Tech.Specs 191T7023Q0035 - VT Generator Replacement.pdf

PDF 15 MB Posted

Attached to
VT Generator Replacement, Rome, Italy Federal contract opportunity
Solicitation number
191T7023Q0035
Issued by
Department of State

About this file

This solicitation requests proposals to replace generators at a facility in Rome, Italy. The Department of State is seeking contractors to remove and replace three diesel generators, including all necessary equipment and installation. Proposals are due by April 15, 2021, with work to be completed within six months of award. Pricing shall be fixed for the base year and two option years. The contract will be set aside for small businesses, with a preference for Service-Disabled Veteran-Owned Small Businesses. The incumbent contractor's performance on previous generator maintenance and repair work will be considered in the evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to VT Generator Replacement, Rome, Italy, newest first.
File Type Posted
Questions and Answers.doc DOC document
RFQ 191T7023Q0035 - VT Generator Replacement.docx DOCX document
BoQ 191T7023Q0035 - VT Generator Replacement.pdf PDF
Cover Letter - 191T7023Q0035.pdf PDF
SF-1442 - 191T7023Q0035 - VT Generator Replacement.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Embassy of the United States of America Rome, Italy

VILLA TAVERNA

Replacement of the old Generator

Facility Engineering Office

Summary

1. GENERALITY

1.1. SUBJECT OF THE CONTRACT 5

1.2. GENERAL REQUIREMENTS OF THE CONTRACT 5

1.3. OFFER AND ALL-INCLUSIVE PRICES 6

2. DESCRIPTION OF THE WORKS

2.1. NEW AREA FOR THE GENERATOR 9

2.2. THE GENERATOR 12

2.3. ELECTRICAL PANEL - C.G.T. PANEL TYPE D 17

2.4. WORK INSIDE THE BUILDING “A 21

2.5. NEW TANK ROOM 21

2.6. NEW DIESEL TANK 22

2.7. INTERFERENCES IN GENERAL 23

2.8. CONNECTIONS BETWEEN NEW GENERATOR AND MAIN ELECTRICAL BOOTH 23

3. SOLICITATION CHARACTERISTICS

3.1. CONTRACT PHASE 25

3.2. IMPLEMENTATION PHASE 25

3.3. CONCLUSION PHASE 26

3.4. PERFORMANCE TIME AND PENALTIES FOR DELAYS 26

3.5. SUBCONTRACTING AND PIECEWORK 26

3.6. WORK IN PROGRESS 27

3.7. PARKING 27

3.8. WORK IN GENERAL 27

4. CONSTRUCTION SITE SAFETY

5. PROCEDURE FOR EXECUTING THE WORKS

5.1. MATERIAL ACCEPTANCE RULES 28

5.2. GENERAL RULES 28

5.3. QUALITY OF MATERIALS 29

5.4. EQUIVALENT MATERIALS 29

5.5. WORK FOR CABLE CONDUICT 30

5.6. INTERFERENCES, CROSSINGS, PARALLELISMS AND DISTANCES BETWEEN SUBSERVICES 33

5.7. REBOUND 34

6. ROAD WORKS

6.1. DEMOLITION OF FLOORING 35

6.2. EXCAVATION - FILLING - TRANSPORT TO LANDFILL 36

6.3. ROAD RESTORATIONS 37

6.4. INSTALLATION OF MANHOLE COVERS 39

7. TECHNICAL REQUIREMENTS FOR THE EXECUTION OF RENTALS AND TRANSPORT ... 41

7.1. PROVISIONAL WORKS 41

7.2. RENTALS 41

7.3. TRANSPORTATION 41

8. REQUIREMENTS ON QUALITY AND ORIGIN OF MATERIALS

8.1. MATERIALS FOR STRUCTURAL WORKS 42

9. CONCRETE

9.1. TYPOLOGY 42

9.2. CEMENT CONGLOMERATE FOR ELEVATED WORKS 42

9.3. EXPOSURE CLASS 43

9.4. COMPONENTS OF THE CEMENT CONGLOMERATE 43

9.5. WATERFALL 43

9.6. HYDRAULIC BINDER 44

9.7. AGGREGATES. 44

9.8. ADDITIONS 45

9.9. ADDITIVES 45

9.10. SLURRY RHEOLOGY AND GRANULOMETRY OF AGGREGATES 46

9.11. WATER/CEMENT RATIO 46

9.12. WORKABILITY 47

9.13. AIR CONTENT 48

9.14. LAYING IN THE CONGLOMERATE WORK 48

9.15. FORMWORK 49

9.16. SEASONING 49

9.17. STEEL FOR REINFORCED CONCRETE 50

10. STEEL FOR METALLIC STRUCTURES

10.1. TYPOLOGY 52

10.2. IDENTIFICATION 52

10.3. MARKING 53

10.4. LOCATION OF MARKINGS 53

10.5. STAMPING 53

10.6. LENGTH 53

10.7. COMING TO COMPRESSION 53

10.8. STORAGE AND HANDLING ON SITE 53

10.9. PRE-ASSEMBLY ON SITE 54

10.10. ON-SITE ASSEMBLY 54

10.11. CUT 54

10.12. BEARING CONTACTS FOR JOINTS SUBJECTED TO COMPRESSION 54

10.13. STIFFENERS 55

10.14. STRAIGHTENING 55

10.15. WARM UP 55

10.16. TEMPORARY CONNECTIONS 55

10.17. ASSEMBLY 55

10.18. ALIGNMENT OF STRUCTURES 55

10.19. PILLAR LEVELLING 56

10.20. THEORETICAL DESIGN COUNTER-ARROWS 56

10.21. COUNTER-ARROWS FOR THE SETTLEMENT OF THE JOINTS 56

10.22. BASEPLATE BOLTS IN SLEEVES 56

10.23. WELDED JOINTS 56

10.24. WELDING PROCEDURE 56

10.25. TEMPORARY WELDS AND TEMPORARY CONNECTIONS 57

10.26. BUTT WELDS 57

10.27. WELDS OF PINS OR CONNECTORS 57

10.28. WELDING TEST 57

10.29. SLAG REMOVAL 57

10.30. HOLES FOR BOLTED CONNECTIONS 57

10.31. PREPARATION OF THE ELEMENTS TO BE BOLTED 58

10.32. CONDITION OF THE BOLTS 58

10.33. WASHERS 58

10.34. VARIABLE THICKNESS WASHERS 58

10.35. LOCKING BOLTS 58

10.36. LENGTH LIMITS 58

10.37. BOLT PULL 58

10.38. CONNECTIONS THAT ALLOW MOVEMENT - SLOTS 58

10.39. CHEMICAL CONNECTORS 59

10.40. ANCHOR BOLTS 59

10.41. CORROSION PROTECTION - GALVANIZING 59

11. CHECKS

11.1. CEMENT CONGLOMERATE 60

11.2. STEEL FOR REINFORCED CONCRETE 61

11.3. STEEL FOR METALLIC CARPENTRY 61

12. ELECTRICAL EQUIPMENT

13. TECHNICAL REQUIREMENTS FOR THE EXECUTION OF BUILDING WORKS

13.1.1. Bearing structure

13.2. SITE ORGANIZATION AND SAFETY 64

13.3. DAMAGE 66

14. PRESENTATION OF OFFER

15. CATALOGUE CUTS

16. REGISTRY OF SUBMISSION

17. DRAWINGS

1. GENERALITY

1.1. Subject of the Contract

The object of this contract concerns the works relating to:

- supply and installation of a new electric generator;

- construction of a reinforced concrete and steel structure dedicated to containing the aforementioned generator;

- the supply and installation of a 1,300/1,500 lt diesel tank, serving the generator, to be placed inside the building which now there is the old generator;

- the removal of all electrical and distribution infrastructure serving the old generator (for example, cables, diesel pipes, electrical and control panels, pumps, the old generator itself and anything else necessary).

The works are located within the pertinent area of the Park called "VILLA TAVERNA".

The works object of the contract, described in this Scope of Work (hereinafter SOW), must be complete in all their parts, even for what is necessary not expressly mentioned, but in any case for the complete and workmanlike work, suitable for the meeting the anticipated need.

For a complete identification of the work, please refer to the technical conditions indicated in this SOW and to the drawings.

A complete maintenance booklet for each individual component must be delivered.

1.2. General Requirements of the Contract

All the works described in the descriptive and graphic documents must be carried out in the most scrupulous observance of the Laws, rules and regulations, in any case, in a workmanlike manner.

It stands to reason that all the costs for the issue by the competent Authorities of any access permits or temporary occupation of the external area are borne by the Contractor (hereinafter the Company or Contractor).

All non-reusable removal materials, contemplated in this deed, will be transported to public landfills or eventually to places indicated by the Client at the care and expense of the

Contractor for which suitable transport documentation must be provided and delivery to authorized landfills without the expenses such as the work will not be compensated.

It also remains established that all costs relating to site inspections and surveys that the

Company deems most appropriate during the construction site or temporary site inspection are included and compensated for in the lump-sum prices referred to in this contract.

Prior to the start of work, the Contractor must provide the Client with:

within days 30 (thirty) calendar and consecutive days, including holidays and semi-holidays from the date of the Notice to Proceed:

a construction site and assembly project , complete in every detail and completion of the project responsible for the basis of the tender signed by Company technical staff responsible for the production of the modules themselves;

a detailed work schedule;

Any executive Calculations, personally signed by a qualified person, adapted with suitable geological investigations, of the structures to be built including the construction details of the solutions adopted for their construction.

Upon delivery of the works, the Contractor will arrange at its own expense to organize and set up the site within the area dedicated to the works, being responsible for the custody of means and materials, as will be better specified in the following documents that the Company is required to draw up and send to the COR, before handing over the construction site, to the

CSE and to the Project Supervisor.

All charges relating to demolitions, removals and clearing of bushes of the relative areas of intervention must be considered included and compensated, including handling on site, any lifting and lowering, loading and transport to landfill of resulting materials and download charges.

All the charges relating to the preparation of all the temporary works, such as delimitations and anything else necessary for the safe execution of the works relating to the intervention in question, are also to be considered included and compensated in the lump sum prices.

Any material used (“gravel, scree…”) to make the site area suitable for vehicles is included.

With regard to removals and excavations, these must be carried out in an orderly manner and with the necessary precautions, in order to prevent any injury to workers and to avoid inconvenience or disturbance to the performance of activities within the area.

The production of dust must be limited, therefore the resulting materials must be, if necessary, covered and contained in "removable" containers until they are disposed of.

For the indications referring to the constructional and dimensional characteristics of the artefacts, reference must be made to the description of the works and to the current state of the places, which the Contractor must have compulsorily examined in the places concerned.

Finally, it should be noted that the unit prices applied to the various magisteriums must therefore include general expenses, any costs for design, assembly and assembly, Company profits, charges for labour, transport, freight and materials, etc.

1.3. Offer and All-Inclusive Prices

The works referred to in this deed are "lumpsum contract". By accepting this contract, the

Contractor declares, to all intents and purposes, that in formulating the offer it has taken into account all the particular and general situations inherent in the contract covered by this deed and, in particular, that it has evaluated all the obligations and charges indicated or referred to even implicitly, also evaluating the new prices if present, with the relative analyses.

