VA241-18-R-0698 00002 VA241-18-R-0698 00002.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VA241-18-R-0698-00002001.pdf | ||
| VA241-18-R-0698-00001002.docx | DOCX document | |
| VA241-18-R-0698-00001003.pdf | ||
| VA241-18-R-0698-011.pdf | ||
| VA241-18-R-0698-012.pdf | ||
| VA241-18-R-0698-009.docx | DOCX document | |
| VA241-18-R-0698-010.pdf | ||
| VA241-18-R-0698-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITE
M 10A.
15C. DATE
SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE
SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 02-16-2018 650-336 90c Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue Providence RI 02908 90c Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue Providence RI 02908 To all Offerors/Bidders
VA241-18-R-0698
02-16-2018
X X X X The above referenced solicitation identified in block 9a for the construction of the parking garage at the Providence VA Medical Center is hereby amended as follows:
1.) See the attached responses to the RFIs which are hereby incorporated into the solicit ation and resulting contract.
2.) See the attached sign-in sheet from the site visit.
3.) All other terms and conditions remain unchanged.
------------------------------------------------END---------------------------------------------------------------------
Karla Rotondo Contracting Officer Q1: An onsite storage area for staging of 20-25 loaded trailers of precast will be required. Is there a location on the VA campus contractor can utilize for this staging area? The project site requirements are too restricted to allow ample staging area.
Per Specification 01 35 13 – Special Project Procedures, Part 1.4; there are no exclusive areas within the campus that can be given to the contractor for their storage needs.
The Contractor will be responsible for coordinating the staging, storage, and delivery of precast units, materials, and equipment in a manner that minimizes impacts to the operation of the Hospital, patients, staff, public and motor vehicle traffic. The costs associated with this coordination, including offsite storage, vehicle escorts, police details, and other costs associated with storage, staging and delivery of materials, equipment, etc. shall be included in the Contractors bid price.
Q2: Reference Drawing C-101, General Note 7. - Please confirm contractor is required to pay required private utility fees.
General Note #7 on C-101 referrers to the fees associated with National Grid providing a new electrical service originating from the utility pole along Chalkstone Ave. as shown on the plans. The estimate from National Grid to complete the work is $26,000 and shall be included in the base bid for the project.
Q3: Are there any utilities located below the sidewalk along Chalkstone Ave. that will be encountered during installation of the underground electric conduit.
Yes. Fiber optic cables are known to exist below the sidewalk along Chalkstone Ave., between the utility pole and the VA property.
Q4: If the elevator manufacturer is unable to fit the selected car in the elevator shaft shown, can the shaft be expanded to support the rough opening requirements? Otherwise, is a 350FPM elevator acceptable?
The elevator shaft will be modified to accept specified elevator design requirements. This is an item that must be coordinated by the contractor. Adjustment of the shaft dimensions to endure the approved elevator is accommodated shall be at no cost to the government.
Q5: Can the Site Superintendent share other duties, such as the Site Safety & Health Officer (SSHO)?
In general the Site Superintendent may share other duties in accordance with the FAR / VARR. Please note that the Specifications (Section 01 35 26 – Safety Requirements, Part 1.4-B.4.g.3) the site superintendent can share other duties such as Site Safety and Health Officer/SSHO provided the site supervisor duties are not neglected. Please note that the SSHO must meet the requirements of all applicable OSHA standards. Please review specification section 01 35 26 – Safety Requirements for SSHO requirements.
See attached document: S04 Site Visit Walk-Thru.