Pre-Proposal Conference Minutes - Redundant Control Power Bldg. 854.pdf
PDF 263 KB Posted
- Attached to
- Redundant Control Power Medium Voltage Switchgear Bldg. 854 Selfridge ANGB Federal contract opportunity
- Solicitation number
- W50S8522R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Attendance Sheet.pdf | ||
| VGLZ222010_RndntCntrPwr_B854_MV_Swgr_Dwgs.pdf | ||
| 127 SFS Vetted Form 2021.xlsx | XLSX spreadsheet | |
| 02_General Contract Spec.pdf | ||
| W50S8522R0017.pdf | ||
| SOW -VGLZ222010 -Redudant_Control_Power_for_MV_Swgr_4_8_22.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16 Sep 2022
MICHIGAN AIR NATIONAL GUARD
127th MISSION SUPPORT GROUP
SELFRIDGE ANG BASE MICHIGAN
MEMORANDUM FOR RECORD
FROM: 127 MSC
Contracting Division 43200 Maple St, Bldg. 105 Selfridge ANGB, MI 48045-5213
SUBJECT: Pre-Bid Conference for Solicitation:
W50S85-22-R-0017 “Redundant Control Power Switchgear Bldg. 854” Project # VGLZ 222010 – At Selfridge ANGB, MI
1. Site visit held on 16 September 2022, at Selfridge ANGB, MI and ‘on site’ commencing at:
10:00 AM ET in conjunction with interested contractors. For list of attendees see sign in sheet.
2. Daniel Taliaferro (127th Contracting) and Jeremy Starrett, (Contracting Officer) along with other 127th Engineering attendees. (See sign in sheet for attendees)
A. PROJECT DESCRIPTION:
127th Engineering introduced themselves, and introduced the Project Scope of Work.
SOW Summary:
The contractor shall provide all All materials, tools, and labor required for Redundant Control Power for double-ended Medium Voltage Switchgear in the Switch house Bldg. 854. See attached Statement of Work and Drawings for complete details. (See Solicitation and Statement of Work.)
Project#: # VGLZ222010 Project Location: Selfridge ANGB, MI (48045) Period of Performance (POP): 120 Calendar Days after NTP
1) Set-aside: 100% Small Business
2) Small Business Size Standard: $16.5M
3) NAICS Code: 238210 Electrical Contractors and Other Wiring Installation
4) Project Magnitude: Between $35,000 and $150,000
5) A bid bond is required for any proposals over $150,000. A Signed Copy will not be accepted.
Only Originals.
A Bid Bond is required, for Solicitation / Project.
Submit Proposals no later than: 23 September 2022 at 12:00 PM ET (As of Site Visit Date/Time) *This may change, please check SAM.gov – Contract Opportunities… regularly.
BOND REQUIREMENTS:
• Pre-Award, a Bid-Bond is required if Proposal Price is Greater than $150,000 (See Section 00010 and 52.228-1 BID GUARANTEE)
• Post-Award, awardee shall provide a Performance Bond if award price is greater than $150,000
• Post-Award, awardee shall provide a Payment Bond or Alternative Payment Protections, if award price is greater than $35,000
a. Emailed or Hand-Carried Proposals will be sent to daniel.taliaferro.2@us.af.mil
b. Facsimile transmission of bid is NOT authorized.
c. Electronic submission of bids will NOT be accepted. (Do NOT Email.)
d. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications.
e. A Site Visit was held immediately after this pre-proposal conference at the construction site.
f. When amendments are issued they will be posted to the SAM website.
g. Prospective offerors shall submit the proposal in two separate sections.
Section 1:
Part 1-Introductory Page/ (SF) 1442 Part 2-Price Proposal Section 2:
Part 1-Technical Solution Part 2-Past Performance
h. Liquidated damages DO APPLY to this project. See FAR Clause52.211-12
i. Warranty of Construction clause is incorporated and applies to this project. 52.246-21
j. The most current wage determination is incorporated into the solicitation and will be made part of the resultant contract but it is the contractor's responsibility to keep track of the most current wage rate. MI20220091 Building - Macomb County, MI - 48045
k. Safety measures are always important, and a part of Government contracts. Army Corp of Engineers manual and MIOSHA are incorporated in this contract.
l. RFI procedures were reviewed as follows:
i. Email technical questions in RFI format to Contracting Office for resolution.
(RFI form posted to Sam.gov)
ii. All RFI questions and answers posted to SAM, as soon as possible, and if applicable to all.
iii. RFI’s must be submitted NOT LATER THAN the fifth day prior to bid opening, however this does not guarantee an answer.
iv. RFI’s shall be submitted to the “General Inbox” and Daniel Taliaferro. Both emails within solicitation.
m. Please recall that only the Contracting Officer can approve changes such as price, schedule, specifications, and clauses with formal written notice typically in the form of a solicitation amendment or task order modification. Work undertaken regarding changes not formally approved by the Contracting Officer (save for COR approved no cost field changes) is at the Contractor’s risk.
n. This requirement is Un-funded and there are NO Options, ABI’s or Alternates.
v. Will Be a Firm Fixed Price Contract Awarded. The government intends to award the Lowest Responsive and Responsible Bidder.
o. SAM Registration. Awardee shall be registered in the System for Award Mgmt.
vi. Please Update SAM Reps and Certs.
vii. Offeror shall have NAICS Code, registered within SAM, for this project (Listed in Solicitation), in order to be determined Responsive.
3. The project description was stated in the Sam.gov announcement package W50S85-22-R-0017
4. All/ all project specific questions were referred to the RFI submittal process. It was advised that any changes would be issued with an addendum.
5. It is extremely important to submit all requirements within quote.
mailto:daniel.taliaferro.2@us.af.mil
6. The site visit concluded on Friday 16 Sep 2022 @ 11:00 AM ET.
DANIEL TALIAFERRO
Contract Specialist, 127th MSC
| MEMORANDUM FOR RECORD |
| A. PROJECT DESCRIPTION: |
| SOW Summary: |
| Submit Proposals no later than: 23 September 2022 at 12:00 PM ET (As of Site Visit Date/Time) |
| BOND REQUIREMENTS: |
| a. Emailed or Hand-Carried Proposals will be sent to daniel.taliaferro.2@us.af.mil |
| 4. All/ all project specific questions were referred to the RFI submittal process. It was advised that any changes would be issued with an addendum. |
| DANIEL TALIAFERRO |
| 2022-09-16T15:03:31-0400 | |
| TALIAFERRO.DANIEL.THOMAS.1098199981 |