W519TC24Q2452 Amendment.pdf
PDF 378 KB Posted
- Attached to
- Portable 30 Ton AC Unit Federal contract opportunity
- Solicitation number
- W519TC24Q2452
About this file
This document is an amendment to a solicitation, W519TC24Q2452, for the procurement of a Portable Vertical Air Conditioning Unit. The key details are:
The amendment changes the purchase description from a 6-foot tall unit to a 10-foot tall unit. The required response date/time has been extended from 23-Sep-2024 10:00 AM to 16-Oct-2024 10:00 AM. The unit must have a minimum cooling capacity of 30 tons, be electrically powered using 480 VAC, 3 phase, 60 hertz, and the overall envelope dimensions cannot exceed 12' wide x 12' long x 10' tall. Heating options are acceptable but not required, and preference will be given to shorter lead time over lower cost. Detailed technical descriptions, drawings, and manuals must be submitted prior to award for government review and approval. The contractor must provide a 1-year warranty against defects. The solicitation is administered by the Army Contracting Command - Rock Island for the McAlester Army Ammunition Plant located in McAlester, OK.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC24Q2452.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W44W9M423900EI
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the purchase description from 6 f oot tall height requirement to a 10 foot tall height requirement.
1. CO NTRACT ID CODE P AGE OF P AGES
J 1 4
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 10-Oct-2024
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer )(Signature of person authorized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W519TC24Q2452
X 9B. DAT ED (SEE IT EM 11)
16-Sep-2024
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN
REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Oct-2024
CODE
ARM Y CONTRACTING COM MAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
W519TC 7. AD MINISTERED BY (If other t han item 6)
4. REQUISITION/PU RCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
W519TC24Q2452
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 23-Sep-2024 10:00 AM to 16-Oct-2024 10:00 AM.
The following have been modified:
PORTABLE VERTICAL AIR UNIT
Scope
The following document provides the requirements and specifications for Portable Vertical Air Conditioning Unit.
Requirements This section provides the design specification requirements for Portable Vertical Air Conditioning Unit.
1. General Requirements
a. Guards and plaques will be added where needed.
b. Ease of maintenance shall be a design consideration for all portions.
c. The design should utilize commercial-off-the-shelf items whenever possible to facilitate repair and replacement of worn and/or damaged parts.
d. All exposed materials shall be coated/painted or made of non-ferrous materials to prevent corrosion.
2. Specific Requirements
a. Unit shall be portable/skid mounted to facilitate relocation.
b. Units shall have a minimum cooling capacity of 30 tons.
c. Unit shall be electrically powered using 480 VAC, 3 phase, 60 hertz power.
d. Unit shall be a vertical style set-up.
e. Unit envelope dimensions shall not exceed 12’ wide x 12’ Long x 10’ Tall.
f. Units can have heating equipped with heating options are acceptable, but not required. When comparing potential proposals for units with options with heating and without, preference will be given to shorter lead delivery time in lieu of a lower cost. For example, a unit that has a heating option, a higher cost, but a shorter lead will be given preference over a unit that is cooling only, lower cost, but a longer lead time.
Proposal, Reviews, Drawings, Documentation, and Data
3. Prior to Award
DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: MCAAP personnel will validate and verify/approve the offeror’s proposal before award is granted.
To meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item. The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. The description shall also clearly portray/describe how each item will function. If qualifying on an “equivalent” basis, proposal should list in detail where the proposed item is equivalent to the model/item requested and any “non-equivalencies” must be explained. Enough information must be provided that the government technical reviewer can verify equivalency. An offeror’s opinion that their product is “equivalent” is not sufficient. If applicable, conceptual drawings that are not detail “as built” drawings should be provided as part of the detailed description. Drawing must provide overall height, width, and length dimensions. It should depict the locations of key components. If there is a picture of the equipment or portions of the equipment, such as from a brochure, then that picture(s) should be included with the data. It is advantageous for the contractor to supply as much data as possible as the government will use this to approve the proposed equipment, as related to this purchase description, for production and/or purchase. Generic statements from the offeror stating they can provide the requested item DO NOT constitute a valid proposal.
4. Finalized Drawings and Data
The contractor shall provide a complete sets of as-built reproducible drawings/data. The drawings/data shall include, at minimum, the requirements of paragraph above. The drawings/data shall be in electronic format. The format must be capable of being read as “.dwg” or “.dxf” for 2-D data and Solid Works (.sldprt, .sldasm) format or STEP (.stp) format for 3-D data. All drawings/data shall be authorized for reproduction and distribution to end users of the equipment.
5. Operational, Maintenance, and Parts Manuals The contractor shall furnish under this purchase description two (2) sets of operational, maintenance, and parts manuals as necessitated by the equipment.
The manuals shall be specific (not canned statements about the system in general) to the system supplied. There shall be a brief description concerning the purpose of the specific equipment supplied and the rated operating capacities.
The manuals shall contain a complete parts list to include (at minimum) all information necessary (manufacturer’s name, address, phone number, P/N, S/N, size, model number, type, etc.) to re-order the part if necessary. The manuals shall include all preventative maintenance procedures/schedules specific to the equipment supplied. These manuals shall be applicable to the equipment provided only and shall include all safety precautions/warnings associated with the operation. All manuals shall be authorized for reproduction and distribution to end users of the equipment. One (1) set of hard copy versions of the manuals shall be provided with the equipment. One (1) set of the manuals shall be electronic in form (on CD) and must be capable of being read in either a “.pdf” or a “.doc (.docx)” format.
Quality Assurance Provisions
6. Responsibility for Inspection Unless otherwise specified in the contract or purchase description the contractor is responsible for the performance of all inspection requirements specified herein.
Except as otherwise specified the contractor may use their own facilities or any commercial laboratory acceptable to the government. The government reserves the right to witness or separately perform any of the inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. The contractor shall notify the contracting officer at least 15 working days prior to shipment so a government representative(s) can make arrangements to be present to perform an acceptance inspection if necessary. Final acceptance of the contract shall be the responsibility of the government contracting officer.
Warranty Contractor shall provide a warranty against defective material, parts, and workmanship for a period no less than 1 year from final commissioning date.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .