PACKING/MARKING):

Containers shall be clearly marked, at a minimum, with the information as follows:

a.Name of contractor b.Contract / Purchase Order Number c.Description of items contained therein d.Lot / Batch Number(s)

For packing requirements, see the Engineering Release Record.

ACCEPTANCE OF PRODUCT: MIL-STD-1916

The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

SUBMISSION OF PREPRODUCTION SAMPLES:

a. Preproduction Sample. The Preproduction Sample consisting of the items listed below,shall be (i) representative of items to be manufactured using the process andprocedures as contract production and

(ii) inspected and tested to all contract drawing& specifications requirements.

REPRODUCTION SAMPLE ITEMS:

QUANTITY: ___20_______

ITEM NOMENCLATURE: ___OBTURATOR_____

DRAWING/SPECIFICATIONS: _10542907, MIL O 60540______

b. The approved Preproduction Sample will not serve as a manufacturing standard.

c. The contractor shall notify the Contracting Officer within ___10__ calendar days prior to production of the Preproduction Sample so that the Government may witness theproduction if desired.

d. The contractor shall submit the Preproduction Samples within _____ calendar days fromthe date of this contract to the address given in the delivery/shipping instructions of thisorder/contract marked "PREPRODUCTION SAMPLES: Contract No. TBD Lot/Item No. ____TBD___________”. Within _15____ calendar days after the Government receives the Preproduction Samples, the Contracting Officer shall notify the contractor,in writing, of the conditional approval or disapproval of the Preproduction Sample. Thenotice of conditional approval or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditionsof this contract. A notice of conditional approval shall state any further action requiredof the contractor. A notice of disapproval shall cite reasons for the disapproval.

e. If the Preproduction Sample is disapproved, the contractor, upon Government request,shall make any necessary changes, modifications, or repairs to the PreproductionSample or submit another Preproduction Sample for Government inspection. All costsrelated to these submissions are to be borne by the contractor, including any and all costs for additional samples following a disapproval. The Government shall take action on the resubmitted Preproduction Sample within the time specified in paragraph (c) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these resubmissions.

f. If the contractor fails to deliver any Preproduction Sample on time, or the Contracting Officer disapproves any Preproduction Sample, the contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

g. Unless otherwise provided in the contract, and if the approved Preproduction Sample is not consumed or destroyed by testing, the contractor may deliver the approved Preproduction Sample as part of the contract quantity if it meets all contract requirements for acceptance.

h. If the Government does not act within the time specified in paragraph (c) or (d) above, the Contracting

Officer shall, upon timely written request form the contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

i. Before the Preproduction Sample approval. The acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the contractor. Before Preproduction Sample approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

j. The Government may waive the requirement for Preproduction Samples where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

k. The contractor shall produce both the Preproduction Sample and the production quantity at the same facility and shall submit a certification to this effect with each Preproduction Sample.

CARRIER INSTRUCTIONS FOR PINE BLUFF ARSENAL

PINE BLUFF ARSENAL WORKING HOURS

Receiving hours for BLDG 53-990 are 0630-1430 (6:30 AM – 2:30 PM CST) Monday through Thursday. No shipments will be accepted on Fridays.

All Carriers delivering or picking up must enter through Dexter Gate (commercial truck gate) on or before 2:30p.m.

unless prior arrangements have been made.

Shipments will not be received on designated Government holidays as follows: New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Juneteenth Holiday, 4th of July, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day, or any additional holidays granted by the President of the United States. If the holiday falls on a Sunday, the holiday will be observed on the following Monday. The TFG (Transportation Facilities Guide) is updated on a regular basis with any and all closings or special instructions. If you do not have access to the TFG and have questions regarding hours of operation, please contact the Transportation Office at the numbers provided below to schedule an appointment.

To obtain access to schedule appoints in the Carrier Appointment System, you may follow the instructions below:

The Carrier Appointment System (CAS) is now housed under "TEAMS" To register for a TEAMS account you will follow the steps below:

1.) Go to Caution-https://eta-teams.transport.mil 2.) Accept the "USG- Authorized Use Only" banner.

3.) You will choose the fourth option in the center of the page "Register as a new user". At this point you will input pertinent information that is asked/required.

If you are unable to register, you may call

Mr. Jon Reed at 870-540-3610, Ms. Darrilyn Brittian at 870-540-3765 or Ms. Linda Wallace at 870-540-3816 and an appointment will be created in CAS for you. You will need to email a copy of the bill of lading to us in accordance with the delivery appointment.

Delivery Address and GPS Info:

Ship to Pine Bluff Arsenal (PBA):

US Army, Pine Bluff Arsenal Central Receiving & Shipping Point (CRSP) Bldg 53-990, 506th Street Pine Bluff AR 71602

* Instructions for GPS:

Intersection Search: search intersection of Wise Road and Dollarway Rd in White Hall AR 71602 LAT/LON Search: 34°18'59.8"N 92°06'31.7"W (34.316610, -92.108798)

OR

FOR NAVIGATION SYSTEMS/GPS: Wise Road and Dollarway Road, White Hall, AR 71602. This will take you to where you turn to enter Dexter Gate.

To reach a Specific POC, for this information, please see below:

PBA Transportation Inbound, Mr. Jon Reed, phone (870) 540-3610 alternate 3765 PBA Transportation Officer, Ms. Linda K. Wallace, phone (870) 540-3816 CRSP Supervisor, Mr. Wayne Lainhart, (870) 540-3134, Cell (870) 550-8703; darrell.w.lainhart.civ@mail.mil

TECHNICAL DATA PACKAGE

TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF

RESTRICTED TECHNICAL DATA

(a) TDPs will be obtained electronically via the Contracting Opportunities posting for this requirement on the Sam.Gov website. You must have an account prior to accessing any TDP(s). To register for an account in Sam.Gov, please visit https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select “create account”. The toll free helpdesk phone number is (866)606-8220 and for International (334) 206-7828. Vendors are responsible for placing correct information in Sam.Gov.

(b) You may need to use special software to view the documents that are posted on Sam.Gov. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or Lucent viewers to view the TDP(s) and are available as freeware at:

ImageR Viewer: http://g6msd.redstone.army.mil Lucent Viewer: http://www.ec-edi.com/

(c) The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in Contracting Opportunities (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.

(d) FOR UNRESTRICTED TDP(s):

(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the solicitation posting. The TDP and all necessary TDP documents will be posted under the “Attachments / Links” tab. You must have a Sam.Gov account prior to accessing the TDP.

(2) To access the TDP(s), click directly on the document you want to view under the “Attachments / Links” tab.

You will be prompted for your username and password prior to gaining access to the TDP.

CLIN: N/A

TDPL Date: N/A

(e) FOR RESTRICTED TDP(s):

TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDPs and any other related documents are posed with various options, such as Restricted and Export Control. These additional controls are described below:

(1) Access to RESTRICTED TDP(s):

TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid Contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the requested information. To request access log in to Sam.Gov, go to the applicable solicitation under Contracting Opportunities within Sam.Gov, select the “Attachments / Links” tab, and then click on the Request Explicit Access button. A copy of an approved DD2345 for the data custodian making the request will need to be provided to the Contract Specialist via email for this procurement to be approved explicit access. If the Data Custodian hasn’t changed from the initial submission, then the approved DD2345 OCT 2022 is valid for 5 years.

Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access to the TDP.

Please allow 2-3 working days to process your request. You will receive a system generated email from donotrely@sam.gov saying “A Notice Manager from ACC-RI has updated your access to Controlled Documents.

Click here to sign in and view the request details or go to the notice to access the Controlled Documents.” If your request is denied you will be able to see further details of why you were and how to proceed. .

(2) Access to EXPORT CONTROL TDP(s)

(i) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid Contractor login credentials. In addition, to obtain access to these TDP(s), vendors and Contractors must have a current DD 2345, Military Critical Technical Data Agreement on file with the Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Military Critical Technical Data Agreement on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/, click on Documents and follow the instructions provided. Processing time is estimated at five (5)working days after receipt.

(ii) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to Sam.Gov, go to the applicable solicitation under Contracting Opportunities within Sam.Gov, select the “Attachments / Links” tab, and then click on the Request Explicit Access button. The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP. You will receive a system generated email from donotrely@sam.gov saying “A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents.” If your request is denied you will be able to see further details of why you were and how to proceed.

(iii) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.

(iv) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979. as amended, Title 50, U.S.C., App. 2401 et.

seq.

CLIN: Various TDPL Date: Various

(3) Further dissemination of Restricted TDP(s) must be in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is REQUIRED to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning or melting any physical copies of the TDP and/or deletion of removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

(f) Questions related to registration in Sam.Gov should be directed to https://fsd.gov/fsd-gov/home.do. The helpdesk phone number is (866)606-8820. Vendors are responsible for placing correct information in Sam.Gov. A user guide for am.Gov can be found here: https://dodprocurementtoolbox.com/site-pages/contract-opportunities

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 7,100 Each 155mm Obturator Rings

FFP

Purchased in accordance with Drawing 10542907.

First Article Testing and Lot Acceptance Testing required. Certificate of Conformance required with each delivery. Material certifications required with each shipment to PBA.

