VIR_W05385.pdf
PDF 522 KB Posted
- Attached to
- Check Valves Federal contract opportunity
- Solicitation number
- N6660426Q0129
About this file
TAHEF-FORM-NO. 007 Rev C: Vendor Information Request Form
This document is a Vendor Information Request (VIR) form template used by the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) Towed Array Handling Equipment (TAHE) Facility to resolve technical questions or problems involving towed array handling equipment work orders. The form serves as a standardized mechanism for vendors to report nonconformances, propose material substitutions, request disposition guidance, and for TAHEF to evaluate and approve or disapprove vendor submissions. Vendors complete sections 2 through 18, providing supplier information, material nomenclature, work order details, part numbers, quantities, serial numbers, detailed descriptions of problems or proposed changes, cause of nonconformance, recommended corrective actions, technical justifications, delivery impact assessments, cost implications, and contact information. The form requires vendors to accept full responsibility for the correctness of information submitted and permits either typed/wet or digital signatures.
TAHEF facility personnel complete sections 19 through 25, which include logistics acceptability review (addressing outside services, scheduling impacts, replacement parts, procurement requirements, and quality assurance), technical acceptability evaluation by engineering with options for repair, rework, or failure verification requirements, final disposition approval with four options (approve, conditionally approve, disapprove, or information only), and TAHEF manager authorization. The form includes specific instructions regarding signature sequence and document locking mechanisms, with provisions for creating separate vendor and TAHEF archival copies, and requirements for government or contractor purchasing to sign before transmitting the completed VIR to the contracting officer or vendor depending on procurement method.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Material Specification SAE AMS2700F_2018-03-01.pdf | ||
| Standard Specification ASTM A967-A967M-25_2025-05-19.pdf | ||
| Solicitation CDRLs_Redacted.pdf | ||
| Attachment RIR_QAP_W05385.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAHEF-FORM-NO. 007 Rev C
NUWCDIVNPT TAHE FACILITY
NUWC, BLDG 6 NEWPORT, RI 02841
Revision Date: 04/29/2025
(REFER TO INSTRUCTIONS ON PAGES 3 AND 4)
VENDOR INFORMATION REQUEST 1. VIR NO.:
2. SUPPLIER NAME AND ADDRESS 3. DATE
4. DATE DISPOSITION REQUIRED
5. MATERIAL NOMENCATURE 6. W0 7. PART NUMBER 8. QUANTITY 9. SERIAL NUMBER
10. STATUS OF PART
Not Started In Process Completed
11. DESCRIPTION:
12. CAUSE OF NONCONFORMANCE:
13. RECOMMENDED CORRECTIVE ACTION:
14. RECOMMENED DISPOSITION:
15. TECHNICAL JUSTIFICATION AND PURCHASER’S BENEFIT:
16. DELIVERY IMPACT
YES NO
17. COST IMPACT
YES NO
IF DISAPPROVED,
DELIVERY WILL BE:
IF YES, REPAIR COST
IF APPROVED, DELIVERY
WILL BE:
IF YES, REPLACMENT COST
THE VENDOR ACCEPTS FULL
RESPONSIBILITY FOR THE
CORRECTNESS OF
INFORMATION AFFECTING
THE ABOVE PARTS
18. REPORTED BY:
SIGNATURE:
PHONE:
VENDOR: PLEASE DO NOT WRITE ON PAGE 2
SEE PAGE 2 FOR TAHEF RESPONSE
Typed/Wet Sign Digital Signature
