SEE ADDENDUM
(No Collect Calls)
W44W9M-17-T-0116 31-Jan-2017
b. TELEPHONE NUMBER
918-420-6177
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 24 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W44W9M9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KENT WESLEY HACKETT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING OFFICE
MCALESTER CONTRACTING OFFICE
1 C TREE ROAD
MCALESTER OK 74501-9002
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W44W9M 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
MCALESTER ARMY AMMUNITION PLANT
RECEIVING DEPT
1C TREE ROAD B8
MCALESTER OK 74501-9002
TEL: 918-420-6695 FAX:
918-420-6536FAX:
TEL: 918-420-6479 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
333415
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF25
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W44W9M-17-T-0116
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
AIR COMPRESSOR
FFP
Gardner Denver 200 HP Electra Saver Air Compressor, or equal, 832 CFM at 125 psig, 1800 RPM, direct drive 460/3/60 motor, variable displacement type, water cooled, rotary screw compressor with listed requirements. Factory trained technician for start-up, and training on operation/maintenance included.
FOB: Destination
NSN: ELECTRASAVER-II:2002
MILSTRIP: W44W9M703001NZ
PURCHASE REQUEST NUMBER: W44W9M703001NZ
NET AMT
0002 1 Each
CLOSED LOOP COOLING SYSTEM
FFP
Closed Loop Cooling System, Thermotech model PFC 0646-8FPI or equal, closed loop cooling system with listed requirements.
FOB: Destination
NSN: PFC-0646:15409
MILSTRIP: W44W9M703001NX
PURCHASE REQUEST NUMBER: W44W9M703001NX
0003 1 Each
DRYER
FFP
Gardner Denver Part #: DGH930EF3, or equal, non-heated desiccant dryer, 930 cfm at 100 psi, max dimensions: Height 109” x Width 59” x Depth 56”, 2414 lbs., 2” NPT in/out connections, 115 volt, single phase, 60 Hertz, pre filter and after filter with 3 valve bypass and energy saving control system “E”, with listed requirements.
FOB: Destination
NSN: DGH-SERIES:20024
MILSTRIP: W44W9M703001O0
PURCHASE REQUEST NUMBER: W44W9M703001O0
0004 1 Each
TANK
FFP
Receiver tank, Manchester Tank model 302443 or equal, receiver tank with listed requirements FOB: Destination
NSN: 302443:4FDC0
MILSTRIP: W44W9M703001NW
PURCHASE REQUEST NUMBER: W44W9M703001NW
PURCHASE DESCRIPTION
Qualifying Statement for Compressor System
LIST OF COMPRESSOR SYSTEM COMPONENTS (PURCHASED AS ONE UNIT):
1. One each, Gardner Denver 200 HP Electra Saver Air Compressor, or equal, 832 CFM at 125 psig, 1800 RPM, direct drive 460/3/60 motor, variable displacement type, water cooled, rotary screw compressor with listed requirements. Factory trained technician for start-up, and training on operation/maintenance included.
2. One each, Thermotech model PFC 0646-8FPI or equal, closed loop cooling system with listed requirements.
3. One each, Gardner Denver Part #: DGH930EF3, or equal, non-heated desiccant dryer, 930 cfm at 100 psi, max dimensions: Height 109” x Width 59” x Depth 56”, 2414 lbs., 2” NPT in/out connections, 115 volt, single phase, 60 Hertz, pre filter and after filter with 3 valve bypass and energy saving control system “E”, with listed requirements.
4. One each, Manchester Tank model 302443or equal, receiver tank with listed requirements.
1. One each, Gardner Denver 200 HP Electra Saver Air Compressor or equal, 832 CFM at 125 psig, 1800 RPM, direct drive 460/3/60 motor, variable displacement type, water cooled, rotary screw compressor with listed requirements. Factory trained technician for start-up, and training on operation/maintenance included.
LIST OF REQUIRED FEATURES:
NOTE: The offeror shall specifically indicate whether or not each of the following required features will be met. If any required feature cannot be met, the offeror will include explanatory remarks for customer review.
GENERAL:
Oil flooded rotary screw compressor that is water-cooled with a variable displacement airend and modulating inlet valve. At full load, the compressor capacity is 832 ACFM (m3/min) at a discharge pressure of 125 PSIG (bar).
Capacity is the actual CFM (m3/min) at inlet conditions, delivered at the final discharge of the compressor package.