The Contractor agrees to carry out the works according to the conditions and methods established or referred to in this Deed, even implicitly.

In accepting this contract, the Contractor declares to have taken full knowledge of the area subject to intervention and its nature, which lead to greater costs, to have normally examined the general, particular and contractual circumstances relating to the contract and the execution times and that you have taken all of this into account in your offer.

The Contractor acknowledges that the consideration for the contract, agreed in the manner and under the conditions all indicated or referred to implicitly in this deed, is inclusive of all the works and furniture required for the perfect execution of the contract itself in its entirety and functionality, including charges of all kinds.

With the lump sum prices of the estimate, it is intended to compensate the Contractor for any general and particular burden for undertaking the works to be fully functional and complete even in the non-mainstream parts and prescribed in these Specifications. Consequently, the estimated prices cannot be subject to changes due to incomplete or erroneous forecasts made by the Company in determining the offer during the tender. In the price the value of the offer, the Company must also include for all prices take into account the charges referred to in the

Administrative Conditions and in particular:

• on-site supplies of all materials;

• sources of energy and water supply;

• labor performance;

• rental of all necessary equipment of any kind;

• charges deriving from the general and particular conditions of these Regulations

(geotechnical tests and professional services, relating to checks, calculations, tests, documentation and certifications, static tests, technical tests - provisional, final test, etc.);

• contractual and tax expenses.

At the beginning of the works, the Contractor will take care and expenses to organize and set up its construction site on the areas granted, according to its instructions given by the COR, as per the timetable presented by the same Company, being responsible for the custody of means and materials , as will be better specified on the POS (operational safety) that the Company will be required to prepare in advance of the construction site installation.

All charges relating to the construction site of the intervention areas (delimitations, shelters, walkways, systems, etc.) which will be implemented from time to time by the Contractor must be considered included and compensated, even if not expressly provided for in these

Specifications, but however necessary for the correct execution of the contract. All charges relating to the preparation of all temporary works, such as scaffolding, shoring and anything else necessary for the safe execution of the works relating to the intervention in question are included and compensated in the lump-sum prices.

2. DESCRIPTION OF THE WORKS

The design of the works has the purpose of replacing the old electricity Generator located inside the

"VILLA TAVERNA".

Picture 1 – Territorial classification, in purple the construction site area and in yellow the temporary material storage area.

More specifically, the works will concern:

Fencing of construction site areas and preparation of storage area and temporary routes;

demolition of the existing structure (small building);

cutting and removing the roots of existing shrubs within the area to be excavated;

Temporary securing of the masonry wall, by building a wooden structure or strut and diagonal flexible pipes;

“Controlled” excavation until reaching the suitable heights for the construction of the structure that will contain the new generator;

Construction of foundation slab and variable height walls in RCK300 normal reinforced concrete;

Construction of a metal structure, including a roof in "corrugated" sheet metal insulated for acoustic purposes, and a metal access ladder;

Fencing of the structure with rhomboidal mesh and steel posts;

Preparation of all pipes pits and covers suitable for the electricity connection, diesel and rainwater drainage.

Management and recovery of "possible interference";

Generator installation, connections, testing and commissioning;

Construction of a REI 120 partition wall, inside the building called "A";

Restructuring of the electrical system (switches, cables, lights and sockets) of the room inside the building called "A";

New flooring, inside the new two rooms in the building called “A”- Room used as a tank;

New 1300/1500lt tank to be placed inside building "A", including pits and pipes for connection to the generator;

Picture 2 – Plan of the intervention

2.1. New Area for the Generator

The area identified for the installation of the new Generator is located on the north side of the park of

"VILLA TAVERNA", in front of the building of the electrical booth and located close to the gate from

Via delle Tre Madonne.

Reinforced concrete and steel structure

The new project involves the construction of a structure, underground and completely hidden on all sides by the existing bush.

The structure will be made of normal concrete with Rck 300, having variable height of the walls, from

0.40 m to 1.00 m, metal fence with posts and rhomboidal mesh, with steel gate with suitable lock

(approved by the COR). All iron artifacts will be painted with a suitable anti-rust paint and subsequent paint with the color indicated by the COR.

To protect and cover the new generator, a steel structure with HE and IPE S275 metal profiles must be built, as per the drawings attached to the SOW. It should be noted that the excavation must be type "controlled", (i.e. using a small-sized half excavator, both for reasons of space, but above all in order not to cause damage to the existing neighboring structures, for example masonry wall, road kerbs existing trees and perimeter bushes).

Picture 3 – Structure for Generator - Perspective

Considered the historical architectural peculiarity of the site, the obligatory presence of an archaeologist is expected during the excavation phase.

Pictures 4 – Structure for Generator – Traversal Section

The generator must be like the one indicated in the SOW, connected to the existing internal electrical network with laying of electrical pipes, underground cables and pipes, wells and driveway covers and anything else necessary to give you the work perfectly functional.

Pictures 5 – Structure for Generator – Longitudinal Section

Note:

The following supplies and installation are foreseen in the structure built for the protection of the generator:

- External electrical system complete with metal conduits of suitable section for the existing system, cables of suitable section (min 2.5 sq. mm);

- electrical panel with outdoor box complete with magneto-thermal and/or differential switches ( see specific drawings);

- Two IP54 outdoor ceiling lights, for lighting, at least 2*36w, complete with cables, pipes and simple switch, with box and cover

- two 220v sockets, industrial type connection;

- two "schucko" type sockets with box and IP54 protection for outdoor use;

- two 10/16A sockets with IP54 box and cover for outdoor use;

- 50*50cm rainwater collection pit, complete with pedestrian grid, PVC pipe with a minimum diameter of 120mm, excavations and connection to the existing rainwater disposal network near the road.

