Revised - WHAY230001 - PWS Replace Shop Doors.pdf

PDF 346 KB Posted

Attached to
Replace Shop Doors Federal contract opportunity
Solicitation number
W50S8D23R0012
Issued by
Department of the Army National Guard

About this file

This performance work statement outlines requirements for replacing shop doors at several buildings on an Air National Guard base. The contractor shall remove and dispose of existing doors and install new doors with transoms, saddles, and hardware to match existing at Building 207, Building 107, and Building 204. The work must be completed within 15 days of award. Quotes are due by July 17, 2023 and shall be emailed to the point of contact. The government will provide the work locations and utilities while the contractor must furnish all other property, materials, and equipment. The contractor's work will be inspected by a government representative and must meet the performance standards defined in the technical exhibit in order to be considered acceptable.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Shop Doors, newest first.
File Type Posted
Clarification for Replacement of Shop Doors.pdf PDF
Revised - Solicitation - Replace Shop Doors.pdf PDF
Solicitation - Replace Shop Doors.pdf PDF
WHAY230001 - PWS Replace Shop Doors.pdf PDF
Photos of doors.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENTOFTHEAIRFORCE

105th AIRLIFT WING (ANG)

ONE MAGUIRE WAY

NEWBURGH NY 12550-5075

PERFORMANCE WORK STATEMENT (PWS)

FOR

Repair by replacement shop doors

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform repair by replacement to shop doors in building 207 and building 403 as outlined in this Performance Work Statement.

1.2 Background: Several work orders have been submitted the 105 CES in regards to shop doors in need of repair by replacement.

1.3 Period of Performance (PoP): The Period of Performance will be 15 Days – scheduled at time of award.

Site Visit for this project is scheduled for 7 July 2023 @ 10:00 am. There will be only 1 site visit.

**No question will be entertained 5 days prior to due date of quotes.

Quotes are due July 17 2023 @ 10:00 – email to linda.pulaski@us.af.mil

1.4 General Information:

1.4.1 Recognized Holidays: The following are recognized US holidays. The contractor shall coordinate with the 105th Airlift Wing in advance if work will be planned on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day

1.4.3 Place and Performance of Services: Performance shall be at the 105th Airlift Wing, Stewart Air National Guard Base, Newburgh, NY. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.3.1 Unscheduled gate closures by the 105th Base Defense Squadron may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.3.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.

1.4.3 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation 105th Base Defense Squadron. The contractor shall ensure compliance with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. The base access procedures require the contractor, their employees, and subcontractors to submit a background check from the State of Residence of each individual who will need to be granted access to the base. If there are arrests and/or convictions, issuance of the badge is solely up to the discretion of the 105th Base Defense Squadron Command.

1.4.4 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating the contractor supplied equipment including its proper implementation with the government’s equipment for successful performance of this contract.

1.4.5 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non- Government entities/ Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

The contractor shall retrieve all identification media (including vehicle passes) from their employees who depart employment for any reason. All identification media (i.e., badges and vehicles passes) shall be returned to the KO within 14 days of an employee’s departure.

1.4.6. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

2.0 Definitions:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note:

The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary location for the contractor to perform services outlined in this PWS.

3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The Contractor Shall:

Remove and dispose of existing doors and saddles, Install new doors with transoms, saddles, and all new hardware. Doors will be painted to match existing.

Building 207 – 7 Doors (WO# 202001494) *Please see attached photos of bldg. 207 existing doors

• HVAC – single door replacement

• Warehouse – double door replacement

• WFMS – double door replacement

• Structures – double door replacement

Building 107 – 1 Double Door (Work Order # 202201927)

• Replace Room 131 exterior double door o 41-3/4 x 83-1/8 x 1-3/4 18G Steel Door o includes door closer, hinges, filler plates & brush door sweeps

Building 204 – (1 Door) (Work Order # 202300200)

• Replace 1 of the WH doors o 3 x 7 x 1-3/4 18G Steel Door LHR o includes 1-door closer, 2-hinges, 6-filler plates & 2brush door sweep

All doors shall be replaced by genuine replacement parts. Doors shall be installed in accordance with industry standards to include saddles and new hardware.

The contractor shall perform all work in accordance with all governing safety codes and regulations.

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS

Paragraph Task Performance

Standard Acceptable Quality Levels

Surveillance Method / By Whom

5.0 Contractor shall

replace identified shop doors in bldgs. 107, 204 &

Remove, dispose, and reinstall in accordance with local laws

Genuine replacement parts and system functioning properly

KO approved government inspector