This document is a Performance Work Statement (PWS) for Field Engineering Services at Camp James A Garfield. The contractor shall provide field engineering services including performing design reviews, updating as-built drawings, drafting sketches to support change orders and contract modifications for assigned projects, and conducting detailed preconstruction site surveys. The period of performance is one base year with four one-year option years. Key requirements include monitoring contractor performance, maintaining accurate project documentation, providing technical plan and specification review services, and performing construction inspection and administration duties. The related federal contract opportunity awarded a contract for these field engineering services to Veterans Professional LLC on September 9, 2024 for $958,348.80.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Field Engineering Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Field Engineering Services, as defined in this PWS.
1.1.1 Objectives: Services include performing design reviews, updating as-built drawings and drafting sketches to support change orders and contract modifications for assigned projects. Perform detailed preconstruction site surveys. Review as-built drawings at the end of construction.
1.2 Background: Due to the increasing number and complexity of projects at Camp James A Garfield, the DPW requires assistance with project management and construction monitoring.
1.3 Period of Performance (PoP): The Period of Performance shall be one (1) Base Year of (12) twelve months and (4) four (12) twelve-month option years.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at CJAG Building 1068. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework: Teleworking is not authorized. The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 For contractors requiring Common Access Card (CAC): The CAC is the DoD Federal Personal Identity Verification (PIV) credential. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled Tier 1 investigation at the Office of Personnel Management.
Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2 or the Trusted Associate Sponsorship System (TASS).
1.4.5.1.1 Homeland Security Presidential Directive (HSPD)-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and shall process all CAC card applications. The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form TBD at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.
1.4.5.1.2 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below. Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security-related matters, such designation facilitates these processes. If a Corporate FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:
1. The contractor's FSO or contractor employee shall submit requests for a CAC via email to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be TBD.
2. The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a user ID and password, via email, to the contractor’s FSO or contractor employee. The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at: https://tass.dmdc.osd.mil/tass/. The contractor’s FSO or contractor employee shall follow up to ensure that the TA is processing the request.
3. The Government will inform the contractor's applicant, via email, of one of the following:
a. Approval. *Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator: http://www.dmdc.osd.mil/rsl/).
b. Rejection. *The Government, in separate correspondence, will provide reason(s) for rejection.
c. Return. *Additional information or correction to the application required by the contractor employee.
*The contractor shall maintain records of all approved and rejected applications.
1.4.5.1.3 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by Social Security Number (SSN) and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification". Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.
1.4.5.1.4 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the TA, unless there are extenuating circumstances approved by the COR or KO.
1.4.5.1.5 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee, and shall obtain a receipt for each card and provide it to the TA/COR.
1.4.5.1.5.1 Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1.6 The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a Government computer network. Note: If employees of a contractor lose the privilege to access AKO, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their AKO accounts.
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).
1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.
1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.
1.4.5.4 Reserved.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:
1.4.5.6.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.6.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).
1.4.5.6.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.6.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.6.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.5.7 Army Training Certification Tracking System (ATCTS): All contractor employees with access to a Government information system shall be registered in ATCTS (https://atc.us.army.mil/iastar/index.php) at commencement of services, and shall successfully complete the DoD Information Assurance awareness training prior to access to the IS and then annually thereafter. (https://iatraining.us.army.mil/).
1.4.5.8 Information Assurance (IA) Training. All contractor employees and associated subcontractor employees shall complete the DoD IA Awareness Training before issuance of network access and annually thereafter.
1.4.5.9 Reserved.
1.4.5.10 Reserved.
1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.
1.4.5.12 Reserved.
1.4.5.12 Reserved.
1.4.5.13 Reserved.
1.4.5.14 Reserved.
1.4.5.14 Reserved
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. Reserved.
1.4.6.1.1 Reserved.
1.4.6.1.2 Reserved.
1.4.6.1.3 Reserved.
1.4.6.2 Lock Combinations: Reserved.
1.4.7 Special Qualifications: Reserved.
1.4.9 Contract Manager (CM): The contractor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the COR within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Reserved.
1.4.13 Reserved.
1.4.14 1.4.14 Reserved.
1.4.15 1.4.15 Reserved.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AEI | Army Enterprise Infostructure | |
| AR | Army Regulation | |
| AT/OPSEC | Antiterrorism/Operational Security | |
| BI | Background Investigation | |
| CM | Contract Manager | |
| COR | Contracting Officer Representative | |
| DA | Department of the Army | |
| DD254 | Department of Defense Contract Security Classification Specification | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DoD | Department of Defense | |
| DSCA | Defense Counterintelligence and Security Agency | |
| FAR | Federal Acquisition Regulation | |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services | |
| HQDA | Headquarters, Department of the Army | |
| HSPD | Homeland Security Presidential Directive | |
| IA | Information Assurance | |
| IS | Information System(s) | |
| KO | Contracting Officer | |
| NGB | National Guard Bureau | |
| OCI | Organizational Conflict of Interest | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| SCR | Service Contract Reporting | |
| SSN | Social Security Number | |
| TE | Technical Exhibit | |
| USD(I) | Under Secretary of Defense for Intelligence |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
3.2 Reserved.
3.3 Reserved.
3.4 Reserved.
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Reserved.
4.1 Reserved.
4.2 Reserved.
4.3 Reserved.
5.0 Requirements: The contractor shall:
5.1 Provide construction management services including construction management and project monitoring duties in support of a military installation.
5.1.1 Provide daily inspection and project management services for Sustainment, Restoration and Modernization (SRM) and MILCON projects for the duration of the contract.
5.1.2 Project services include performing design reviews, updating as-built drawings, sketches to support change orders and contract modifications for assigned projects. Perform detailed preconstruction site surveys. Review as-built drawings at the end of construction.