Pictures 6 – Structure for Generator - Sections

2.2. The Generator

The new CATERPILLAR CAT C9 ACERT™ Sound Attenuated Level 1 & Level 2 Enclosures

Generator, model DE275E0 (take a look at the Catalogue Cuts).

With automatic intervention for emergency service on the network line

Electric start

Closed circuit water cooling with mechanical radiator

Diesel engine mapping for low level exhaust emissions

Machine room installation

FROM THE FOLLOWING PERFORMANCES

• Power for CONTINUOUS SERVICE - PRIME POWER calibration kW 200 equal to kVA 250

• Power factor 0.8

• Power for EMERGENCY SERVICE - STANDBY POWER calibration kW 220 equal to kVA 275

• Power factor 0.8

• Rated voltage 400 V three-phase + neutral

• Rated frequency 50Hz

• Nominal rotation speed 1,500 rpm

The power indicated above is understood to be net output at the generator terminals at the reference conditions of the ISO 3046/1 – BS 5514 Standards, equal to:

The powers indicated above are intended as net yields at the generator terminals at the reference conditions of the ISO 3046/1 – BS 5514 Standards, equal to:

• 27°C ambient air temperature

• 152 meters above sea level

• 60% relative humidity

Reference Regulation

The materials covered by this quotation and technical specification are compliant with and/or attributable to following the main international reference standards and the following quality standards and directives

• ISO 9001 Quality System Certification – Stab. Caterpillar –

• UNI EN ISO 9001 Quality System Certification - C.G.T. Energy Division

• 89/392/EEC EEC certification for generating set – Machinery Directive

• 89/336/EEC – 82/499EEC EEC certification for generating set – Electromagnetic Compatibility

• 73/23/EEC EEC certification for generating set - Low Voltage Directive

• 2000/14/EC – Stage II EEC compliance for generating set – Emissions into the atmosphere

• ISO 8528-1 Diesel engine reference standards

• ISO 3046/1 Diesel engine reference standards

• DIN6271 Diesel Engine Reference Standards

• BS 5514 Diesel Engine Reference Standards

• ISO 8528-5 G2 Diesel engine speed regulator reference standards

• BS 4999-5000 Generator Reference Standards

• IEC 34-1 Generator Reference Standards

• IEC 60034-1 Generator reference standards

• VDE 0530 Generator Reference Standards

• UTE NFC 51.111 Generator Reference Standards

• NEMA MG 1-22–1-32-1-33 Generator Reference Standards

Picture 7 - CATERPILLAR CAT C9 ACERT™, model DE275E0

GENERATOR COMPOSITION

CATERPILLAR DIESEL ENGINE MOD. C9

Power for CONTINUOUS DUTY - PRIME POWER calibration engine flywheel output gross of auxiliary absorption kW 228

Power for EMERGENCY SERVICE - STANDBY POWER calibration engine flywheel output gross of auxiliary absorption kW 251

Nominal rotation speed 1,500 rpm

• No.6 cylinders in line

• Bore x stroke 117 x 136mm. – total displacement 8.70 litres

• Supercharged with exhaust gas driven turbocharger

• Post-cooled with air-to-air charge air coolant

• Automatic electronic speed regulator

• Water cooled in closed circuit

• Direct injection with electronically controlled common-rail injection system

• Electric starting at 12 Vdc

• Cooling water pre-heating heater – 220 V single-phase

CATERPILLAR THREE-PHASE SYNCHRONOUS GENERATOR

Power for CONTINUOUS DUTY - PRIME POWER calibration yield at the generator terminals net of auxiliary absorption kW 200 equal to kVA 250

Power for EMERGENCY SERVICE - STANDBY POWER calibration yield at the generator terminals net of auxiliary absorption kW 220 equal to kVA 275

Power factor 0.8

Rated voltage 400V

Rated frequency 50Hz

Nominal rotation speed 1,500 rpm

• Self-ventilated in open circuit

• Self-excited, with Brushless type exciter

• Self-regulated, with electronic type regulator – single-phase

• Single support execution

• Class H insulation of stator and rotor windings

• Mechanical protection Degree IP23

DIESEL ENGINE REFRIGERATION RADIATOR

Cooling radiator for diesel engine circuits

• Water circulating vertical radiant mass, for cooling the engine jacket circuit

• Vertical radiator core with air circulation, for cooling the charge air circuit

Sized for ambient air temperatures up to 45°C

FUEL REFRIGERATION RADIATOR

Return fuel cooling coil from diesel engine to service tank

METALLIC COUPLING JOINT

Flexible metal disc for coupling, complete with flanging bell

SUPPORT BASE

Base in sheet steel sections, to support diesel engine, generator, radiator, accessories

ANTI-VIBRATION MOUNTS

Anti-vibration supports interposed between the generating set and its support base

SERVICE FUEL TANK

Service fuel tank incorporated in the generator set support base

• Capacity about 350 litres

• Complete with filler neck, visual level indicator

GENERATOR COMMAND-CONTROL PANEL – CAT EMCP4.1

Microprocessor module for generating set command and control

• Mounted in box carpentry on the rear side of the generator set base

The microprocessor logic performs the functions of:

• Command and manual/automatic control of the generating set

• Remote start/stop command of the generating set

• Measurement and display of diesel engine and generator operating conditions

Isolated Ethernet card

DIFFERENTIAL PROTECTION

Electronic relay for generator output line differential protection

• Complete with coil for generator protection switch opening

Inserted in the panel carpentry of the EMCP4.1 CAT module

4-POLE AUTOMATIC SWITCH

Automatic four-pole circuit breaker for generator protection against overloads and short circuits

• Capacity 400 A

• Manual opening-closing command

Mounted in box carpentry on the rear side of the generator set base, separate from the EMCP4.1

CAT module carpentry.

