Tabulation of Bids Report Date: 05/20/19

1 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Contractor Responsive?

Engineer's Estimate

Brandt Construction Co.

Construction Solutions Group, LLC

Supplied Industrial Solutions, Inc. no

Base Schedule A

$1,900,000.00

$1,922,262.50

$1,641,874.20

$2,122,885.00

Option: B

$30,000.00

$44,455.50

$44,669.70

$55,793.25

Contractor Responsive?

Engineer's Estimate

Brandt Construction Co.

Construction Solutions Group, LLC

Supplied Industrial Solutions, Inc. no

Total Base Schedule A and Option(s): B

$1,930,000.00

$1,966,718.00

$1,686,543.90

$2,178,678.25

2 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-19-B-000016

Division: Eastern Federal Lands

State: IL County: Carroll

Federal Land: Upper Mississippi River National Wildlife and Fish Refuge Opened at: Sterling, VA

Opened by: C. Shawn Long

Date: 05/16/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: Construction Solutions Group, LLC.__ Award Date: __June 27, 2019_______

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC $1,641,874.20 5512 Elk Valley Estates Dr St. Louis Missouri 63128

Brandt Construction Co. $1,922,262.50 700 4th Street West Milan Illinois 61264

Supplied Industrial Solutions, Inc. Did not submit bid bond / guarantee.

( $2,122,885.00 ) no 550 Niedringhaus Avenue Granite City Illinois 62040

Engineer's Estimate $1,900,000.00

C. Shawn Long

Contract Specialist

5/16/2019

3 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $170,300.00 Brandt Construction Co. Lump Sum $160,000.00 Supplied Industrial Solutions, Inc. Lump Sum $650,000.00 Engineer's Estimate ALL LPSM Lump Sum $140,060.00

A1050 15201-0000 CONSTRUCTION SURVEY AND STAKING

Construction Solutions Group, LLC Lump Sum $50,240.00 Brandt Construction Co. Lump Sum $40,000.00 Supplied Industrial Solutions, Inc. Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $34,000.00

A1100 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $36,380.00 Brandt Construction Co. Lump Sum $70,000.00 Supplied Industrial Solutions, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $34,000.00

A1150 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Construction Solutions Group, LLC $9.56 $152,004.00 Brandt Construction Co. $9.00 $143,100.00 Supplied Industrial Solutions, Inc. $11.00 $174,900.00 Engineer's Estimate 15,900 LNFT $6.70 $106,530.00

A1200 15706-2200 SOIL EROSION CONTROL, FILTER BAG

Construction Solutions Group, LLC $378.00 $1,512.00 Brandt Construction Co. $280.00 $1,120.00 Supplied Industrial Solutions, Inc. $1,500.00 $6,000.00 Engineer's Estimate 4 EACH $1,100.00 $4,400.00

A1250 20220-1000 REMOVAL, INDIVIDUAL TREE

Construction Solutions Group, LLC $856.80 $856.80 Brandt Construction Co. $2,200.00 $2,200.00 Supplied Industrial Solutions, Inc. $714.00 $714.00 Engineer's Estimate 1 EACH $1,700.00 $1,700.00

4 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1300 20301-0600 REMOVAL OF CATTLE GUARD

Construction Solutions Group, LLC $2,268.00 $2,268.00 Brandt Construction Co. $1,500.00 $1,500.00 Supplied Industrial Solutions, Inc. $1,890.00 $1,890.00 Engineer's Estimate 1 EACH $2,300.00 $2,300.00

A1350 20301-1200 REMOVAL OF HEADWALL

Construction Solutions Group, LLC $655.20 $655.20 Brandt Construction Co. $1,800.00 $1,800.00 Supplied Industrial Solutions, Inc. $550.00 $550.00 Engineer's Estimate 1 EACH $700.00 $700.00

