W50S8A-21-Q-0002_RFI Tracker 06April2021.pdf

PDF 110 KB Posted

Attached to
Furniture, BLD 253 Federal contract opportunity
Solicitation number
W50S8A21Q0002
Issued by
Department of the Army New Hampshire Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Furniture, BLD 253, newest first.
File Type Posted
Bill of Materials V2 06April2021.xlsx XLSX spreadsheet
Provisions and Clauses furniture.pdf PDF
Furniture Locations.pdf PDF
Product Specifications.pdf PDF
SOW Furniture Bld 253.pdf PDF
Floor Plan Drawings.pdf PDF
Bill of Materials.xls.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Number RFI Text Date Received KO/KS Response Text Beta.SAM Posting Date

1 Is there a CAD file (.dwg) available for building 253? 19‐Mar‐21 For CAD files, please email KO & KS. Beta.SAM does not support the upload of .DWG files.

6‐Apr‐21

2 On the BOM Excel Sheet, the Total cell is calculating on the Unit Price "C" Column instead of Column "D" the Extended Price Column.

21‐Mar‐21 See Revised BOM excel date 06 April 2021. 6‐Apr‐21

3 Not sure about being able to give a fixed price on the WS‐1. Several of the WS‐1s have shared walls and/or extra panels.

21‐Mar‐21 Contract is for Firm Fixed Price. 6‐Apr‐21

4 Looking at Oak Point's CAD (E‐101), they are calling for "Under Carpet" Power/Data beneath the T‐2 Conference Table in Room 104. Would that imply that the T‐2 Conference Table requires a Power/Data Module?

22‐Mar‐21 Yes 6‐Apr‐21

5 When do you plan on ordering this furniture? 24‐Mar‐21 As soon as the contract is awarded & signed. The contract will be the Purchase order for the contractor to perform on the soliciation

6‐Apr‐21

6 When would you want the furniture installed? 24‐Mar‐21 within a couple weeks after delivery 6‐Apr‐21 7 Are there any restrictions on hours that the install can be performed? 24‐Mar‐21 Schedule normal work by Contractor and Subcontractor personnel between the hours of 7:00 AM and 4:00 PM, Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than above, submit a written request (e‐mail is acceptable) for each such occurrence to the Contracting Officer at least 3 working days in advance of the proposed event, so that the Government may make special inspection and/or security arrangements.

The Contracting Officer may decline approval. Contractor may have to work outside the normal work schedule in order to make utility connects; when this occurs, contractor shall adjust the work schedule or pay overtime. There will be no change associated with the change in schedule. (See Statement of Work Section IV‐i: Workdate)

6‐Apr‐21

8 What security requirements will be required for the installers / project manager?

24‐Mar‐21 See Statement of Work for Security Requirements (Section VI:

Security).

6‐Apr‐21

9 Will there be any other trades / personnel working in the space during the installation?

24‐Mar‐21 No 6‐Apr‐21

10 Does everything need to be on GSA contract? 24‐Mar‐21 No 6‐Apr‐21 11 Will panel frames of 3” (vs 3‐1/4” specified in the bid) be acceptable? 24‐Mar‐21 Yes 6‐Apr‐21

12 How many power and data jacks are needed in each workstation? 24‐Mar‐21 5 power power jacks and 1 data Jack per work station 6‐Apr‐21

W50A8A‐21‐Q‐0002 Building 253 Furniture Purchase

13 Can you describe the loading/unloading area and the path to each area?

Can we use both bay doors to bring in product? Are there any doors that we would need to go thru and what is the width of the door?

24‐Mar‐21 There are 2 separate entrances. The Sheet Metal side which is paved to a garage door entry into room 122. The Fuel cell side also has a paved entry with 35 inch door openings.

6‐Apr‐21

14 When is the last date for questions to be submitted to you (should we have others)?

24‐Mar‐21 All RFI's are due 31 March 2021. 6‐Apr‐21

15 WS‐4: Should be hot‐wired? It is single station and I do not think it is necessary to have electric power. Instead we can offer open panel at the wall side so the user can access at the wall for IT module and Electric Source.

30‐Mar‐21 WS‐4 will utilize wall power 6‐Apr‐21

16 WS‐4: Please advise me if there is any reason to have a high partition at the wall side. If not we suggest to have same high level for all partitions.

30‐Mar‐21 The wall side should not need a high partition 6‐Apr‐21