DIESEL ENGINE CONTROL AND PROTECTION DEVICES

Diesel engine protection and control devices for:

• minimum lubricating oil pressure

• maximum cooling water temperature

• overspeed

• minimum tank fuel level

• starter battery voltage

Diesel engine stop device on command and/or for malfunction

ACCESSORIES TO COMPLETE THE GENERATOR COMPOSITION

Dry-type inlet air cleaner, single element

Manual oil drain pump from the engine sump

Water drain pipe from the refrigeration radiator

Expansion compensator flexible stub piece for exhaust gas muffler, supplied separately

Residential exhaust gas silencer, supplied separately

• Abatement value about 25 dB(A).

Toolbox for routine diesel engine maintenance

Lubricating oil for diesel engine sump loading

Water-antifreeze refrigeration mixture for loading the diesel engine and radiator circuit

Starter battery electrolyte

Paint according to Caterpillar factory standard cycle

• Finishing color Yellow Caterpillar

SERVICES SUPPLIED WITH THE GENERATOR

Generating set test certificate carried out in the Caterpillar factory test room.

Definitive testing on site and first commissioning of the generating set, with installation work by completed and excluded from the supply limit C.G.T.

• Testing carried out for the maximum total duration of one working day

DOCUMENTATION SUPPLIED WITH THE GENERATOR

Caterpillar instruction manual for generator set use and maintenance

Electrical diagram of the command-control panel CAT EMCP4.1

Diesel engine and generator wiring diagram according to Caterpillar standards

Generating set overall dimensions according to Caterpillar standard

Generating set CE certification issued by Caterpillar

Generating set test certification issued by Caterpillar

• 1 copy of the above documentation is provided, in Italian or in the original language

COVER AND SOUNDPROOFING CABINET FOR GENERATOR, VERSION : SUPPORTED ON THE SKID

TYPE BASE

• Sound power 97 LWA in accordance with EEC Directive 2000/14/EC

• Residual sound pressure 74.0 dB(A) measured at 7 metres

• Residual sound pressure 84.0 dB(A) measured at 1 metre

Monobloc execution for resting on the generator set support base

Complete with:

• Common base for generating set and cabin as described above

• Soundproofing system for combustion and cooling air entering the cabinet

• Soundproofing system for the cooling air coming out of the cabinet

• Exhaust gas silencing system, made with a residential silencer

• Stop button outside the cabinet

• Generator set access side doors for inspection-maintenance

• Lifting arch with barycentric eye

Painting made with a cycle according to Caterpillar factory standards

• Suitable for outdoor installation

• Finishing color Yellow Caterpillar

2.3. Electrical Panel - C.G.T. Panel Type D

NETWORK-POWER GROUP SWITCHING

Electrical panel for network-group switching

• Panel execution for local wall installation

• Construction in accordance with the CEI Standards in force

• Wiring diagram according to CEI Standards and Symbols

• Painting according to C.G.T. standard cycle. - Finishing color Gray RAL 7035

• Certification of testing and compliance with current regulations issued by the supplier C.G.T.

Complete with:

• Microprocessor for generating set operation management, mains voltage control, signal local tion of the alarm-lockout conditions-generator group operating status, command mains-power group switching

• Four-pole mains-group commutation made with motorized commutator – capacity 400 A

Other Professional Technical Supplies and Services included in the work

Lifting means for unloading from the carrier, introduction and positioning

Fuel and consumables for on-site testing and initial start-up

Artificial electrical loads for testing on the generating set

Construction of the masonry works necessary for the installation of the generator set

Materials needed to make the connections with the systems outside the generator set

• Exhaust gas pipes between diesel engine and silencer

• Exhaust gas pipes for machine room internal-external flues

• Fuel pipes between diesel engine - tank - storage tank

• Electrical power and auxiliary cables between the generator set - electrical panels -network and utility lines

Fuel storage tank

Fuel transfer pumps from the tank

Fuel transfer pump control circuits from the tank

Enclosure cabinet and generator set soundproofing

Dampers and/or grilles for air intake and exhaust in the machine room

Silencers on the air intake and exhaust ports in the machine room

UTF tax counter panel

Mains-group switching command switchboard

Mains-group switching electrical panel

Earth network and connection to it

Testing of the generator set in the Centro Motori C.G.T. test room of Vercelli

Performance of C.G.T. personnel in place for:

• Unloading, positioning, mechanical-hydraulic-electrical installation of the generating set

References to quality control procedures and/or inspections and controls not referred to herein

CGT Manual of quality assurance

Technical reports of plant and executive and detailed technical planning

Certification of materials used

Test certificates not indicated herein

Certifications and/or declarations for the proposed materials issued by supervisory bodies and/or institutes and/or Ranking

Sampling of the materials used

Type tests and/or prototype certification

Request and completion of tax and legal paperwork and/or authorization applications at the ed

Competent bodies relating to the issue of permits and authorizations necessary for the installation and use of the generator set.

Load Bank

In addition to the Generator, it has been scheduled to supply a LOAD BANK type “X100L Ultra Light

Resistive Load Bank 100kW” with the characteristics explained into the Catalogue cuts.

Picture 8 – Load Bank

Furthermore, it shall be create a new support for the Load bank, close to the Main Electricl Building .

The construction of a reinforced concrete emplacement, for the installation of the resistive bank (as per the drawings attached to the SOW) is also envisaged in the item.