NUWC, BLDG 6 NEWPORT, RI 02841
19. VIR POC DATE VIR RECEIVED
PRIORITY ROUTINE
URGENT
SOW# WO#
20. LOGISTICAL ACCEPTABILITY
OUTSIDE SERVICES
REQUIRED
OTHER WORK ORDERS AFFECTED
YES NO
CHANGE IN SCOPE
YES NO
SIGNED
PLANNING or INVENTORY
REQUIRED
TAHEF SCHEDULE IMPACT
YES NO
REPLACMENT PARTS
YES NO
SIGNED
LIBRARY
REQUIRED
LATEST DWG/STD
YES NO
OTHER DOCUMENTATION NEEDED
YES NO
SIGNED
PURCHASING
REQUIRED
ALTERNATE PROCURMENT
YES NO
COST JUSTIFIED
YES NO
SIGNED
QUALITY ASSURANCE
REQUIRED
QUALITY ISSUES
YES NO
NEW/REVISED RIR REQUIRMENTS
YES NO
SIGNED
LOGISTICS NOTES:
21. TECHNICAL ACCEPTABILITY
ENGINEERING DISPOSITION:
RPR REQUIRED Y N
RFV REQUIRED Y N
MAJOR
MINOR
ISEA/TDA REQUIRED Y N
ENGINEERING SIGNED: PRODUCTION MANAGER SIGNED: PROGRAM MANAGER SIGNED:
APPROVALS
22. FINAL DISPOSITION:
APPROVE
CONDITIONALLY APPROVE
DISAPPROVE
N/A or INFORMATION ONLY
TAHEF MANAGER SIGNED: 23. ISEA or TDA (as required) SIGNED:
24. RESPONSE TO VENDOR:
NOTICE TO SUPPLIER: THE RESPONSE OUTLINED ABOVE IS
APPLICABLE TO THE MATERIAL ON THIS VIR ONLY. SHIPPING
DOCUMENTS FOR THIS MATERIAL MUST REFERENCE THIS VIR.
25. RESPONSE SENT TO SUPPLIER BY
PURCHASING:
VERSION: VENDOR COPY TAHEF COPY
Revision Date: 04/29/2025
NUWC, BLDG 6 NEWPORT, RI 02841
VENDOR INFORMATION REQUEST FORM INSTRUCTIONS
A PROPERLY APPROVED VENDOR INFORMATION REQUEST (VIR) IS REQUIRED TO RESOLVE TECHNICAL QUESTIONS OR
PROBLEMS INVOLVING TOWED ARRAY HANDLING EQUIPMENT FACILITY WORK ORDERS.
TO FACILITATE THE PREPARATION OF THE FORM, A BRIEF DESCRIPTION APPEARS BELOW INDICATING THE
INFORMATION REQUIRED TO BE ENTERED IN THE APPROPRIATE BLOCK. IF MULTIPLE PAGES ARE REQUIRED, LINK
ADDITIONAL PAGES BY BLOCK NUMBER TO THE FIRST PAGE.
BLOCK NO. ENTRY (BLOCKS 2-18 TO BE FILLED IN BY VENDOR)
(BLOCKS 1, 19-25 TO BE FILLED IN BY TAHE FACILITY)
To be completed by vendor:
1. VIR number will be provided after VIR disposition. Refer to this number (provided by the Towed Array Handling Equipment Facility) on any inquiry. Record this number on the packing list prior to shipping.
2. Enter your full company name and mailing address.
3. Enter the date the entries are being made.
4. Provide the date a response is needed in order to avoid delay of delivery.
5. Enter the nomenclature of the part that appears on the purchase order.
6. If not populated, enter the TAHEF work order number that pertains to the purchase/service.
7. Indicate the part number(s) affected.
8. Quantity of pieces affected by VIR (not quantity ordered).
9. Serial number of piece affected, where applicable.
10. Check appropriate part status block.
11. Describe the specific problem/question/proposed change, or nonconformance in detail:
• indicate what, if anything, is nonconforming
• when proposing a material substitution, include a full description of the substitute material (i.e.: alloy, class, condition or temper, specification, etc.).
Attach a copy of the test report for the material if available and with the shipment of the completed hardware.
• when reporting a nonconformance involving the heat treatment of material, a copy of the applicable heat treatment procedure used should be attached.
• when reporting chemical and mechanical nonconformance, attach a copy of the test report applicable listing both chemical and mechanical test results of the material.
