Synopsis.docx
DOCX document 32 KB Posted
- Attached to
- LAN Relocation & Communications Cabling Installations- Coburn Gore LPOE, Maine Federal contract opportunity
- Solicitation number
- 47PB0220R0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 47PB0220R0007 Solicitation Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Service Administration
R1.PBS.1PSK
MC Smith FBCH 202 Harlow Street Bangor, Maine 04401
PROJECT SYNOPSIS
| RE: | N1899825 Coburn Gore LPOE ME (ePM 57858) | |
| LAN Relocation and Communications Cabling Installation | ||
| ME0551BE Coburn Gore LPOE ME | ||
| Coburn Gore, Franklin County, Maine |
Synopsis:
The Work consists of relocation Local Area Network (LAN) hardware from (2) existing approximately 4’ high racks, with one rack being on the first floor, and the other rack being in the basement, to a designated location on the second floor. In addition, the Work will involve the installation of new communications Cat 6 cabling for computers and phone system data use to be run in metal raceway as specified. The Work will involve removal of any old cabling to be discontinued, and minor patching of existing plaster/gypsum wall and wood trim surfaces and new finish touch-up painting to match. Specific to the designated new LAN Room the Work will include new hollow-metal door and frame, lockset, HVAC split system for space conditioning, electrical requirements for the LAN Room as specified, static dissipative flooring, and a lighting fixture.
Existing fire suppression and fire alarm devicing will have no new Work.
The Work will have administrative requirements such as security requirements for workforce personnel, project management, and other as indicated in the Summary of Work.
The worksite is listed on the National Register of Historic Places and new Work will need to consider this.
The LAN Room will serve as the primary main distribution frame (MDF) or main distribution room (MDR) for the communications system (data, voice, and fax). Provide deliverables for the new LAN Room as stated in the Scope in the Summary. New (2)-4’ high LAN racks will be provided as specified in the Summary for the new LAN Room. Install new electrical, lighting, and HVAC as specified in the Summary. Install plywood and SDT (static dissipative flooring tile) as specified in the Summary.
Install Cat6 communications cabling and metal raceway as specified in the Summary in the quantity and locations as indicated on the drawings. Remove discontinued cabling that has been replaced with new. Patch and touch-up paint plaster, gypsum, and wood surfaces to match adjacent surfaces. Provide testing of new Cat6 cabling as specified in the Summary. Provide closeout documents as specified in the Summary as part of the deliverables.
file: H_construction projects_ePM 57858 Coburn Gore LPOE ME LAN Relocation + communication cabling - Synopsis (7.22.2020)