The item also includes the supply and installation of a cabinet with an aluminum frame and blind panels, to be positioned above the LOAD BANK. This system must be equipped with doors on all three sides to facilitate the passage of air. The three doors will have locks and an open door locking system. Please see picture below

Picture 9 – Load Bank

2.4. Work Inside The Building “A

The Refurbishment works of the premises in the building called "A", will consist in:

- demolition of the partial internal wall, as per the attached drawing;

- Enlarging the entrance door with partial demolition of the masonry and consequent replacement of the entrance gate;

- Removal of all visible, electrical and diesel systems;

- New electrical system, through exposed ducts with suitable sockets and covers, electric cables of suitable section (2.5 sq mm for sockets and 1.5 sq mm for the lights).

- Four 2*18w ceiling lights to mount two for each room. The two rooms must have at least three

"schuko" sockets and three 10/16A sockets for each room, including covers;

- Each room will be equipped with simple switches and diverters for complete control of the lights in the rooms

- Demolition of the existing floor, including the subfloor with a thickness up to 5 cm and subsequent supply and installation of new flooring including rubber or linoleum or resin, at the COR's choice, and with a thickness suitable for heavy loads. the lump sum item includes a new substrate screed (self-leveling or cement), scraps, covings, skirting boards and suitable glues necessary for assembly;

- two-coat painting of all vertical and horizontal walls.

- restoration of plaster and/or masonry if necessary

- construction of a plasterboard wall (as per attached drawing), of the REI 120 type. The wall will have a height up to the roof. achievement of coverage;

2.5. New Tank Room

A plasterboard wall of the REI 120 type will be built inside the current building called "A", where the old generator that will have to be dismantled is located. This is necessary to divide the room into two distinct rooms, the first for storage and detachment of materials serving the park, while the second will be the room in which the new vertical diesel tank will be installed. The tank, of 1,300/1,500lt, will be connected to the new generator with all the necessary excavations and suitable pipes according to the current legislation.

Inside both rooms (storage and Tank), the electrical system shall replaced with new cable, with suitable section, new lights and sockets. At least four neon lights or similar lights will be installed for maintenance operations even at night.

The REI 120 plasterboard walls must be made up of compartmentalization, made up of a metal structure made of plasterboard support min thickness 75mm, mechanically fixed along the perimeter, to which one or more fire resistant slabs must be applied on both sides, to achieve minimum values of REI 120.

The work will be completed by new flooring in porcelain stoneware or industrial-type synthetic resin with compressive strength suitable for the loads installed (e.g. tank).

Picture 10 - Building "A"

2.6. New Diesel Tank

The Tank for the storage and supply of Diesel to the new Generator, must be of the cylindrical type with vertical axis made with plates and dished bottom in carbon steel type S235JR UNI EN 10025 by means of a certified welding process and supported by support feet structural. The tank must be supplied and tested at a pressure of 1/0.5 bar for the interspace and complete with a centimeter size chart.

Main features:

• 400mm diameter manhole with bolted cover and gasket.

• Ring nut with padlockable 3” quick loading coupling.

• Load limiting valve at 90%.

• Mechanical level indicator.

• Support feet.

• External suction pipe.

• Ground connection.

• Pump block sensor at minimum level.

• n°2 ¾ sleeves welded on the outer chamber of the plating for installation of the Eurovac leak detection system.

• Volume between approximately 1,300/1,500 liters;

Picture 11 – Vertical Diesel Tank

Before positioning the tank, a collection tank must be created for any diesel leakage. The tank will be built as in the attached drawings, in masonry or concrete, at least 25cm high and 2.50m wide. The tank will then be covered by a waterproofing insulating membrane suitable for fuels and oils.

2.7. Interferences in General

Inside the "VILLA TAVERNA" park, and above all in the proximity of the intervention area, there could be various interferences, of an electric, water, sewage type, each of which must be respected, and/or replaced or moved.

The interference item includes all manufacturing, materials and/or services necessary for the perfect functionality of the interference found. Therefore, excavations and backfilling, the supply and installation of concrete, sand, wells, cast iron manhole covers, pipes of the same material and/or section as the existing one are included.

2.8. Connections Between New Generator and Main Electrical Booth

The connection between the Generator and the electrical substation shall be built partly on the existing connection network of the current generator and the electrical substation, and partly on a new obligatory section excavation.

The connection shall be through the installation of 8 corrugated pipes, each of a different color, new manholes to be created near the corners and trough the interferences.

Picture 8 – Load Bank

The manholes can be either in reinforced concrete or solid brick masonry and D250 drive-over cast iron lids.

All existing electrical pits must have a cover in drive-over type nodular cast iron.

As for as concerned the cables to be used, their sections, the general electrical panel (inside the electrical substation) and secondary (inside the structure that will contain the Generator), reference must be made to the single-line diagram attached to the SOW .

All components and characteristics of electromechanical and/or electronic devices must be approved by the COR.

3. SOLICITATION CHARACTERISTICS

3.1. Contract Phase

Within 15 calendar days of the date of award, the Contractor shall submit the following documentation to the Embassy’s Technical Office:

· A final and detailed work schedule of the various interventions and relative length of time required to carry out all the work requested in the contract.

· A final Safety Plan as set forth in the General chapter, finalized with the names of all actors and with the results of the discussions with the POSHO.

· A list of the names, complete with bio-data, of all the employees, as well as possible suppliers and sub-Contractors for specific work, who will require access to the work-site. Furthermore, the

Contractor shall submit a complete list of vehicles to be used during the project, indicating the make, model and license number.

· Designation of someone who will be in charge of the project on behalf of the Contractor and who will be fully authorized to discuss and decide together with the COR any variations during the course of the project, both concerning methodology of the work and the supplies.

