Technical_Specifications_1.pdf

PDF 144 KB Posted

Attached to
Provide ground-based interferometric radar system Federal contract opportunity
Solicitation number
140G0321Q0066
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to Provide ground-based interferometric radar system, newest first.
File Type Posted
synopsis_NOI_1.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ground-Based Radar and Monitoring of the Barry Arm Landslide Minimum Technical Specifications

Vendor/product must include the following characteristics:

• Be capable of sub-millimeter deformation monitoring of landslides and other geologic features at up to 4.5 km range using ground-based synthetic aperture interferometric radar at wavelength acceptable to FCC licensing requirements.

• Have an autonomous, efficient, power supply capable of powering the radar system for a period of three months under the harsh and cold environment of southern Alaska.

• Be capable of high resolution (40+ MB) image capture of a ~ 5 sq. km landslide area several times per day and on demand.

• Have an autonomous, efficient, power supply capable of powering the camera system for a period of 12 months a year under the harsh and cold environment of southern Alaska.

• Provide for ability to efficiently obtain replacement parts of radar, control, and power supplies, as necessary.

• Provide for ability to upload the data to the internet for remote data archiving and data processing.

• Provide for near-real-time analysis of landslide deformations using radar and image particle tracking with ability to telemeter data from southeastern Alaska and show visualizations of processed data.

• All physical components must be transportable by helicopter to a remote field site.

File details come from the government source that posted it. Updated .