Technical_Questionnaire_-_Harbor_Refuge_Ext_Rehab.docx
DOCX document 24 KB Posted
- Attached to
- Harbor Refuge Rehab Federal contract opportunity
- Solicitation number
- 140P6422R0003
About this file
This document contains a technical questionnaire and related federal contract opportunity notice. The technical questionnaire requests responses from offerors on their technical approach, management approach, key personnel, and proposed construction schedule for the Harbor Refuge Exterior Rehabilitation project at Pictured Rocks National Lakeshore. Work includes removing and replacing roofing, siding, windows and performing masonry and structural repairs. The federal contract opportunity is solicitation number 140P6422R0003 for the Harbor Refuge Rehab project between $500,000 to $100 million. It is a firm-fixed price construction contract adhering to Construction Wage Rate requirements in Alger County, Michigan. Evaluation criteria are technical, past performance and price. The NAICS code is 238990 and it is fully set aside for total small businesses. The contracting agency is the National Park Service Midwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| Revised_Project_Specifications_0001.pdf | ||
| Site_Visit_Sign-in_Sheet_0001.pdf | ||
| Sol_140P6422R0003_Amd_0001.pdf | ||
| Wage_Determination.pdf | ||
| Past_Performance_Questionnaire_-_Harbor_Refuge_Ext_Rehab.doc | DOC document | |
| Notice_to_Contractors.pdf | ||
| Attachment_-_Certification_of_Vaccination_Form.pdf | ||
| Sol_140P6422R0003.pdf | ||
| Bid_Schedule_-_Harbor_Refuge_Ext_Rehab.pdf | ||
| Statement_of_Work.pdf | ||
| Past_Performance_Questionnaire_-_Harbor_Refuge_Ext_Rehab.pdf | ||
| Bid_Schedule_-_Harbor_Refuge_Ext_Rehab.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire_-_Harbor_Refuge_Ext_Rehab.pdf | ||
| Attachment_-_Vaccination_Certification_Notification_Template.pdf | ||
| Submittal_List.pdf | ||
| Drawings-Specifications.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Harbor Refuge Exterior Rehabilitation
Pictured Rocks National Lakeshore
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID/PRICE SCHEDULE, YOUR RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER RATING (PLEASE SEE SECTION M OF THE SOLICITATION FOR EVALUATION INFORMATION). YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
SUBFACTOR #1 – Technical Approach
Technical approach is your means and methods to complete the technical aspect of required work in historic structure rehabilitation as described in the project specifications. Submit a written narrative limited to 5 pages describing your technical approach to the specific aspects below. Additional pages will not be evaluated. Pictures can be included and will not be counted towards the page limitation.
· Approach to Critical Contract Requirements: Describe your approach to successfully accomplish historic structure rehabilitation in accordance with requirements outlined in the Project Specifications and Drawings within proposed contract performance period and budget.
SUBFACTOR #2 – Management Approach
Please describe your company, or subcontractor's, experience and success in managing similar projects for historic structures - including a list of 3 relevant projects completed within the last 7 years.
SUBFACTOR #3 – Key Personnel
Identify your on-site Project Supervisor/Crew Leader and their experience managing projects of a similar nature, along with other key positions you, or your subcontractor(s), will be utilizing on this project if awarded the contract.
· Project Manager
· Superintendent
· Construction Management (field staff
· On-Site Quality Control Specialist
· On-Site Safety Specialist/Manager
SUBFACTOR #4 – Schedule
Submit your proposed construction schedule for THIS SPECIFIC PROJECT showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Submit your schedule so that it is clear and concise, addressing the following: major milestones, explain schedule logic, critical path activities, procurement lead-times and key considerations and constraints.
There is no preprinted form for this submittal.
File details come from the government source that posted it. Updated .