· Designation of a Safety Manger who will address all safety issues and will monitor the daily operations.

· The register of submittals.

3.2. Implementation Phase

· The implementation phase starts with the Notice to proceed (NTP).

· No work shall be performed before the submission of the shop drawings and relevant approval, by the COR.

· No materials shall be installed prior the relevant submission and approval, by the COR.

· Normal working hours are from 08:00-08:30 up to 17:30 during weekdays. Any work to be carried out after normal working hours or during the week-end shall be agreed upon in advance with the

COR in order to obtain all the necessary authorizations and approvals.

· Demolitions, perforations and other high noise operations shall be carried out no earlier than 09.30.

The quiet rule shall apply even during the time 12.30 to 15.30, during work days.

· The work-site shall be kept as clean as possible.

· Areas for storing material shall be agreed upon, together with the COR, based on logistical-operative criteria.

· Any temporary interruptions of utilities shall be scheduled at least 5 days in advance and shall be subject to approval from the COR.

· Tests on the correct operation of the systems and consignment of parts of completed work shall be carried out in the presence of the person designated by the Contractor and someone authorized by the Embassy. The Contractor shall be responsible for drawing up the necessary delivery reports for the work and systems carried out and shall be subject to verification and acceptance by the COR.

3.3. Conclusion Phase

· Once the project is completed a final inspection shall be carried out with representatives of the

Contractor and the Embassy, in order to verify that the project has been carried out correctly, that it is in compliance with the technical specifications and that the systems operate correctly.

· When the work has been completed and accepted by the Embassy, the Contractor shall submit the following documents to the Embassy’s Technical Office:

· detailed “as-built” drawings showing the new constructions, both the architectural/structural aspects as well as all the systems. The drawings shall be submitted on paper and software in ".dwg" format.

· technical cards of the most important materials used in the project, with a list indicating the location of the vendors and local suppliers.

· certification of conformity and tests carried out by the manufacturers for materials, as well as guarantee of the correct installation of all the materials by the Contractor with regard to the project realization and law requirements.

3.4. Performance Time And Penalties For Delays

The contract performance time and the methods with which these times will be calculated are fully described in the solicitation package and here listed for convenience.

The Registry of Submission, at the following of this document, shall, (but shall not be limited to), indicate the kind of material samples and the number of them for selection and approval by the COR.

Period of time the complete execution of the project, from mobilization to final cleaning:

150 solar days from the "Notice to proceed".

Penalties for delays in completing the project are those described in the tender documents.

3.5. Subcontracting and Piecework

In the subcontracting authorization request and in the subcontracting agreement, the Contractor shall promptly indicate the operational scope of the subcontract, in terms of performance, and specify in unambiguously, in particular, the name of the subContractor, the description of the work or services to be subcontracted – indicating the relative quantities or dimensional parameters referred to each execution area and process phase and referring to the project - the individual areas the individual process phases in which the subcontracted work or services will be performed.

In any case, the Contractor remains responsible towards the contracting authority for the execution of the works subject to subcontracting, relieving the contracting authority itself from any claims of subContractors or from claims for damages made by third parties as a result of the execution of subcontracted works.

It should be noted that in the event of subcontracting of works, the Contractor will be solely responsible for the technical and professional suitability of the subContractor.

In addition, the expected times for the work covered by the contract, the subcontracting must be compatible and congruent with the work program of the main contract (Gantt Chart), by updating it, with the Contractor's commitment to produce the work program updated to the works manager before the start of the subcontracted works .

3.6. Work in Progress

In general, the Contractor shall have the faculty of developing the work in the way he believes more convenient and shall hand it over completed within the terms of the contract, as long as, in the opinion of the COR, this is not detrimental to the outcome of the project and the interests of the

Administration.

The Administration reserves the right to request that a specific task must be carried out within a pre-determined period of time, or to dispose the order of the performance of the work in a way it deems more convenient, especially in relation to requirements depending on the performance of work and delivery of supplies excluded from the contract, without the Contractor having the possibility to refuse or ask for special compensation.

Before starting the work, the Contractor shall submit for the CORs approval a detailed operative schedule and costs, which he will follow during the performance of the contract, in concurrence with the schedule.

3.7. Parking

Parking is allowed inside the Residence. The Contractor's vehicles shall be allowed to park only for loading and unloading materials

3.8. Work In General

All works, civil, electrical, hydraulic, temporary safety of the sites, must be supported by plans and executive drawings for the construction site, which must be approved by the COR.

At the end of the work, the Contractor must provide files in original format (e.g. dwg, word, excel, etc.)

of the As-Builts.

4. CONSTRUCTION SITE SAFETY

The safety of the construction site, including all charges foreseen by the current legislation, will be an important aspect for the planned works. The item includes the following:

- Securing the existing masonry wall using wooden beams and struts for the entire section affected by the excavations, including executive drawings and calculations signed by a qualified technician;

- Fencing of the construction site area, temporary walkways, construction site bathroom.

- Supply and temporary commissioning of a temporary generator of at least 200 kW, with fuel necessary for maximum machine autonomy (full tank) to be installed during the transition phases of assembly and commissioning of the new generator. The lump sum item also includes the supply of cables, pipes, switches, site electrical panels, various specialized technical services, rental, transport and subsequent removal. Preparation of a temporary area for the installation of the temporary generator;

- All types of scaffolding possibly necessary for carrying out the planned works.