AIREND:
The high efficiency single-stage, oil flooded rotary screw design is of the rotary helical screw type for minimal internal leakage and maximum compressor efficiency. Rotary helical precision ground rotors, manufactured on the latest CNC grinding machines, use on-line laser measurement technology to be dynamically balanced and mounted.
The rotors are manufactured from Steel EN 10083-C45A and EN-GJL-250 grey cast iron. The package is gear driven and mounted with a D flange for permanent alignment. The package incorporate a variable displacement technology such as the TurnValve® to reduce the package’s energy consumption when at less than full load capacity. Heavy-duty bearings, capable of typical calculated B-10 bearing life in excess of 150,000 hours, are used.
Rotor shafts are an integral part of the rotors and are not match marked. The minimum male rotor diameter is 296
mm. Bearing cooling and lubrication is achieved through differential pressure (airend coolant shall be circulated by air pressure differential, parasitic shaft driven pumps not acceptable). A pressure relief valve is installed in the final discharge line and set at the factory to approximately 120% of unit’s full load operating pressure for protection against overpressure. The compressor package includes a minimum pressure and check valve. This ensures a minimum pressure on the oil reservoir and prevents backflow of air when the unit stops, unloads or is shut down.
The large diameter rotors operate at slow speeds resulting in exceptional efficiency and reliability.
MOTOR:
The standard 200 HP motor is a 460 volt, 3 phase, 60 Hertz open drip proof (ODP) design that operates at 1800 RPM with a 1.15 Service Factor. The motor is an induction type with NEMA B design and class B or F insulation.
The motors used meet NEMA premium efficiency standards per MG1 Table 12-12. Optimized for best efficiency and power factor, the motor is specifically matched to the torque, speed, and horsepower characteristics of the compressor and is suitable for Wye-Delta type starting and continuous duty. The speed, torque and operating characteristics have been designed to match the load of the compressor. A Totally Enclosed Fan Cooled motor is available as an option.
STARTER:
A wye-delta starter is used to reduce the current inrush on starting. It is mounted in a NEMA 12 enclosure on the compressor package and wired with an emergency stop button. The door latch contains locking features. The control panel and components are UL Listed and CSA approved.
DRIVE ASSEMBLY:
The motor used is a NEMA D-flanged design that couples directly to the airend through lifetime non-lubricated, flexible coupling. Permanent alignment ensures maximum coupling and bearing life. The motor and airend are mounted with vibration isolators on a rigid steel base.
INLET AIR FILTER:
The Heavy duty, two-stage, dry-type inlet filter is capable of removing 99.9% of all airborne particulates. A 5 micron and larger filter is to be used. An auto dirt ejector is included with filter for easy service. The filter is in a horizontal orientation to prevent dislodged material from falling into the airend during normal operation and filter servicing.
COMPRESSOR CONTROL SYSTEM:
The exclusive AirSmart microprocessor-based controller is used on the compressor package. Equipped with a low voltage 24 VDC power source, the control system ensures proper starting, capacity control, operating control, and safety control of unit. The controller offers, as standard, the capability of operating as a modulating inlet valve or as a load/no load inlet valve with timed stop. The controller is housed in a NEMA 12 control enclosure. Transducers and thermistors are utilized in the control system because of their reliability and do not require routine maintenance.
Control Panel, Wiring, and Components are UL listed and CSA Certified.
A. Controller The microprocessor controller is designed specifically for use in rotary screw air compressors and is capable of controlling fixed speed air compressors which use traditional motor starters. The microprocessor-based unit monitors all necessary temperature and pressure points within the compressor in order to safely operate the machine and satisfy user air demand. The Control Panel displays a comprehensive overview of the compressor status and allows easy access to operational parameters such as pressure set points, alarm set points and language selection.
4 line by 20 character LCD display 4 status LEDs for “at-a-glance” compressor status Password protection of setup parameter menus Multiple language support UL Recognized component in the United States and Canada.
24 volt DC power input Optional communications module for sequencing and enhanced features.
The microprocessor controller that is used features an error management system that provides information on advisory warnings, shutdowns and displays general operating parameters. The controller constantly monitors system status and operation in order to determine the state of the compressor system.
B. Operation The controller allows the system to run in either constant run, low demand, sequence, or automatic start/timed stop modes to best match system demand. A backup system will not be required for the control system. Manual or automatic restart modes are employed following a power failure. The controller is capable of sequencing up to 8 units with interconnecting RS485 cable (sequencing kit), thus allowing for future system expansion. Contacts are available for remote controlled operation. No timing devices shall be used to prevent machine from unloading once the cut out point of the pressure switch has been reached.
