This justification and approval document authorizes a sole source contract award to CACI Inc Federal for design, engineering, and installation services to add a node to an existing Nokia optical transport system supporting a Marine Corps training facility on Guam. The total value of the acquisition is $500,000 to be funded from Procurement, Marine Corps funds in fiscal year 2021. The services include procuring Nokia equipment compatible with existing nodes, installation, configuration, documentation edits, and logistics support. A sources sought notice closed on January 12, 2021 attracting one response deemed incapable of meeting requirements. The contracting officer determined costs to be fair and reasonable based on past procurements from this contractor for similar work. The justification cites minimal disruption to the critical network as the reason for restricting competition and sole sourcing to the original installer familiar with the system's architecture.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL SURFACE WARFARE CENTER

CORONA DIVISION

PO BOX 5000

CORONA, CA 92878-5000

IN REPLY REFER TO

J&A No. 50,218

Ser 02/1618

JUSTIFICATION AND APPROVAL

FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity

The Naval Sea Systems Command, Naval Surface Warfare Center, Corona Division (Corona Division), Contracts Department, Code 0221.

2. Description of the Action Being Approved

This Justification and Approval (J&A) authorizes the award of a Firm-Fixed-Price, Contract on a sole source basis for design agent engineering service support, procurement and installation of a Nokia based Optical Transport System to Lucent Government Services under CACI. This J&A shall be effective from the date of approval to the end of the contract term. The procedures in FAR subpart

13.5 will be utilized for this procurement in accordance with 41 U.S.C. 1901.

3. Description of Supplies/Services

Corona Division has a requirement to procure the Defense Policy Review Initiative (DPRI) Optical Transport System (OTS) that consists of the following items: Nokia PSS16 shelf with encryption cards and network ports, designed to be compatible with not only the electronics, but also the architecture of the 17 other nodes; Configuration computer, keyboard/video/mouse assembly, and Cisco Network switch for the user management interface; Ancillary equipment to facilitate the power, space and cable management requirements of the installation; Documentation edits to the: Bill of material, Installation design plans, Installation redlines; Configuration files of existing and new equipment; Installation schedule with system integration sequence and reversal plans Logistics support and equipment staging and delivery to Guam.

Ser 02/1618

The total estimate value of this acquisition is $500,000 and will be funded with Procurement, Marine Corps (PMC) funds. The table below depicts the type of funding as well as the estimated amount for fiscal year 2021.

Appropriation FY21 Total

PMC $500,000 $500,000

The Government’s minimum needs have been verified by the certifying technical and requirements personnel.

4. Statutory Authority Permitting Other Than Full and Open Competition

10 U.S.C. 2304(c) (1) Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Rationale Justifying Use of Cited Statutory Authority

The OTS node being procured and installed is in support of Military Construction Project P-715 – Marine Corps Live Fire Training Range Complex. The OTS is required to deliver network services to the range. If MILCON P-715 was completed 2 years prior, the OTS procurement would have been included as part of the original contract of 17 nodes. It was not possible to obligate for a system that was dependent on a MILCON that was not obligated and awarded to design-build contractor.

NCTS system maintainers are relatively new to the operation of the OTS and training provided to them only focuses on the provisioning of circuits and not the incorporation of additional OTS nodes. No other entities, than the original installers that can provide a nodal insertion. The original installers are accustomed to complexity of the OTS architecture and are capable of inserting the node on a critical production system, while minimizing the operational availability of the system. The OTS is the medium that connects terrestrial DISA circuits from cable landing facilities to all military components on the island of Guam. It transports Enterprise- Land Mobile Radio system (E-LMR) services for all components and all NIPRNet, PSNet, and Navy Telephony services. OTS is configured in a fault tolerant architecture. To insert a node, it is to know and change the architecture configuration, potentially eliminating fault tolerance, given that the configuration is in flux. In the event that the overall OTS elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight

Ser 02/1618 system fails, all services without out-of-band and alternate transports will be unavailable. Administrative services for all military components (Andersen Air Force Base, Naval Base Guam, Marine Corps Activity Guam, and other agencies), will cease until the architecture configuration for the OTS is corrected. Cost in loss of productivity will be proportional to all personnel requiring ELMR and NIPRNet services to conduct business.

As of 2017, there are 7000 military just between Andersen Air Force Base and Naval Base Guam. Now with the new base (Marine Corps Base Camp Blaz) being built, and additional 4000 people will be there at end state. Making the assumption that 1/3 to 1/2 of the people are working at any given time on base, and average 100 dollars per hour for the people working (to include benefits and administrative cost per person), a one hour mistake configuring the backbone cost $350K, plus inefficiencies of starting and stopping once services are restored. This does not include the cost to mobilize people to manually secure critical facilities and manually operating entrance control points for the lack of Defense Biometric Identification System (DBIDS).

Currently, there is a project underway to install $162k worth of equipment for the P-715 MILCON plus $340K worth of planning, design, preconfiguring in the CONUS environment (simulating the system, applying security configurations), travel, install, and commissioning new node. This augments a $2.8 million dollar backbone system. In order to install the $2.8 million backbone system, NCTS and NIWC spend about $250k survey, documenting, augmenting and upgrading facilities to support a make-before-break approach at 17 nodes.

Trying to utilize another solution would result in interoperability issues that would severely limit and disrupt Naval operations and create additional costs that couldn’t be mitigated or recouped in a competitive environment.

OTS system owner highly requests RS13 should hire the same agency, CACI,that performed works for existing 17 nodes to do the work for P-715 OTS. This will minimize the technical risks from taking the island-wide live OTS network down during P-715 node insertion. The impact such events would severely disrupt C4/IT communication among our joint DOD services on Guam.

6. Description of Efforts Made to Solicit Offers from as Many elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight

Ser 02/1618

Offerors as Practicable

A Sources Sought Notice (SSN) was posted on the Contract Opportunities (beta.SAM) website, indicating the Government’s intent to sole source this requirement to CACI. The posting was issued on 5 January 2021 and closed on 12 January 2021. At the close of the SSN, one (1) response was received from Heffler Contracting Group (HCG). The customer advised that HGC specialized in Horizontal and Vertical Construction and their capability statement did not show the expertise to achieve the Governments objective. HGC shows no work or history matching the effort needed nor modifications or justifications on their approach to show they will meet the requirement. The government is asking for telecommunication engineers and technicians to augment an existing Nokia PSS DWDM system to provide the Marine Corps Live Fire Training Range Complex communication services.

Without telecommunications utility, the +$78 Million MILCON training complex becomes a campground, not meeting its operational training requirement. With all the above reasons, RS13 has clearly determined that HGC cannot perform the tasks.

The existing NOKIA system is the telecommunication backbone for all the US military, US Navy hospital and three letter agencies on the island under Joint Region Marianas (Naval Base Guam – NCTS).

It transports all the administrative (network, security and telephone) and tactical networks for all the U.S. Military components. In addition, HCG did not identify or show an understanding of similar projects or work history that matches this effort.

7. Determination of Fair and Reasonable Costs

The Contracting Officer has determined that the anticipated costs to the Government for the items covered by this J&A will be fair and reasonable. Significant (or similar) quantities of this requirement have been purchased from this offeror in the past and cost/pricing information was received on those past procurements.

This information should be sufficient to support the fair and reasonable cost determination of this procurement.

8. Actions to Remove Barriers to Competition

For the reasons set forth in Paragraph 5, Corona Division, Contracts Department, Code 02 has no plans at this time to compete

Ser 02/1618 future contracts for the types of items covered by this document.

If another potential source emerges, Code 02 will assess whether competition for future requirements is feasible.

Ser 02/1618

CERTIFICATIONS AND APPROVAL

TECHNICAL/REQUIREMENTS CERTIFICATION

I certify that the facts and representations under my cognizance, which are included in this justification and its supporting acquisition planning data, except as noted herein, are complete and accurate to the best of my knowledge and belief.

COMBINED TECHNICAL AND REQUIREMENTS COGNIZANCE:

Chu-Hwa Lee, PM, RS13 Phone No. Date

LEGAL SUFFICIENCY REVIEW (NMCARS 5206.303(90))

I have determined this justification is legally sufficient.

951-393-5430 Samuel A. Frazer, Counsel, Code 00L

Phone No. Date

CONTRACTING OFFICER CERTIFICATION (FAR 13.501 (a)(2)(i)

I certify that this justification is accurate and complete to the best of my knowledge and belief.

951-393-5240 Christopher Hainsworth Contracting Officer, Code 0221

Phone No. Date

LEE.CHU-

HWA.1398032957

Digitally signed by LEE.CHU-

HWA.1398032957

Date: 2021.02.09 15:04:47 -08'00'

FRAZER.SAMUEL.AN

THONY.1177364483

Digitally signed by

FRAZER.SAMUEL.ANTHONY.1177364

Date: 2021.02.09 17:39:51 -08'00'

2/9/2021 elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight elizabeth.groncki Highlight

File details come from the government source that posted it. Updated .