Questions and Answers Document.docx

DOCX document 15 KB Posted

Attached to
Secondary Spill Containment Pads Federal contract opportunity
Solicitation number
W50S6S23Q0006
Issued by
Department of the Army Arizona Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Secondary Spill Containment Pads, newest first.
File Type Posted
Amended RFQ W50S6S23Q0006 - Spill Containment Pads.docx DOCX document
RFQ W50S6S23Q0006 - Spill Containment Pads.pdf PDF
Attachment 1-SON - Spill Containment pads.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6S23Q0006 – Secondary Spill Containment Pads Q&A Q1. When quoting only in feet, should we round up?

A. Yes. When quoting only in feet…

1. The overall length of containment pad #1 shall be at a minimum of 68 feet long from the original 67 feet 4 inches.

2. The overall length of containment pad #2 shall be at a minimum of 40 feet long from the original 39 feet 8 inches.

Q2. In the past your base has indicated they want both pull-through and drop with ramps on both sides (for use with tugs). And, ramps on only one side for pulling in/backing out. Can you clarify?

A. The smaller pad will be located at our AGE shop up against the perimeter fence, so access to only one side will suffice.

Q3. Would you be interested in 12”up/12”down ramps at 2”HIGH?

A. Yes. If a 2" wall will comply with regulations, then it would be beneficial to have a smaller ramp to alleviate premature wear to our unit's suspension components.

File details come from the government source that posted it. Updated .