C. Advisories The advisory notifications in the controller are designed to alert the user of needed service or that certain parameters may be approaching their shutdown level. Advisory notifications can be reset while the compressor is running or stopped by pressing the upper right button corresponding to the logo on the home screen. If the error condition still exists after resetting the advisory, the advisory notification will occur again. The status of the compressor at the time of each advisory is stored in non-volatile memory, which can be accessed through the history menu.
Complete System Advisory indicating: Change Separator, change air filter, change oil filter, change oil, low ambient temperature, and high discharge temperature
Start-up service is coordinated by factory trained technicians to ensure equipment is running properly and adjusted to factory specifications. Maintenance instructions will be discussed with the end user to ensure they understand routine maintenance procedures. The maintenance training shall be conducted at the time of equipment start-up.
ADDITIONAL REQUIRMENTS:
DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP Engineering Support Division will validate and verify/approve the contractor’s listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item.
The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. The description shall also clearly portray/describe how each item will function.
CONCEPTUAL DRAWING REQUIRED PRIOR TO AWARD: Conceptual drawings that are not detail “as built” drawings are required for submittal with the detailed description. Drawing must provide overall height, width, and length dimensions. Drawing must show dimensioned locations of inlets and outlets for piping. Drawing must clearly label and display all major components and anchor holes/locations.
OPERATION & MAINTENANCE MANUALS DUE DELIVERY: The Contractor shall submit two (2) O&M manuals at the same time that the components are delivered. The Government shall review and approve these O&M manuals.
SPARE PARTS LIST: The contractor shall submit a spare parts list at the same time that the components are delivered. It is requested, not required, that the list cover high wear, low life expectancy items, and provide information to help the customer forecast lead times and costs for procuring replacement parts for the listed components.
3D MODELS: If the contractor builds a 3D model or models as part of its design and production processes, the Government requests to take possession of the models when the components are delivered. Note: Offeror submittal of 3D models is not a contractual requirement.
2. One each, Thermotech model PFC 0646-8FPI , or equal, closed loop cooling system with listed requirements.
LIST OF REQUIRED FEATURES:
NOTE: The offeror shall specifically indicate whether or not each of the following required features will be met. If any required feature cannot be met, the offeror will include explanatory remarks for customer review.
FAN-COIL UNIT: Model PFC-0646-8FPI closed circuit cooler. Each unit shall have the capacity to cool 63 gpm of 40 % glycol from 125°F to 105°F with a 100°F dry bulb temperature without a trim cooler.
TRIM COOLER INCLUDED: Trim cooler designed to cool flow from 105°F down to 90°F using 70°F water.
Water requirements are ½ of the rated fluid flow (31.5 gpm). Water regulating valve and temperature gauge must be included with the trim cooler. All gauges with wells (2 each) and balance valves (2 each) are to be supplied for use on the heat load discharge lines. Audible alarm also included.
FAN MOTORS: Six, 1 ½ HP individually fused fan motors shall be furnished suitable for outdoor service on 460 volts, 60 Hz and 3 phase. Fan motor shall be heavy duty PSC or 3 phase motors with permanently lubricated ball bearings. Motors shall be thermally protected against burn-out, and may be started by single contactor. Protective slingers shall shield the motor from weather damage. Motors shall be factory wired with leads terminating in a weatherproof junction box located on the outside of the unit casing.
COIL: Shall be constructed of plate type die formed, aluminum fins mechanically bonded to copper tubes. Fins shall employ full height, self-spacing collars which completely cover tube surface. Coil shall be pressure & leak tested at 325 psig air under warm water, evacuated, dehydrated, and sealed with caps on connections.
MANIFOLD KIT: Provide single coolant inlet and outlet manifold kit for field installation.
FANS: Propeller fans, carefully matched to the coil, shall cover a large percentage of the coil face area providing uniform air distribution. The direct drive fans shall have heavy gauge aluminum blades securely riveted to zinc plated, chromate treated steel center hubs. All fans, statically & dynamically balanced before shipment, shall operate at low tip speeds for minimum vibration and low sound levels.
UNIT CABINET: Casings shall be constructed of heavy (16) gauge corrosion resistant galvanized steel thoroughly reinforced with riveted gussets. Fan outlets shall provide additional strength to fan panel and assure even air flow for quiet operation. All multiple fan unit casings shall be divided by full width baffles to separate individual fan sections and provide additional casing reinforcement. Mounting legs shall be constructed of heavy (10) gauge steel and shall be shipped with the unit for field installation.