A1400 20302-1200 REMOVAL OF GUARDRAIL

Construction Solutions Group, LLC $12.60 $25,200.00 Brandt Construction Co. $11.00 $22,000.00 Supplied Industrial Solutions, Inc. $10.00 $20,000.00 Engineer's Estimate 2,000 LNFT $7.70 $15,400.00

A1450 20302-2100 REMOVAL OF PIPE CULVERT

Construction Solutions Group, LLC $18.90 $4,819.50 Brandt Construction Co. $31.00 $7,905.00 Supplied Industrial Solutions, Inc. $15.75 $4,016.25 Engineer's Estimate 255 LNFT $28.00 $7,140.00

A1500 20401-0000 ROADWAY EXCAVATION

Construction Solutions Group, LLC $56.70 $10,206.00 Brandt Construction Co. $55.00 $9,900.00 Supplied Industrial Solutions, Inc. $47.25 $8,505.00 Engineer's Estimate 180 CUYD $48.00 $8,640.00

A1550 20402-0000 SUBEXCAVATION

Construction Solutions Group, LLC $59.22 $14,805.00 Brandt Construction Co. $60.00 $15,000.00 Supplied Industrial Solutions, Inc. $49.35 $12,337.50 Engineer's Estimate 250 CUYD $35.00 $8,750.00

5 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1600 21101-1000 ROADWAY OBLITERATION, METHOD 1

Construction Solutions Group, LLC $4.79 $12,454.00 Brandt Construction Co. $4.00 $10,400.00 Supplied Industrial Solutions, Inc. $4.00 $10,400.00 Engineer's Estimate 2,600 SQYD $12.50 $32,500.00

A1650 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3

Construction Solutions Group, LLC $84.42 $4,221.00 Brandt Construction Co. $177.00 $8,850.00 Supplied Industrial Solutions, Inc. $70.35 $3,517.50 Engineer's Estimate 50 TON $160.00 $8,000.00

A1700 30110-0000 AGGREGATE SURFACE COURSE

Construction Solutions Group, LLC $47.88 $7,660.80 Brandt Construction Co. $45.00 $7,200.00 Supplied Industrial Solutions, Inc. $40.00 $6,400.00 Engineer's Estimate 160 TON $55.00 $8,800.00

A1750 30202-1000 ROADWAY AGGREGATE, METHOD 1

Construction Solutions Group, LLC $25.20 $110,880.00 Brandt Construction Co. $40.00 $176,000.00 Supplied Industrial Solutions, Inc. $21.00 $92,400.00 Engineer's Estimate 4,400 TON $45.00 $198,000.00

A1800 30302-1000 DITCH RECONDITIONING

Construction Solutions Group, LLC $11.21 $1,121.00 Brandt Construction Co. $27.00 $2,700.00 Supplied Industrial Solutions, Inc. $9.35 $935.00 Engineer's Estimate 100 LNFT $15.25 $1,525.00

A1850 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH

Construction Solutions Group, LLC $3.40 $102,000.00 Brandt Construction Co. $4.00 $120,000.00 Supplied Industrial Solutions, Inc. $2.85 $85,500.00 Engineer's Estimate 30,000 SQYD $4.60 $138,000.00

6 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1900 31301-0000 AGGREGATE-TOPSOIL COURSE

Construction Solutions Group, LLC $31.50 $7,560.00 Brandt Construction Co. $90.00 $21,600.00 Supplied Industrial Solutions, Inc. $26.25 $6,300.00 Engineer's Estimate 240 TON $75.00 $18,000.00

A1950 40101-0500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE III-B)

Construction Solutions Group, LLC $90.72 $557,928.00 Brandt Construction Co. $115.00 $707,250.00 Supplied Industrial Solutions, Inc. $75.60 $464,940.00 Engineer's Estimate 6,150 TON $120.00 $738,000.00

A2050 40101-0500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE IV)

Construction Solutions Group, LLC $107.10 $16,600.50 Brandt Construction Co. $185.00 $28,675.00 Supplied Industrial Solutions, Inc. $89.25 $13,833.75 Engineer's Estimate 155 TON $120.00 $18,600.00

A2150 41201-0000 TACK COAT

Construction Solutions Group, LLC $630.00 $11,340.00 Brandt Construction Co. $500.00 $9,000.00 Supplied Industrial Solutions, Inc. $525.00 $9,450.00 Engineer's Estimate 18 TON $1,100.00 $19,800.00

A2200 60103-1920 CONCRETE, HEADWALL FOR 24-INCH EQUIVALENT DIAMETER PIPE CULVERT

Construction Solutions Group, LLC $3,528.00 $14,112.00 Brandt Construction Co. $4,200.00 $16,800.00 Supplied Industrial Solutions, Inc. $2,940.00 $11,760.00 Engineer's Estimate 4 EACH $2,500.00 $10,000.00

A2250 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Construction Solutions Group, LLC $123.48 $20,991.60 Brandt Construction Co. $210.00 $35,700.00 Supplied Industrial Solutions, Inc. $103.00 $17,510.00 Engineer's Estimate 170 LNFT $95.00 $16,150.00

7 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2300 61401-0000 LEAN CONCRETE BACKFILL

Construction Solutions Group, LLC $604.80 $1,209.60 Brandt Construction Co. $965.00 $1,930.00 Supplied Industrial Solutions, Inc. $1,000.00 $2,000.00 Engineer's Estimate 2 CUYD $1,800.00 $3,600.00

A2350 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS

Construction Solutions Group, LLC $57.96 $128,671.20 Brandt Construction Co. $52.00 $115,440.00 Supplied Industrial Solutions, Inc. $30.00 $66,600.00 Engineer's Estimate 2,220 LNFT $43.00 $95,460.00

A2400 61702-0600 TERMINAL SECTION, TYPE FLARED

Construction Solutions Group, LLC $4,284.00 $4,284.00 Brandt Construction Co. $3,800.00 $3,800.00 Supplied Industrial Solutions, Inc. $2,500.00 $2,500.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00

A2450 61703-0000 TERMINAL END

Construction Solutions Group, LLC $3,150.00 $6,300.00 Brandt Construction Co. $1,800.00 $3,600.00 Supplied Industrial Solutions, Inc. $3,500.00 $7,000.00 Engineer's Estimate 2 EACH $3,000.00 $6,000.00

A2500 61920-2000 REMOVE AND RESET GATE

Construction Solutions Group, LLC $1,512.00 $1,512.00 Brandt Construction Co. $2,200.00 $2,200.00 Supplied Industrial Solutions, Inc. $2,500.00 $2,500.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00

A2550 61921-1000 REMOVE AND RESET FENCE

Construction Solutions Group, LLC $37.80 $1,890.00 Brandt Construction Co. $112.00 $5,600.00 Supplied Industrial Solutions, Inc. $75.00 $3,750.00 Engineer's Estimate 50 LNFT $15.50 $775.00

8 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2600 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Construction Solutions Group, LLC $7.11 $86,386.50 Brandt Construction Co. $10.00 $121,500.00 Supplied Industrial Solutions, Inc. $18.25 $221,737.50 Engineer's Estimate 12,150 SQYD $12.50 $151,875.00

A2650 62502-0000 TURF ESTABLISHMENT

Construction Solutions Group, LLC $3.40 $41,310.00 Brandt Construction Co. $1.70 $20,655.00 Supplied Industrial Solutions, Inc. $9.25 $112,387.50 Engineer's Estimate 12,150 SQYD $3.55 $43,132.50

A2700 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

Construction Solutions Group, LLC $4.41 $6,394.50 Brandt Construction Co. $2.25 $3,262.50 Supplied Industrial Solutions, Inc. $8.88 $12,876.00 Engineer's Estimate 1,450 SQYD $4.05 $5,872.50

A2750 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

Construction Solutions Group, LLC $315.00 $7,875.00 Brandt Construction Co. $45.00 $1,125.00 Supplied Industrial Solutions, Inc. $100.00 $2,500.00 Engineer's Estimate 25 SQFT $55.00 $1,375.00

A2800 63308-3000 OBJECT MARKER, TYPE 3

Construction Solutions Group, LLC $201.60 $2,016.00 Brandt Construction Co. $200.00 $2,000.00 Supplied Industrial Solutions, Inc. $375.00 $3,750.00 Engineer's Estimate 10 EACH $280.00 $2,800.00

A2850 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

Construction Solutions Group, LLC $189.00 $945.00 Brandt Construction Co. $35.00 $175.00 Supplied Industrial Solutions, Inc. $250.00 $1,250.00 Engineer's Estimate 5 EACH $90.00 $450.00

9 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2900 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Construction Solutions Group, LLC $63.00 $2,205.00 Brandt Construction Co. $25.00 $875.00 Supplied Industrial Solutions, Inc. $125.00 $4,375.00 Engineer's Estimate 35 LNFT $45.00 $1,575.00

A2950 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Construction Solutions Group, LLC $189.00 $7,560.00 Brandt Construction Co. $35.00 $1,400.00 Supplied Industrial Solutions, Inc. $20.00 $800.00 Engineer's Estimate 40 SQFT $14.75 $590.00

A3000 63701-0000 FIELD OFFICE

Construction Solutions Group, LLC $7,200.00 $7,200.00 Brandt Construction Co. $20,000.00 $20,000.00 Supplied Industrial Solutions, Inc. $22,000.00 $22,000.00 Engineer's Estimate 1 EACH $11,000.00 $11,000.00

Total Schedule - All Items

Construction Solutions Group, LLC $1,641,874.20 Brandt Construction Co. $1,922,262.50 Supplied Industrial Solutions, Inc. $2,122,885.00 Engineer's Estimate $1,900,000.00

10 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-19-B-000016

Division: Eastern Federal Lands

State: IL County: Carroll

Federal Land: Upper Mississippi River National Wildlife and Fish Refuge Opened at: Sterling, VA

Opened by: C. Shawn Long

Date: 05/16/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _Melvin Sloan________________

Title: __Contract Officer_____________

Date: _____July 3, 2019_____________

Contract Awarded to: _Construction Solutions Group, LLC.__ Award Date: July 3, 2019____

Contractor Comment Bid Amount Responsive

Brandt Construction Co. $44,455.50 700 4th Street West Milan Illinois 61264

Construction Solutions Group, LLC $44,669.70 5512 Elk Valley Estates Dr St. Louis Missouri 63128

Supplied Industrial Solutions, Inc. Did not submit bid bond / guarantee.

( $55,793.25 ) no 550 Niedringhaus Avenue Granite City Illinois 62040

Engineer's Estimate $30,000.00

11 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1000 15101-0000 MOBILIZATION

Brandt Construction Co. Lump Sum $3,000.00 Construction Solutions Group, LLC Lump Sum $1,512.00 Supplied Industrial Solutions, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,460.25

B1050 15201-0000 CONSTRUCTION SURVEY AND STAKING

Brandt Construction Co. Lump Sum $2,500.00 Construction Solutions Group, LLC Lump Sum $630.00 Supplied Industrial Solutions, Inc. Lump Sum $525.00 Engineer's Estimate ALL LPSM Lump Sum $550.00

B1100 15401-0000 CONTRACTOR TESTING

Brandt Construction Co. Lump Sum $3,000.00 Construction Solutions Group, LLC Lump Sum $630.00 Supplied Industrial Solutions, Inc. Lump Sum $525.00 Engineer's Estimate ALL LPSM Lump Sum $550.00

B1150 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Brandt Construction Co. $9.00 $3,870.00 Construction Solutions Group, LLC $13.34 $5,736.20 Supplied Industrial Solutions, Inc. $11.00 $4,730.00 Engineer's Estimate 430 LNFT $6.70 $2,881.00

B1200 20103-0000 CLEARING AND GRUBBING

Brandt Construction Co. $11.00 $4,840.00 Construction Solutions Group, LLC $3.65 $1,606.00 Supplied Industrial Solutions, Inc. $3.05 $1,342.00 Engineer's Estimate 440 SQYD $9.95 $4,378.00

B1250 20401-0000 ROADWAY EXCAVATION

Brandt Construction Co. $80.00 $3,600.00 Construction Solutions Group, LLC $44.10 $1,984.50 Supplied Industrial Solutions, Inc. $36.75 $1,653.75 Engineer's Estimate 45 CUYD $48.00 $2,160.00

12 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1300 30202-1000 ROADWAY AGGREGATE, METHOD 1

Brandt Construction Co. $45.00 $4,950.00 Construction Solutions Group, LLC $31.50 $3,465.00 Supplied Industrial Solutions, Inc. $26.25 $2,887.50 Engineer's Estimate 110 TON $45.00 $4,950.00

B1350 40101-0500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE IV)

Brandt Construction Co. $208.00 $10,400.00 Construction Solutions Group, LLC $113.40 $5,670.00 Supplied Industrial Solutions, Inc. $94.50 $4,725.00 Engineer's Estimate 50 TON $120.00 $6,000.00

B1400 41201-0000 TACK COAT

Brandt Construction Co. $500.00 $500.00 Construction Solutions Group, LLC $630.00 $630.00 Supplied Industrial Solutions, Inc. $525.00 $525.00 Engineer's Estimate 1 TON $1,100.00 $1,100.00

B1450 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Brandt Construction Co. $20.00 $2,300.00 Construction Solutions Group, LLC $63.00 $7,245.00 Supplied Industrial Solutions, Inc. $22.00 $2,530.00 Engineer's Estimate 115 SQYD $12.50 $1,437.50

B1500 62502-0000 TURF ESTABLISHMENT

Brandt Construction Co. $1.70 $195.50 Construction Solutions Group, LLC $50.40 $5,796.00 Supplied Industrial Solutions, Inc. $40.00 $4,600.00 Engineer's Estimate 115 SQYD $3.55 $408.25

B1550 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

Brandt Construction Co. $10.00 $5,000.00 Construction Solutions Group, LLC $18.90 $9,450.00 Supplied Industrial Solutions, Inc. $12.00 $6,000.00 Engineer's Estimate 500 LNFT $3.65 $1,825.00

13 out of 13

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1600 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL

Brandt Construction Co. $300.00 $300.00 Construction Solutions Group, LLC $315.00 $315.00 Supplied Industrial Solutions, Inc. $750.00 $750.00 Engineer's Estimate 1 EACH $300.00 $300.00

Total Schedule - All Items

Brandt Construction Co. $44,455.50 Construction Solutions Group, LLC $44,669.70 Supplied Industrial Solutions, Inc. $55,793.25 Engineer's Estimate $30,000.00

Bid Error Report

1 out of 4

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

2 out of 4

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: A

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Supplied Industrial Solutions, Inc. $2,122,885.00 $2,122,885.00

Construction Solutions Group, LLC $1,641,874.20 $1,641,874.20

Brandt Construction Co. $1,922,262.50 $1,922,262.50

The apparent low bidder is 13.59% below the engineer's estimate.

3 out of 4

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

4 out of 4

Project No: FW-UPSA 101(1)

Project Name: Pavement rehabilitation, drainage improvements, reconstruction of overlook turnaround and three parking areas

Schedule: B

Schedule Type: Options

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Supplied Industrial Solutions, Inc. $55,793.25 $55,793.25

Construction Solutions Group, LLC $44,669.70 $44,669.70

Brandt Construction Co. $44,455.50 $44,455.50

The apparent low bidder is 48.19% above the engineer's estimate.