Tab 4 SOW.pdf
PDF 104 KB Posted
- Attached to
- Schneider Maintenance Contract Renewal 2024 Federal contract opportunity
- Solicitation number
- 80NSSC863600Q
About this file
This statement of work outlines maintenance and technical support requirements for Schneider Electric power monitoring systems at the National Aeronautics and Space Administration's National Center for Critical Information Processing and Storage facility. The scope of work includes six onsite maintenance visits, remote technical support, training subscriptions, and in-office support between April 2024 and April 2025. Respondents should provide pricing and delivery dates for engineering deliverables including an ESP plan, PSO support, training, and in-office support. Proposals are due by January 24, 2024, and all deliverables require approval by SAIC and NASA. Citizenship requirements and non-disclosure agreements will also apply to this contract work supporting critical electrical infrastructure at the NASA Stennis Space Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 7 Capability Statement SAM.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBCONTRACTOR
STATEMENT OF WORK (SOW)
FOR
Schneider Electric Maintenance and Technical Support
Date: January 24, 2024
1. Technical Scope
1.1 Overview
This Statement of Work (SOW) describes the scope and deliverables for Schneider to provide maintenance and technical support for our Schneider Electric Power Logic Supervisory Control and Data (SCADA) system and our Power Monitoring Expert system for the National Aeronautics and Space Administration (NASA) National Center for Critical Information Processing and Storage (NCCIPS) facility.
The scope of work includes onsite maintenance visits, remote technical support and training. These systems are critical to monitoring and data reporting of the electrical infrastructure throughout the NCCIPS campus.
This project will be accomplished through the services of an SAIC subcontractor to complete the deliverables with specified scope described in Section 1.2.
1.2 Engineering Deliverables
This section describes the deliverables required. The subcontractor’s response should include proposed pricing for the required deliverables and their proposed delivery dates. The response must have detailed explanation of cost with breakdown of estimated man hours and cost associated with labor, including providing the basis of these estimates. The following are the required deliverables:
Deliverables Quantity
ESP Plan Ultra 1 TOTAL
PSO Support 1 TOTAL
Onsite Maintenance Visits 6 Total
Deliverables Quantity
Training Subscription
1 Total
In office support 1 Total
The format of the response expected to this SOW is provided in Appendix A.
1.3 Non-Disclosure Requirements
This project will require the establishment and implementation of a Non-Disclosure Agreement (NDA) policy. All key subcontractor personnel will be required to sign NDA forms and abide by all NDA requirements.
This project will require all electronic and hardcopy documents used and developed by the subcontracted electrical engineer to be securely maintained. All drawings and other documents developed by the subcontracted electrical engineer must be labeled as “Sensitive But Unclassified.”
At the end of this contract, electronic copies of all drawings and documents delivered to or developed by the subcontracted electrical engineer are to be submitted to SAIC.
1.4 Assumptions
The following assumptions apply to this SOW:
All deliverables will be reviewed by SAIC subject matter experts.
All deliverables require SAIC and NASA approval.
1.5 Applicable Standards
The subcontractor will comply with all local, state and federal standards and adhere to generally accepted engineering standards and principles, and NCCIPS/NASA standards.
2. Period of Performance The subcontractor will provide a schedule of the proposed delivery date for each deliverable. This schedule will be reviewed and approved by SAIC.
The period of performance of this SOW is from the award of the engineering contract through completion of all work as described.
This maintenance contract will be effective 04/25/2024 through 04/24/2025.
3. Security United States citizenship is required to gain access into the NASA Stennis Space Center and into the NCCIPS data center. Proof of citizenship will be required to be presented for on-site work that requires entry into Zone A.
Appendix D – Acronyms and Abbreviations
ACRONYM/ ABBREVIATION DEFINITION
NASA National Aeronautics and Space Administration
NDA Non-Disclosure Agreement
NCCIPS National Center for Critical Information Processing and Storage
SCADA Supervisory Control and Data Acquistion
SOW Statement Of Work
SSC Stennis Space Center
UPS Uninterruptible Power Supply