FAN GUARDS: Shall be constructed of heavy (11) gauge, close meshed steel wire, polyvinyl chloride (PVC) coated for corrosion resistance.
CONTROLS: Fan cycling control package with multiple starting contactors and thermostats shall be provided on all multi-fan units in UL listed weather resistant control panel.
PUMP/CONTROL STATION: The Model 5D-2 duplex pump/control station shall be a completely assembled unit consisting of a base, circulating pumps, pump motors, piping, surge tank, instruments, and control panel.
PUMPS: The circulating pumps shall be centrifugal type with mechanical seals. Pumps shall be all iron construction, back pull-out design, with enclosed impeller. Pumps shall be sized for 63 gpm of 40 % Glycol at a total dynamic head of 125 feet. Goulds Model 3656, “S”- 1 ½ x 2-6
PUMP MOTORS: Shall be 5 HP, 3500 RPM, NEMA Standard, with TEFC enclosure suitable for 460 volts, 60 hertz, and 3 phase. Motors shall be thermally protected against burn-out, and shall be factory wired with leads terminating in a NEMA 4 junction box.
DUPLEX OPTION: Must include a second pump, pump on-off switches and run lights, lead failure light and lead-lag selector switch. The system shall be designed to automatically start the lag pump, should lead pump fail, by closing the flow switch contacts & energizing the timer. The timer runs out (10 sec), activating the relay, switching power to lag pump.
INSTRUMENTS: Supply three 3-1/2" bottom connected compound pressure gauges with needle valves to measure pump suction and discharge pressures. Supply two 3" back mounted temperature gauges with thermowells to measure coolant temperatures to and from the fan/coil unit. A paddle type flow switch shall be installed in the suction piping to detect fluid flow.
PIPING: 2" and smaller shall be sch. 40 ductile iron with threaded connections. Piping 3" and larger shall be sch.
40 carbon steel, welded with flanged connections. Piping shall be designed to facilitate pump removal. Single suction and discharge connections shall terminate at the edge of the skid. Control valves shall be installed in the pump suction and discharge lines to control flow and allow pump removal without draining the system. A discharge check valve shall be located in the pump discharge line to prevent reverse flow.
SURGE TANK: An ASME code constructed 25 gallon surge tank shall be provided with the pumping package.
The tank shall be fitted with an air purge line, ASME safety relief valve, isolation valve, and fluid level sight glass with check valves (in case of glass breakage, fluid will not leak). The tank shall fulfill multiple functions, such as fluid expansion, air purging, system drain and system pressure relief.
CONTROL PANEL: Shall be NEMA 4 enclosure with across-the-line, full voltage magnetic starter(s), fused 110v control transformer, time delay relay, hand-off-auto (H-O-A) selector switch, system reset button, power "on", and no flow "shutdown" lights shall be included. The H-O-A switch shall function as an on (hand)-off switch, and in the "auto" position, can be wired to start with a signal from the heat load.
BASE: Shall consist of a welded steel frame with supports for maximum rigidity and strength. Four 3/4" dia. anchor bolt holes shall be provided to facilitate installation.
will validate and verify/approve the contractor’s listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item.
The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. The description shall also clearly portray/describe how each item will function.
CONCEPTUAL DRAWING REQUIRED PRIOR TO AWARD: Conceptual drawings that are not detail “as built” drawings are required for submittal with the detailed description. Drawing must provide overall height, width, and length dimensions. Drawing must show dimensioned locations of inlets and outlets for piping. Drawing must clearly label and display all major components and anchor holes/locations.
OPERATION & MAINTENANCE MANUALS DUE DELIVERY: The Contractor shall submit two (2) O&M manuals at the same time that the components are delivered. The Government shall review and approve these O&M manuals.
SPARE PARTS LIST: The contractor shall submit a spare parts list at the same time that the components are delivered. It is requested, not required, that the list cover high wear, low life expectancy items, and provide information to help the customer forecast lead times and costs for procuring replacement parts for the listed components.
3D MODELS: If the contractor builds a 3D model or models as part of its design and production processes, the Government requests to take possession of the models when the components are delivered. Note: Offeror submittal of 3D models is not a contractual requirement.
3. One each, Gardner Denver Part #: DGH930EF3, or equal, non-heated desiccant dryer, 930 cfm at 100 psi, max dimensions: Height 109” x Width 59” x Depth 56”, 2414 lbs., 2” NPT in/out connections, 115 volt, single phase, 60 Hertz, pre filter and after filter with 3 valve bypass and energy saving control system “E”, with listed requirements.