5.2 The Contractor Shall: Monitor contractors’ performance for compliance with contract terms and conditions.
5.2.1 Review plans and specifications and provide technical expertise and documentation to enable the government COR to ensure contractors are in compliance with all contract documents.
5.2.2 A preliminary Program of Requirements (“POR”) has been prepared by the OHARNG. The Consultant shall further develop this POR including Design Criteria relevant to the projects.
5.2.2.1 The project delivery methods for these Projects shall be a combination of Design-Build and Design-Bid-Build.
5.2.3 The Construction Budget is determined for each project by the OHARNG Planning Estimator.
5.2.3.1 The Field Engineer (FE) shall provide a preliminary evaluation of the State’s PORs, schedules, and construction budget requirements, each in terms of the other and in terms of the Technical Proposals. The FE shall prepare a report of evaluations and submit to the State for review and approval. The FE shall not start the next stage of design without the approval of this submittal.
5.2.4 Reviews on Concept Drawings, Specifications, and supporting data based on the proposed design sufficient to describe project program requirements, applicable code requirements, published product data and other items for a complete project in sufficient detail to demonstrate compliance with the State’s POR for each project.
5.2.5 Review problems encountered and provide the Government with available options to resolve independently, assuring contractor compliance with schedules, methods, plans, and specifications. Provide findings to the Contracting Officer Representative (COR).
5.2.6 Complete Construction Inspection Record daily.
5.2.7 Participate in Pre-Construction Meetings with successful Bidders to describe and confirm the OHARNG construction requirements.
5.2.8 Construction Administration Stage requirements will be included. Attend project meetings, review of Submittals, Construction Progress Schedules, and Contractor Pay Requests related to the project. Allow for weekly attendance of construction Progress Meetings and conduct site visits to observe the progress and confirm acceptability of the Work.
5.2.8.1 The FE shall be present at the Site not less than twice per week whenever any Work is in preparation or progress, unless otherwise excused in writing by the OHARNG.
5.2.9 Advise Project Manager on Contractor’s Requests for Interpretation, including the issuance of Proposal Requests, review of Pricing Proposals, and issuance of approved Change Orders and Change Directives as needed to facilitate required revisions to the Construction Documents.
5.2.10 Attend pre-final and final inspections and provide options/suggestions to the government for punch list development.
5.3 The Contractor Shall: Maintain accurate electronic project folders with appropriate support documentation.
5.3.1 Review submittal documents and other contract documentation by verifying that they meet the established specifications for the COR review and approval.
5.3.2 Review “Requests for Information” from the Contractor and provide potential responses for the COR review and approval.
5.3.3 Alert the COR on known or potential engineering issues associated with the projects and prepare documentation.
5.3.4 Accurately maintain government file on contractual documentation, drawings, specifications, field notes, and inspection records.
5.4 The Contractor Shall: Perform Technical Plan and Specification services. Review plans and specifications for accuracy and completeness at various stages of development. Provide detailed report of findings and available options of technical changes to plans/specifications due to field conditions or safety requirements.
5.4.1 Attend contract bid openings, pre-construction conferences, to provide needed information to clarify technical portions of specifications and plans.
5.4.2 Provide engineering office with results of technical review for the formulation of plans and specifications for new projects to establish a starting point or point of reference.
5.4.3 Provide the COR and Contracting Officer with technical solutions, available options, and documentation to support claims. Utilize good judgment and initiative in presenting options.
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars
Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 (Change 1: 07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf
| DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC) 09/09/14 (Change 1: 05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce Improvement Program 12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM) 02/28/2006 (Change 2: 05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors 03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx
AR 25-2
Information Assurance 04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 530-1
Operations Security 09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 525-13
Antiterrorism 12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 381-12
Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b) 06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
DD 1172-2
Application for Identification Card/DEERS Enrollment
| Mar 2017 |
| http://www.dtic.mil/whs/directives/forms/index.htm |
I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| https://www.esd.whs.mil/Directives/forms/dd0001_0499/ |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| Monitor and/or manage projects for new construction, renovations, and improvements to real property facilities, including utility systems, utilizing a professional knowledge of civil engineering. |
| 5.0 |
| · Project folders reflect records of regular contractor monitoring 95% of the time. |
Periodic Inspection/Spot Checks/Customer Complaints/ Monthly/ By Customers and COR
The Contractor Shall: Perform Technical Plan and Specification services. Review plans and specifications for accuracy and completeness at various stages of development. Provide detailed report of findings and available options of technical changes to plans/specifications due to field conditions or safety requirements.
| 5.4 |
| Construction Inspection Record (AF IMT 1477) is completed daily, with 98% accuracy and final within two days 98% of the time. |
| Periodic inspection of work order log / Monthly / COR |
| Provide engineering technical support including scope of work development, IGE development, and drafting for contract modifications or Local SRM projects. |
| 5.4.2 |
| Scope of work is accomplished within established time frame 98% of the time. |
Random inspection of work order log / Monthly / COR
| Technical Plan Specification Services |
| 5.2.3.1 |
| Responses to "Requests for Information” are accurate and provided within five days of request, meeting 90% of suspense’s. |
| Periodic inspection of work order log / Monthly / COR |
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
1.4.5.1.5 Receipt for each CAC card returned to the DEERS office
| Within 15 calendar days of returning issued CACs to the DEERS office upon departure or dismissal of each contractor employee |
| 1 |
| Electronic Submission |
| TA/COR |
| 1.4.5.3 AT Level 1 Awareness Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.4 iWATCH Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.11 OPSEC
Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.10 Identification Media |
| Return within 14 days of employee’s departure from contract performance. |
| Original(s) |
| Hard Copy |
| KO |
Ver. October 2022