QandAs_Construct MAFFS_Infrastructure.pdf
PDF 99 KB Posted
- Attached to
- Construct MAFFS Fixed Pits Infrastructure Federal contract opportunity
- Solicitation number
- W50S75-20-B-0002
- Issued by
- Department of the Army National Guard
About this file
This document contains questions and answers regarding Solicitation W50S75-20-B-0002 for Construct MAFFS Fixed Pits Infrastructure. Key details include specifications for switchboard and transfer switch installation, with recommendations for voltage, amperage, phase, and rotation sensors and indicators, as well as alarms. Safety standards per the EM-385 manual do not apply to this project. The related solicitation posting provides instructions for site visits and bid closing but seeks infrastructure construction for Department of the Army National Guard without further specifics on required products or services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Bids W50S75-20-B-0002 MAFFS.pdf | ||
| W50S75-20-B-0002 Amend 0002 MAFFS.pdf | ||
| Site Visit Roster MAFFS.pdf | ||
| Attach 2 - Revised Specs.pdf | ||
| CIANGS MAFFS Geotechnical Report.pdf | ||
| W50S75-20-B-0002 Amend 0001 MAFFS.pdf | ||
| Attach 1 - SOW.pdf | ||
| W50S75-20-B-0002 Solicitation MAFFS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct MAFFS Infrastructure, Solicitation W50S75-20-B-0002 Questions and Answers
Effective 22 September 2020
QUESTION ANSWER
1. In the revised drawings the 800A switch has been changed to a switch board with transfer switch. My questions is weather the transfer switch is supposed to have any sensors or controls such as
Voltage sensing and meters Amperage meters Phase sensing and indicators Rotation sensing and indicators Alarms These items are highly recommended for a portable generator connection, so many things can go very bad if the wrong voltage, or rotation are connected.
Refer to specifications outlined in section 26 23 00, specifically 3.3.2
2. Does the project run under the EM-385 Safety standards?
No. This safety standard manual applies to Headquarters, US Army Corp of Engineers (HQUSACE). Not applicable to this organization.