LIST OF REQUIRED FEATURES:
NOTE: The offeror shall specifically indicate whether or not each of the following required features will be met. If any required feature cannot be met, the offeror will include explanatory remarks for customer review.
GENERAL
Vendor shall supply one packaged, fully assembled, piped, and wired pressure-swing (heatless) type regenerative desiccant dryer. Dryer shall be complete with: two pressure vessels (towers) each containing a desiccant bed fully charged with activated alumina; controller and control valves to direct inlet and purge air flows from tower to tower;
and a means of regulating purge air usage. All components shall be mounted within a boxed structural steel frame to shield valves, piping, pre-filtration, and after-filtration from accidental impact. Dryer shall be ready for start up after utility connections are made. Package shall be produced by an ISO 9001 registered manufacturer and, carry agency approvals for CSA, and CE.
Dryer design shall incorporate upward gas flow transmission during the compressed air stream dehydration cycle for maximum efficiency and desiccant bed protection and, operate automatically and continuously in producing the required ISO 8573.1 Quality Class levels for Solids, Moisture, and Oil as specified for the site conditions documented herein under the “System Specifications” sub-header. Purge air shall flow downward.
Industry Standard product design typically dictates an ISO Air Quality Class “2” Pressure Dew Point of -40F (-40C) at 100 PSIG (7 bar) with site conditions of 100F (37.8C) ambient and, 100F (37.8C) inlet air temperature at pressure. Integral package filtration shall be included to afford the Desiccant bed protection from particulate and oleophilic contamination and shall be provided prior to the compressed air ingress portal. At a minimum, ISO Class 2 Filtration shall take the forms of a Particulate (1 micron) Pre-filter and a Coalescing (.008 ppm) Filter. Plant piping shall be protected from desiccant particulate migration by a (1 micron) Desiccant After-filter to be located within the discharge conduit after the dry compressed air egress portal. An RS232 communications port shall be included to allow for remote monitoring capabilities in real-time directly from the manufacturer.
DESICCANT DRYER DESIGN
Dryer shall include two (2) drying towers (pressure vessels) containing the desiccant beds. Towers shall be designed so that compressed air velocity does not exceed 60 feet (18.3 meters) per minute @ 100 psig, (6.9 bar) through the desiccant bed to ensure bed stability and prevent premature desiccant deterioration. This velocity shall provide each tower with a minimum contact (residence) drying time of 4.8 seconds per measured unit of gas flow to ensure the specified dew point can be delivered and maintained with saturated inlet conditions.
Desiccant bed designs shall achieve maximum adsorption and release rates by incorporating 3mm ball size activated alumina. It shall include tower desiccant surpluses of 30% to neutralize and account for the normal losses to bed efficiency attributed to desiccant aging prior to reaching operational stability. Achieving this shall require that each tower contain a minimum of 0.6 pound (0.27 kg) of activated alumina desiccant for each scfm of rated flow while operating at industry standard conditions. Specified design conditions shall ensure desiccant bed regeneration efficiencies of no less than 98% by reclaiming the heat of adsorption. Resultant specified dew point stabilities will then be achieved under full rated flow conditions. The average purge rate shall not exceed 13.7% at rated flow conditions.
Purge air shall be regulated by an adjustable valve and pressure-reducing orifice. Purge rate shall be indicated by a purge flow indicator. Purge air shall be exhausted through oversized mufflers to minimize backpressure and reduce the noise level as it expands back to atmosphere. Each tower shall have its own muffler. An extra set of muffler inserts shall be included for replacement when excessive backpressure through the muffler (such as might occur on initial start-up after dryer transport) is experienced. Mufflers shall be equipped with a pressure relief device to prevent excessive backpressure.
After the purge process is completed and prior to tower switchover, the tower being purged shall slowly be repressurized to line pressure to prevent bed movement and desiccant abrasion. Minimum acceptable repressurization cycle times per ISO 8573.1.
DESICCANT TOWER CONSTRUCTION
Each tower shall be furnished with separate drain and fill ports so that the desiccant can be replaced without disconnecting the piping. Cleanable stainless steel air diffusers shall be removable and internally affixed on larger flow rates. This shall apply to both the upper and lower ports on each tower. Diffusers shall prevent desiccant channeling, reduce dusting and bed attrition caused by bed fluidization, and ensure maximum drying capacity can be extracted from the desiccant. A pressure relief valve and pressure gauge shall be provided for each tower. Pressure relief valves shall be mounted after the flow diffusers to prevent desiccant migration or operational interference with safety function. Pressures vessel diameters in excess of six-inches shall require ASME certification to assure code compliance. Said vessels shall be built and stamped in accordance with the ASME Boiler and Pressure Vessel Code, Section VIII, Division 1.
