Questions for Overhead door w answers.pdf

PDF 78 KB Posted

Attached to
Overhead Door Replacement Federal contract opportunity
Solicitation number
W50S8A22Q0027
Issued by
Department of the Army New Hampshire Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Overhead Door Replacement, newest first.
File Type Posted
AMENDED PWS Overhead Door.pdf PDF
Provisions and Clauses overhead door.pdf PDF
Amendment 1 overhead door.pdf PDF
Wage determination Portsmouth 2015-4013.pdf PDF
Provisions and Clauses overhead door.pdf PDF
Repair B253 Overhead Door PWS.pdf PDF
Overhead door RFQ COMBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Overhead Doors

W50S8A-22-Q-0027

Changes/ Amendments to confirm:

1. Amendment based on new findings: will the Roll up door will be replaced with new overhead, or new roll up door? ANSWER – due to site conditions, the existing 10’ x 10’ roll-up door will be replaced with a new roll-up door, not a sectional overhead door. The specifications for the new roll-up door can be found in Amendment 1.

2. Amendment Based on discussion: Nose dock door D, to have windows. Minimum 270 square inch of transparent window surface similar to that of the existing door? ANSWER– Nose Dock sectional overhead door should have windows similar in size (within 15%) and location to existing door.

3. Please Confirm: Door B at sprinkler system does not require windows, but no preference should it come with windows. ANSWER – the roll up door to be installed at the fire suppression control room does not require a window but can have a window (similar to existing roll-up door) if no additional cost to the government would be incurred.

4. Please confirm if taxes should be carried in proposals? ANSWER - Federal Government is tax exempt.

5. Please confirm if any state, local, and/or Federal permits will be required on this project? ANSWER –

Permits are not required to perform work on federal installations, but all applicable building codes must be followed. Contractor will present all equipment to be installed, methods of install, and planned schedule of work to the Base Civil Engineer (BCE) prior to ordering of materials, per the

PWS. The BCE, Base Fire Marshall, and Wing Safety Officer have similar authority as a code enforcement officer.

6. Please confirm if there are any known hazardous materials? ANSWER – There are no known hazardous materials in the workspace.

7. Please confirm the wind load in psf for the doors? ANSWER – The contract currently states 13.3 pounds per square-foot (psf) which is incorrect. The design wind load must be for 90 mph or plus/minus 24 psf for both the sectional overhead door and roll-up door.

8. Can the Government confirm that the Advantor connections are still operational and only requires re- mounting? ANSWER - The operability of the Advantor system is not within the scope of this project. Contractor shall remove and reinstall existing associated sensors/equipment as required to provide a fully functional door system to meet the intent of the PWS,

9. Can the Government confirm that an Advantor technician from Florida is not required to return for service? ANSWER -The operability of the Advantor system is not within the scope of this project.

7. Please confirm voltage and phase on motors. ANSWER-current operators are single phase 208V.

Contractor should confirm all dimensions and measurements, to include power supply, prior to ordering equipment.