CDRL in accordance with Exhibit A required with each shipment.

FOB: Destination

DWG NR: 10542907

PSC CD: 1320

NET AMT

0002 20 Each PPS 155mm Obturator Rings

FFP

Pre-Production Sample Purchased in accordance with Drawing 10542907.

First Article Testing and Lot Acceptance Testing required. Certificate of Conformance required with each delivery. Material certifications required with each shipment to PBA.

CDRL in accordance with Exhibit A required with each shipment.

FOB: Destination

0003 7,100 Each OPTION 100% Option - 155mm Obturator Rings

FFP

Option CLIN to be purchased within One Year of Award.

Purchased in accordance with Drawing 10542907.

First Article Testing and Lot Acceptance Testing required. Certificate of Conformance required with each delivery. Material certifications required with each shipment to PBA.

CDRL in accordance with Exhibit A required with each shipment.

FOB: Destination

Contract Data Requirements List

FFP

The contractor shall prepare and deliver data submissions in accordance with the requirements, quantities, and schedules set forth in the Contract Data Requirements List (DD Form 1423) - Exhibit A

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 N/A N/A N/A N/A

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 30-SEP-2025 7,100 PINE BLUFF ARSENAL

504TH STREET, BLDG 53 990 CENTRAL

RECEIVING P

PINE BLUFF AR 71602

FOB: Destination

W41G26

0002 30-JUL-2025 20 (SAME AS PREVIOUS LOCATION)

0003 1 yr. ADC 7,100 (SAME AS PREVIOUS LOCATION)

0004 N/A N/A N/A N/A

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-3 Taxpayer Identification OCT 1998 52.204-7 System for Award Management NOV 2024 52.204-8 Annual Representations and Certifications JAN 2025 52.204-13 System for Award Management Maintenance OCT 2018 52.207-1 Notice Of Standard Competition MAY 2006 52.209-3 First Article Approval--Contractor Testing SEP 1989 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-16 Variation In Quantity APR 1984 52.219-1 Alt I Small Business Program Representations (FEB 2024)

Alternate I

FEB 2024

52.222-3 Convict Labor JUN 2003 52.222-18 Certification Regarding Knowledge of Child Labor for Listed

End Products

FEB 2021

52.222-19 Child Labor -- Cooperation with Authorities and Remedies FEB 2024 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.222-25 Affirmative Action Compliance APR 1984 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.243-1 Changes--Fixed Price AUG 1987 52.246-15 Certificate of Conformance APR 1984 52.246-26 Reporting Nonconforming Items. AUG 2024 52.247-34 F.O.B. Destination JAN 1991 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.252-2 Clauses Incorporated By Reference FEB 1998

52.252-5 Authorized Deviations In Provisions NOV 2020 52.252-6 Authorized Deviations In Clauses NOV 2020 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7004 Display of Hotline Posters JAN 2023 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7007 Alternate A, Annual Representations and Certifications OCT 2024 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

MAY 2024

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors

JAN 2023

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors

JAN 2023

252.225-7000 Buy American--Balance Of Payments Program Certificate FEB 2024 252.225-7036 Buy American--Free Trade Agreements--Balance of

Payments Program--Basic

FEB 2024

252.247-7023 Transportation of Supplies by Sea OCT 2024

CLAUSES INCORPORATED BY FULL TEXT

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) - ALTERNATE I (JAN 1997).

[Contracting Officer shall insert details]

(a) The Contractor shall test 20 unit(s) of Lot/Item 0002 as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within TBD calendar days from the date of this contract to US Army, Pine Bluff Arsenal Central Receiving & Shipping Point (CRSP) Bldg 53-990, 506th Street Pine Bluff AR 71602 marked "FIRST ARTICLE TEST REPORT: Contract No. TBD, Lot/Item No. 0002 " Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(End of clause)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989)

The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within 60 DAYS. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.

52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)

(a) Definitions. As used in this clause --

Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.

Supplies means the end items furnished by the Contractor and related services required under this contract. The word does not include ``data.''

(b) Contractor's obligations.

(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for 3 YEARS --

(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and

(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform with the requirements of this contract.

(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor. However, the Contractor's liability for the transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in this contract and the Contractor's plant, and return.

(3) Any supplies or parts thereof, corrected or furnished in replacement under this clause, shall also be subject to the terms of this clause to the same extent as supplies initially delivered. The warranty, with respect to supplies or parts thereof, shall be equal in duration to that in paragraph (b)(1) of this clause and shall run from the date of delivery of the corrected or replaced supplies.

(4) All implied warranties of merchantability and "fitness for a particular purpose" are excluded from any obligation contained in this contract.

(c) Remedies available to the Government.

(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within 60 DAYS

(2) Within a reasonable time after the notice, the Contracting Officer may either--

(i) Require, by written notice, the prompt correction or replacement of any supplies or parts thereof (including preservation, packaging, packing, and marking) that do not conform with the requirements of this contract within the meaning of paragraph (b)(1) of this clause; or

(ii) Retain such supplies and reduce the contract price by an amount equitable under the circumstances.

(3) (i) If the contract provides for inspection of supplies by sampling procedures, conformance of suppliers or components subject to warranty action shall be determined by the applicable sampling procedures in the contract.

The Contracting Officer--

(A) May, for sampling purposes, group any supplies delivered under this contract;

(B) Shall require the size of the sample to be that required by sampling procedures specified in the contract for the quantity of supplies on which warranty action is proposed;

(C) May project warranty sampling results over supplies in the same shipment or other supplies contained in other shipments even though all of such supplies are not present at the point of reinspection; provided, that the supplies remaining are reasonably representative of the quantity on which warranty action is proposed; and

(D) Need not use the same lot size as on original inspection or reconstitute the original inspection lots.

(ii) Within a reasonable time after notice of any breach of the warranties specified in paragraph (b)(1) of this clause, the Contracting Officer may exercise one or more of the following options:

(A) Require an equitable adjustment in the contract price for any group of supplies.

(B) Screen the supplies grouped for warranty action under this clause at the Contractor's expense and return all nonconforming supplies to the Contractor for correction or replacement.

(C) Require the Contractor to screen the supplies at locations designated by the Government within the contiguous United States and to correct or replace all nonconforming supplies.

(D) Return the supplies grouped for warranty action under this clause to the Contractor (irrespective of the f.o.b.

point or the point of acceptance) for screening and correction or replacement.

(4) (i) The Contracting Officer may, by contract or otherwise, correct or replace the nonconforming supplies with similar supplies from another source and charge to the Contractor the cost occasioned to the Government thereby if the Contractor--

(A) Fails to make redelivery of the corrected or replaced supplies within the time established for their return; or

(B) Fails either to accept return of the nonconforming supplies or fails to make progress after their return to correct or replace them so as to endanger performance of the delivery schedule, and in either of these circumstances does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure.

(ii) Instead of correction or replacement by the Government, the Contracting Officer may require an equitable adjustment of the contract price. In addition, if the Contractor fails to furnish timely disposition instructions, the Contracting Officer may dispose of the nonconforming supplies for the Contractor's account in a reasonable manner.

The Government is entitled to reimbursement from the Contractor, or from the proceeds of such disposal, for the reasonable expenses of the care and disposition of the nonconforming supplies, as well as for excess costs incurred or to be incurred.

(5) The rights and remedies of the Government provided in this clause are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Combo Invoice/Receiving Report

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0303

Issue By DoDAAC W519TC

Admin DoDAAC** W519TC

Inspect By DoDAAC W41G26

Ship To Code W41G26

Ship From Code ____

Mark For Code W41G26

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTRACT SPECIALIST: MichelleAnn Hulett michelleann.g.hulett.civ@army.mil

CONTRACTING OFFICER: Bethany Carbajal bethany.n.carbajal.civ@army.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(a) 26 U.S.C. 6331(h) authorizes the Internal Revenue Service (IRS) to continuously levy up to 100 percent of contract payments, up to the amount of tax debt.

(b) When a levy is imposed on a payment under this contract and the Contractor believes that the levy may result in an inability to perform the contract, the Contractor shall promptly notify the Procuring Contracting Officer in writing, with a copy to the Administrative Contracting Officer, and shall provide--

(1) The total dollar amount of the levy;

(2) A statement that the Contractor believes that the levy may result in an inability to perform the contract, including rationale and adequate supporting documentation; and

(3) Advice as to whether the inability to perform may adversely affect national security, including rationale and adequate supporting documentation.

(c) DoD shall promptly review the Contractor's assessment, and the Procuring Contracting Officer shall provide a written notification to the Contractor including--

(1) A statement as to whether DoD agrees that the levy may result in an inability to perform the contract; and

(2)(i) If the levy may result in an inability to perform the contract and the lack of performance will adversely affect national security, the total amount of the monies collected that should be returned to the Contractor; or

(ii) If the levy may result in an inability to perform the contract but will not impact national security, a recommendation that the Contractor promptly notify the IRS to attempt to resolve the tax situation.

(d) Any DoD determination under this clause is not subject to appeal under the Contract Disputes Act.

File details come from the government source that posted it. Updated .