PIPING
All piping circuits, shall be threaded, grooved or flanged and properly sealed to prevent leakage.
CONTROLLER
A 100% repeatable solid state controller shall be furnished to sequence operation of inlet and purge/repressurization valves so that one tower is drying the inlet compressed air stream while the other tower is depressurized, regenerated, and repressurized. Controller shall be panel mounted in a NEMA 4, 4X rated control box affixed to the front of the package. Said controller shall come complete with user replaceable internal fuse protection. Controller design shall accept a customer supplied open/closed electrical contact signal to initiate a Controlled Dryer Shut- Down sequence to maximize efficiencies by synchronizing dryer to an air compressor’s “unloaded” or, “off” operational status. Controller cycle time shall be field adjustable via an externally mounted panel dial to afford the flexibility of selection from four outlet pressure dew point (pdp) quality class levels per ISO 8573.1 as follows:
Quality Class
ISO 8573.1
Pressure Dew Point Degrees F/C
Cycle Time Minutes
1 -100/-73 4 2 -40/-40 10 3 -4/-20 16 4 +38/+3 24
Economies of operation shall be further achieved with an external panel mount dial to manually vary the regeneration time cycle and ensure accurate settings. Said dial shall allow the user to save up to seventy percent (70%) of purge air energy by reducing purge air consumption in relation to actual load levels. Savings shall be expressed as an inverse percentage of maximum design flow capacity. Controller shall provide a method to allow manual sequencing through the modes of operation to verify proper operation of control valves.
INSTRUMENTATION
Standard Controller shall include the following:
NEMA 4X (IP66) control panel construction Soft on/off switch with two power recovery modes Tower status LED’s (green=drying, yellow-regenerating) Process valve status LED’s (on=valve open, off=valve closed) Operating mode LED’s (ISO Class fixed cycle) Load Factored Purge Savings LED’s (user selectable from 0 to 70%) Alarm LED (red) Voltage-free alarm contacts, 5A rating Alarm reset button/Manual cycle advance Service Reminder LED’s (Filters & Drains (3), Inlet, Purge & Tower Switching (6), and Desiccant Towers
(4) RS232 Communications Capabilities Moisture Indicator (indicates elevated outlet dew point) Tower pressure gauges (indicate pressure in tower) Purge rate indicator (indicates pressure of purge air upstream of pressure reducing orifice) Switching failure alarm (monitors system and indicates if tower fails to pressurize or depressurize after switchover)
ENERGY SAVING CONTROLLER
Shall include an automatic Energy Saving Purge Control System. Said system shall utilize feedback from temperature thermistors to calculate the actual load on the desiccant bed to determine the precise purge time required for efficient tower regeneration. Once regenerated, said off-line tower shall become a repressurized sentinel in preparation for its future drying cycle. Purge air losses shall then be eliminated until the on-line drying tower has achieved optimal desiccant bed saturation levels. Only then, shall the tower switchover sequence be initiated and the process begins anew. Systems that use flow meters or hygrometers instead are not deemed acceptable.
Optional Energy Savings Controller shall carry the following added benefits:
Automatic, load-matched, purge air Energy Savings Vacuum Fluorescent Text Display (complete text communications) Demand Sensitive Thermistors (two per tower to establish purge requirements) High Humidity or Dew Point Alarm Filter Monitor Alarm (1 or 2 filters with optional Filter Monitor) Electric Drain Alarms (1 or 2 filters with optional Demand Drains) Electric Drain Test (1 or 2 filters with optional Demand Drains)
VALVES
System shall be rated for 150 psig (10.5 kgf/cm2) maximum working pressure (250 psig/17.6 kgf/cm2 optional) and supplied with air operated, butterfly type valves. Said butterfly type valves shall use dual piston, rack and pinion type actuators that are isolated from the compressed air stream, for the purge function and, dual check valves and purge check valves for the tower inlet air function. Butterfly type air control valves shall possess a manual override mechanism and a visible indicator to show valve position. Non-lubricated solenoid operated valves with hermetically sealed coils shall be used to engage the compressed air power necessary for pneumatic control valve actuation. Said valve engagement air shall be dried and filtered to one micron prior to being deployed to both open and close these control valves.