• use a continuation or sketch sheet if this space is inadequate to show a sketch or to fully describe the problem
12. Indicate what the cause of the nonconformance is.
13. Indicate the recommended corrective action.
14. Indicate the recommended disposition.
15. Include the technical justification for accepting permanent nonconformance by indicating the effect of the deviation on the form, fit or function of the material, part or component. State clearly if unable to provide technical justification. Provide rationale for perceived benefit to purchaser.
16. Indicate if delivery is impacted. If so indicate new delivery date based on approval or disapproval.
17. Indicate if the cost to the TAHEF is impacted and if so, by how much. For outside services include repair vs replacement cost.
18. Provide name of person to contact in case of any questions regarding VIR. WARNING: If using a digital signature information entered on the first page will be locked.
19. VIR can be sent to the VIR POC via the email provided or the TAHEF representative who solicits the quote.
NUWC, BLDG 6 NEWPORT, RI 02841
To be completed by TAHEF:
20. If required by the VIR POC, mark each block as applicable. Utilize the Logistics Notes to enter information that is more specific.
Any changes made to Section 19 should be noted in the Logistics Notes. Signature required if department input is required.
21. Engineering to create a disposition and recommendation. Mark each block as applicable. Engineering, Production Manager, and Program Manager signatures required. WARNING: Engineering signature locks Section 20, Program Manager signature locks Section 19 and VIR Number
22. Mark final disposition as applicable. TAHEF manager signature required. WARNING: TAHEF Manager signature locks every field prior to it.
23. ISEA/TDA signature as required by block 21.
24. TAHEF Manager: type a formal answer to the vendor in Section 24 reflecting final disposition and path forward.
Purchasing: Two copies should be saved, a vendor copy and TAHEF copy. The vendor copy should only have the response to vendor and signatures on the second page and all other internal information should be redacted. The TAHEF copy should include all internal information as written for archiving purposes.
VIR POC: Save the TAHEF copy in the appropriate archive.
25. WARNING: Selecting "Vendor Copy" will erase all "Need to Know" information from the form.
WARNING: Signature in Section 25 locks the entire document.
Government Purchasing: Sign and date completed VIR just before sending to the Contracting Officer (if the purchase was done via Government Contract)
Government or Contractor Purchasing: Sign and date completed VIR just before sending it to the vendor (if the purchase was done via bankcard or ODCs).
| 1 VIR NO: |
| 2 SUPPLIER NAME AND ADDRESS: |
| 3 DATE: |
| 4 DATE DISPOSITION REQUIRED: |
| 5 MATERIAL NOMENCATURE: |
| 6 W0: W05385 |
| 7 PART NUMBER: |
| 8 QUANTITY: |
| 9 SERIAL NUMBER: |
| 11 DESCRIPTION: |
| 12 CAUSE OF NONCONFORMANCE: |
| 13 RECOMMENDED CORRECTIVE ACTION: |
| 14 RECOMMENED DISPOSITION: |
| 15 TECHNICAL JUSTIFICATION AND PURCHASERS BENEFIT: |
| IF DISAPPROVED DELIVERY WILL BE: |
| IF YES REPAIR COST: |
| IF APPROVED DELIVERY WILL BE: |
| IF YES REPLACMENT COST: |
| 19 VIR POC: |
| DATE VIR RECEIVED: |
| SOW: |
| WO: W05385 |
| LOGISTICS NOTES: |
| ENGINEERING DISPOSITION: |
| 24 RESPONSE TO VENDOR: |
| Group1: Off |
| Group2: Off |
| 18 REPORTED BY: |
| SIGNATURE: |
| PHONE: |
| Group4: Choice1 |
| Group3: Off |
| Check Box2: Off |
| Group5: Off |
| Group6: Off |
| Group7: Off |
| Group13: Off |
| Group14: Off |
| Group12: Off |
| Group9: Off |
| Group11: Off |
| Group8: Off |
| Group10: Off |
| Group15: Off |
| Group16: Off |
| Group17: Off |
| Group18: Off |
| Group19: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box5: Off |
| Check Box8: Off |
File details come from the government source that posted it. Updated .