Tab 4-Ultra Press SOW.pdf

PDF 85 KB Posted

Attached to
Contech Ultra Press Repair-Tinker AFB, OK Federal contract opportunity
Solicitation number
SP3300-25-Q-0099
Issued by
Defense Logistics Agency Distribution

About this file

This Statement of Work (SOW) details field service repair requirements for a Contech Ultra Press Model UP 5050 at the Defense Distribution Depot Oklahoma City located at Tinker Air Force Base. The primary objective is to safely remove and replace upper and lower metal cut guides, safety sensors, and repair stripped mounting holes to ensure the equipment meets manufacturer specifications.

The contractor will be responsible for completing eight specific tasks, including machine power disconnection, parts inspection, guide removal and installation, sensor repair and realignment, and operational testing. The performance period is 15 days from the date of award, with work to be completed at 3420 D Ave. Building #1 Door 68 at Tinker AFB. Final acceptance will be determined by Lonnie Brooks or Broderick Hardrick from DDOO, and the contractor must comply with DDOO security requirements for on-site access.

View the file

Other files for this federal contract opportunity

Other files attached to Contech Ultra Press Repair-Tinker AFB, OK, newest first.
File Type Posted
Tab 11 - CSS SP330025Q0099.pdf PDF
Tab 11 - CSS SP330025Q0099.pdf PDF
Tab 9-Wage Determination.pdf PDF
Tab 11 - CSS SP330025Q0099.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (S.O.W.)

DDOO Oklahoma - Field Service Repair of Contech Ultra Press

Technical Assistant: Broderick Hardrick Defense Distribution Depot 3420 D Ave. Building #1 Door 68 Tinker AFB, OK 73145

(405) 834-2667

Certifying Official: Lonnie Brooks Defense Distribution Depot 3420 D Ave. Building #1 Door 58

Background:

a. Requiring Organization

Defense Distribution Depot Oklahoma City, Oklahoma (DDOO)

b. Purpose of the Statement of Work (SOW)

The purpose of this statement of work is to make sure the contractor safely and efficiently removes and replaces the upper and lower metal cut guides safety sensors and repair stripped mounting holes on the Contech Ultra Press Model UP 5050 and ensuring the equipment is fully operational and meets manufacturers specifications upon completion.

1. Scope of Work to be Performed:

The contractor shall furnish all tools, equipment and materials necessary for removal, repair and installation of upper and lower metal cut guides. The contractor will then operationally test machines for troubleshooting to make sure upper and lower guides are installed properly. Upon completion of work the contractor will provide a written summary (Historical Record) of work performed.

2. Description of Contractor’s Tasks:

Task 1: Turn off the machine and disconnect power from the Ultra press and lock out.

Task 2: Inspect parts and verify that replacement parts match the machine’s specifications.

Task 3: Carefully detach the upper and lower metal cut guides.

Task 4: Install the new upper and lower metal cut guides and make sure they are torque to specification.

Task 5: Remove safety sensors for repair.

Task 6: Reinstall safety sensors and realign photo eyes.

Task 7: Remove LOTO and reconnect power and check for proper operation and adjust as needed for optimal performance.

Task 8: Provide a written summary (Historical Record) of work performed.

Statement of Work (S.O.W.)

DDOO Oklahoma - Field Service Repair of Contech Ultra Press

3. Certification and Acceptance:

Final acceptance of the attachment results will be by Lonnie Brooks or Broderick Hardrick – DDOO.

4. Project Management Approach:

N/A

5. Performance and/ or Delivery Schedule:

This period of performance is to last 15 days. Location of work is:

Defense Logistics Agency Defense Distribution Center, Oklahoma City Tinker Air Force Base, OK 73145-8000

6. Work location(s) and travel:

3420 D Ave. Building #1 Door 68

7. Government Furnished Property/Equipment:

N/A

8. Security Requirements:

Contractor shall comply with DDOO security requirements for on-site access for personnel and vehicles if necessary.

9. Period of Performance:

From the date of award through 30 days.