Valves shall not require field lubrication and, shall be constructed with resilient elastomeric seats to minimize wear and assure seal-tight closures. Purge/repressurization valves shall include a spring assist to hold valves closed prior to start-up and upon loss of air pressure. Valves shall be rebuildable in the field.
STANDARDS CONFORMITY
Dryers shall be certified by the Certification and Testing Division of the Canadian Standards Association to comply with the standards as documented by UL No. 1995 and CAN/CSA-22.2 No. 236-M90.
SYSTEM SPECIFICATIONS
Rated Capacity in SCFM 930 System Design Working Pressure in 100 PSIG Maximum Working Pressure in PSIG (bar) 150 Maximum Inlet Air Temperature in °F (°C) 120 (saturated) Maximum Ambient Air Temperature in °F (°C) 120 Electrical Requirements: 115 Voltage, 1 Phase, 60 Hertz NEMA (IP) Rating: 4 (Specify: Standard - NEMA 4, 4X, Optional NEMA 7) Dew Point Quality Class:
(1= -100°F/-73°C; 2= -40°F/-40°C; 3= -4°F/-20°C; 4= +38°F/+3°C) Integral Pre-Filtration Quality Class: 1
Specified Heatless Desiccant Air Dryer shall be Gardner Denver Model #DGH1130EF3 or approved equal.
will validate and verify/approve the contractor’s listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of each item.
The offeror’s description submittal shall account for each one of the required product features located in this qualifying statement. The description shall also clearly portray/describe how each item will function.
CONCEPTUAL DRAWING REQUIRED PRIOR TO AWARD: Conceptual drawings that are not detail “as built” drawings are required for submittal with the detailed description. Drawing must provide overall height, width, and length dimensions. Drawing must show dimensioned locations of inlets and outlets for piping. Drawing must clearly label and display all major components and anchor holes/locations.
OPERATION & MAINTENANCE MANUALS DUE DELIVERY: The Contractor shall submit two (2) O&M manuals at the same time that the components are delivered. The Government shall review and approve these O&M manuals.
SPARE PARTS LIST: The contractor shall submit a spare parts list at the same time that the components are delivered. It is requested, not required, that the list cover high wear, low life expectancy items, and provide information to help the customer forecast lead times and costs for procuring replacement parts for the listed components.
3D MODELS: If the contractor builds a 3D model or models as part of its design and production processes, the Government requests to take possession of the models when the components are delivered. Note: Offeror submittal of 3D models is not a contractual requirement.
4. One each, Manchester Tank model 302443, or equal, receiver tank with listed requirements.
LIST OF REQUIRED FEATURES:
NOTE: The offeror shall specifically indicate whether or not each of the following required features will be met. If any required feature cannot be met, the offeror will include explanatory remarks for customer review.
RECIEVER: 1060 gallon vertical tank, 48” diameter X 144” height with base ring, 2035 lbs., 165 PSI max at 450° F CONNECTIONS: Two each 1” NPT 1500# Flat Flanges located on top and bottom of tank, two each 1” NPT 1500# radial flanges located on opposing sides of the tank, one each ¼” NPT 1500# flat flange located on the side of the tank, one each 3” NPT 1500# radial flange located on the side of the tank, two each 6” 150# ANSI RF. SO.
flange mounted on 6” schedule 80 pipe (7-1/2” long) with .134 x 8-5/8” O.D. x 6-5/8” I.D. backing ring (one 120” above tank bottom above manway, and one 24” from bottom of tank offset 90°), One each 12” x 16” x ¾” x 4” 300# manway
Additional Features: Two each standard lifting lugs, one each standard 8” skirt and clip assembly for 48” diameter tank, one each ASME data plate
Options and Accessories to be Included: One each relief valve 2” set at 165 psi certified/dated/sealed (P/N:
6010HHMG01KM0165) or equal, one each gauge 4” diameter ¼ base mount liquid filled 0-200 psi (P/N: LFSL40-
200) or equal, and one each easy drain extra ½” NPT 115/1 (P/N: EZDB-2) or equal
Specifications: Designed and constructed in accordance with ASME Section VIII Div. 1 Code for compressed air storage use. “U” stamped and registered with the National Board of Pressure Vessel Inspectors. Exterior surface shall be primed and then finish coated with industrial grade paint.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 01-MAY-2017 1 MCALESTER ARMY AMMUNITION
PLANT
RECEIVING DEPT
1C TREE ROAD B8
MCALESTER OK 74501-9002
918-420-6695 FOB: Destination
W44W9M
0002 01-MAY-2017 1 (SAME AS PREVIOUS LOCATION)
0003 01-MAY-2017 1 (SAME AS PREVIOUS LOCATION)
0004 01-MAY-2017 1 (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.212-1 Instructions to Offerors--Commercial Items OCT 2016 52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (DEC 2016) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
CLAUSES INCORPORATED BY FULL TEXT
52.0001-4001 AUTHORIZED SIGNATURE (FEB 2004)
The signature on this solicitation, offer or contract should be the signature of:
(a) A Corporate Officer (President, Vice-President, Treasurer, Secretary); or,
(b) An individual authorized in writing by a Corporate Officer to bind the company to a legal document.