5. PROCEDURE FOR EXECUTING THE WORKS

5.1. Material acceptance rules

The materials required for the construction of the works, whatever their origin, will be of the best quality, and will be considered accepted only when, at the unquestionable judgment of the

COR, they correspond to those designated below in terms of nature, quality, durability, suitability and application. Except for special materials, all the works must come from quarries, factories, refineries, etc., deposits. chosen exclusively by the Company, which cannot make any exceptions, if during the course of the cultivation of the quarries, or operation of the factories, establishments, refineries, etc. the materials no longer met the prescribed requirements, or were missing and it was therefore obliged to resort to other quarries, in different locations, or of different origins, it being understood that, even in such cases, the stability unit prices in the list will remain unchanged and the sums for lump sum fees, as well as all that is observed to the quality and individual materials.

5.2. General rules

The articles below must establish the execution rules for the various works contemplated in the

Contract, as well as the technical specifications of the materials used.

As a general rule in the execution, the Company will have to comply with the best rules of the art as well as with the following works. For the categories of works that are not found in this

SOW, and for which no special rules have been prescribed, in particular for any work to be carried out economically, the Company must follow the best procedures dictated by the technique and comply with the orders that for this purpose, the Works Management will issue.

Works which, for any reason, immediately or subsequently prove to be badly performed, must be redone at the Company's expense, without the need for a formal request from the Works

Management; the possible presence on site of an overseer of the Principal cannot be invoked by the Contractor in discharge of its liability.

For the works on the networks and for the construction of artifacts and works of art, the

Company, having received the delivery, referring to the project cornerstones, will first carry out the tracing of the work by affixing the stakes and modifiers for the axis, for the sections and for the works of art; at his care and expense the pickets will be maintained until completion.

5.3. Quality of Materials

All the works envisaged by this SOW can be performed in perfect working order and with materials that meet the technical specifications indicated and/or referred to in this SOW and in the annexed documents.

The quality of the material used in the execution of these works must meet, when not otherwise specified by Company rules or regulations, the requisites required by the laws in force and by the official standards of good construction techniques.

The Client, during construction and at any time, may take material samples from the manufactured articles used to verify their perfect correspondence with the approved types.

In this case, the Company will have to make an operating team available to the client to carry out the activities necessary for the execution of these checks, carried out with the help of a specific specialized Company. These charges will be charged to the Contractor, including any demolition and reconstruction of the works found to be non-compliant.

The Contractor must promptly report any defect or anomaly found on the materials supplied directly by the Principal.

5.4. Equivalent Materials

The Contractor shall verify and ensure that all the materials supplied are new and without defects and that their use and/or installation is carried out using the best techniques and fully respecting the instructions supplied by the manufacturers.

Special parts shall be manufactured solely by workshops that are highly qualified in that specific sector.

The makes indicated in this SOW (Scope of Work) are intended as a point of reference and therefore, the words or approved equivalent are implicit.

Therefore, the makes and products listed are deemed equivalent to each other. Different selections implemented by the Contractor shall be approved in advance by the COR, after submission of samples and technical cards.

5.5. Work for Cable Conduict

1) Pipe handling

The provisions indicated by the producers of the various types of pipes supplied in the specific instructions for use, which must necessarily acCompany the supply of the material, must be scrupulously followed.

In addition to this, the Contractor will have to do the following:

a) Loading, transport and unloading

Loading, transport by any means, unloading and all maneuvers in general must be carried out with the greatest possible care, using means according to the type and diameter of the pipes and adopting all the necessary precautions in order to avoid breakage, cracks injuries or damage in general to the materials constituting the pipes themselves and their coating, if any.

Therefore, protruding and protruding bodies, excessive sliding, contact with which deterioration or deformation of the pipes can still occur. In the construction site one must prepare what is necessary (one will have to prepare to install the pipes, the special pieces and the accessories to be installed).

b) Stacking and storage

The stacking must be carried out by arranging the pipes in stacks in pitches suitably located along the route on a flat and stable area, sheltered from the sun's rays in the case of pipes subject to deformation or deterioration caused by significant thermal variations.

The base of the stacks must rest on suitably spaced tables or on a suitable support bed.

The height will be contained within the limits suitable for the materials and diameters, to avoid deformations in the base pipes and to allow easy sampling.

Stacked pipes can be blocked with wedges to avoid sudden rolling; protective measures, in any case, must be adopted to prevent the heads of the pipes from being damaged in any way.

The ends of the pipes intended for the conveyance of water for human consumption must be protected with suitable caps, in order to avoid dirtying the internal surfaces. For deformable pipes, the ends will be reinforced with provisional crosspieces. The joints, gaskets, bolts and materials in general the rays deposited, if perishable, be rays deposited, until the time of their use, in closed spaces inside containers protected from the sun or from heat sources from with oils or fats and not subjected to loads.

2) Excavation for the pipeline

a) Preliminary excavation operations

Signage of the construction site on the road.

For pipelines to be laid on the road, the Contractor, who remains solely responsible for the suitability and regularity of the road signs, is required to arrange for the laying and efficient maintenance of the prescribed signals, warning signs, trestles, walkways, sheet metal of any type measure and size, lighting, traffic light systems, etc., as well as any surveillance and protection of the works, according to the provisions in force on the subject.

The Client, while reporting the situations of which it may be aware that may arise irregularly, is not required to check daily all the courses in which to carry out the continuous control and the regular execution exclusively to the Contractor.

The Contractor will remain solely responsible, in the event that, as a result of the unreported and reported works, an accident of the works occurs and as specified in other points of the work and persons.

asphalt removal.

The milling of the asphalt must take place before the cut, performed with an asphalt cutter removal saw, and the excavation with a mechanical excavator or carried out milling of the required width with mechanical mechanics.

b) Excavation and niches

Excavation for laying the pipeline will normally proceed from downstream to upstream for the purpose of natural drainage of the water flowing into the cables.

Exc…

This is the start of the file's text. The full file is on GovTribe.