(End of Provision)
52.0011-4000 RECEIVING OFFICE REQUIREMENT – MCAAP (MAY 2009)
At the McAlester Army Ammunition Plant truck shipments are accepted at Warehouse 8, Receiving Office, Monday though Thursday (except holidays) from 6:30 A.M. until 3:00 P.M. only. All shipments and deliveries must be at the main gate (truck gate) on or before 3:00 P.M. No shipments will be accepted after 3:00 P.M. unless prior arrangements have been made.
Any deliveries for Thursday afternoons during the months of May and June SHALL BE scheduled in advance by calling 918-420-6695 to verify that deliveries are being accepted that day.
To gain entry to the installation for shipment/delivery, delivery drivers shall have a valid driver's license, residency status documentation (green card) if foreign national, and NO outstanding criminal history. Any other occupants of the delivery vehicle must also meet these requirements.
No shipments will be accepted on government holidays.
Also reference 52.0045-4002 and 52.0045-4003 Security Requirements if needed.
(End of Notice)
52.0013-4001 REQUIREMENT TO SUBMIT OFFER/QUOTE ON ALL ITEMS (MAR 2004)
You must submit and offer/quote on ALL items to be considered for award.
(End of Clause)
52.0015-4002 DISCLOSURE OF UNIT PRICES (MAY 2004)
Unless the offeror notifies the contracting officer, at time of submission of its initial offer, of an objection to disclosure of its unit price, the Government reserves the right to publicly release (which would include, but is not limited to, a public award synopsis, contractor debrief, procurement history posting, or Freedom of Information Act (FOIA) request) the unit price(s) stated in the contract award under this solicitation. Any objection must be submitted in writing, providing a detailed explanation of how release of the awarded unit price would result in a substantial competitive harm to the contractor. Objections will be reviewed to determine whether harm has been substantiated. Failure to notify the contracting officer by the close of this solicitation waives any objection to disclosure of the unit price. A “unit price” is defined as the specified amount to be paid by the Government for the goods or services stated per unit, contract line item, or separately identified contract deliverable. The term “unit price” does not include any information on how the unit price was determined. This constitutes notification pursuant to Executive Order 12600. (End of Provision)
52.0032-4002 PACKING LIST (FEB 2004)
To expedite your payment, all shipments under this order shall be accompanied with packing lists or delivery tickets which shall contain the following information:
A. Name of supplier B. Purchase order number, CLIN, and purchase request number C. Date of order D. Itemized list of supplies to include noun name, part number, quantity and unit of issue
52.0033-4000 AMC-LEVEL PROTEST PROGRAM (DEC 2000)
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:
HQ Army Material Command Office of Command Counsel
ATTN: AMCCC-PL
5001 Eisenhower Avenue Alexandria, VA 22333-0001 Facsimile Number (703 617-4999/5680 Voice Number (703) 617-8176
The AMC-level protest procedures are found at: http://www.amc.army.mil/amc/cc/protest.html
If Internet access is not available contact the Contracting Officer or HQ, AMC to obtain the AMC-Level Protest Procedures. (End of notice)
52.0047-4001 HOURS OF OPERATION – MCAAP (FEB 2004)
Normal work hours are Monday through Thursday 6:30 A.M. until 5 P.M. Contractors will not be permitted to work on Fridays, Saturdays, Sundays, or legal holidays for any reason, unless otherwise approved by the Contracting Officer. The following legal holidays will be observed:
January 1st 3rd Monday of January 3rd Monday of February Last Monday of May July 4th 1st Monday of September 2nd Monday of October November 11th 4th Thursday of November December 25th
When one of the designated holidays falls on a Friday or Saturday, holiday will be observed on Thursday. If the holiday falls on a Sunday, holiday will be observed on the following Monday.
52.211-6 BRAND NAME OR EQUAL (AUG 1999)
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government's needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must--
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by--
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.
(End of provision)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Low price, responsible offer
Technical and past performance, when combined, are N/A.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2017)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .