Kizad_-_Warehouse_A-02_Contractor_BOQ.pdf
PDF 826 KB Posted
- Attached to
- KIZAD Warehouse Construction Services Federal contract opportunity
- Solicitation number
- STC10017R0004
- Issued by
- Department of State US Embassy Abu Dhabi
About this file
Bill of Quantities (BOQ)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| As_Built_-_Steel_1.zip | ZIP file | |
| A-108 | — | |
| A-401 | — | |
| A-601 | — | |
| A-407 | — | |
| A-108 | — | |
| A-403 SERVICE BUILDING-2-R2-A-403-A1.pdf | ||
| A-201 | — | |
| A-401 STAIRCASE DETAILS-R2-A-401-A1.pdf | ||
| A-404 | — | |
| A-301 | — | |
| A-104 | — | |
| A-105 | — | |
| A-107 | — | |
| A-406 | — | |
| A-107 | — | |
| A-105 | — | |
| A-103 | — | |
| A-405 | — | |
| A-103 | — | |
| A-602 | — | |
| A-108 | — | |
| A-104 | — | |
| A-102 | — | |
| A-101 | — | |
| A-301 | — | |
| A-106 | — | |
| A-201 ELEVATIONS-R2-A-201-A1.pdf | ||
| A-403 SERVICE BUILDING-2-R2-A-403-A1.pdf | ||
| A-105 | — | |
| A-107 | — | |
| A-003 | — | |
| A-105 | — | |
| A-103 | — | |
| A-407 | — | |
| A-105 | — | |
| A-201 | — | |
| A-104 | — | |
| A-106 | — | |
| A-403 | — | |
| A-001 | — | |
| A-301 SECTIONS-R2-A-301-A1.pdf | ||
| A-101 | — | |
| A-105 | — | |
| As_Built_Drawing_-_MEP.zip | ZIP file | |
| As_Built_Drawing_-_Structural.zip | ZIP file | |
| Municipality_Approved_Drawings.pdf | ||
| Municipality_Approved_Drawings.pdf | ||
| Warranty_and_Forms.pdf | ||
| Synopsis_FBO_Kizad_Fit-out.pdf |
Show all 50
KIZAD Warehouse Construction Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUDINGINTRAESA MIDDLE EAST AND GULF
KIZAD FITOUT PROJECT - US EMBASSY WAREHOUSE
SEP - 10 - 2016
BILL OF QUANTITIES - DRAFT COPY
Warehouse A002
KIZAD FIT-OUT AT US EMBASSY WAREHOUSE A002 BILL NO. PAGE NO.
1 1/3
ITEM DESCRIPTION QTY. UNIT
SECTION A - GENERAL REQUIREMENTS
A Prepare shop drawings before work execution
- Item -
B Temperory Signboards - Item -
C
Insurances including 3rd party insurance that will maintain the US Embassy and Local standards - Item -
D Power hand tools and scaffoldings - Item -
E Protection of existing finishes - Item -
F As built drawings and operation & Maintenance manual - Item -
G Transportation for the personnel, materials and equipment - Item -
H Site cleaning during and after completion of works - Item -
I Mobilization / Demobilization - Item -
J Site office / Establishment (If Required) - Item -
K Provision of performance bond - Item -
L US Embassy Temp. Staff office and facilities including - Item -pantry and general office.
Allow for furniture, etc.
Allow for cleaning during the progress of the works and for removal on completion. (If
Required)
Carried To Collection
BILL OF
QUANTITIES
GENERAL
REQUIREMENTS
ITEM
REF.
UNIT RATE
TOTAL PRICE
(AED)
1 2/3
ADDITIONAL ITEMS
The tender is to attach with this bill of quantities any addition items with quantities enumerated or itemized and rates which are not previously included to complete the build up of lump sum price. Should the tenderer's fail to insert any items here, it will be deemed that his lump sum price for the tenders includes all items either shown on the drawings and described in the specification or deemed necessary by the tenderer to develop the drawings and specification to represent the entire cost of the works and no subsequent claim for any additional item will be entertained.
Carried To Collection
BILL OF
QUANTITIES
GENERAL
REQUIREMENTS
ITEM
REF.
UNIT RATE
1 3/3
Collection
A Amount of Page 1/3 - Item -
B Amount of Page 2/3 - Item -
Bill No. 1 - Total Carried To Summary
BILL OF
QUANTITIES
GENERAL
REQUIREMENTS
ITEM
REF.
UNIT RATE
PROVISION OF FIT-OUT WORKS BILL NO. PAGE NO.
KIZAD FIT-OUT AT US EMBASSY WAREHOUSE A002
2 1/16
SECTION B - DEMOLITION
Note: The Contractor is specifically requested to visit the US Embassy warehouse at KIZAD and ascertain for himself the items of demolition described hereunder before pricing this section.
WALLS
Form an opening in the existing gypsum wall located on the Mezzanine floor, cart away and disposal of the remaining waste.
A Two Wall Openings with the dimension of (1800 x 200) shown in the demolition plan drawing (A104) 8.3 m2
B Concrete Frame opening for HVAC duct system 4.0
Note: All Windows are owned by KIZAD.
Carefully remove existing internal window including frame and set aside as directed.
C Remove Window located on the Mezzanine floor with dimensions of (2800 x 200) according to drawing (A104)
1.0 Item
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
TOTAL PRICE
WINDOWS
2 2/16
SECTION C - CONCRETE WALL
Filling and back filling for package system foundation.
Supply and installation of concrete foundation including steel reinforcement, and framework.
A Foundation for packaging system 2.2 m3
B Concrete Frame for HVAC duct system 4.0 No.
Carried To Collection
ITEM
REF.
UNIT RATE
TOTAL PRICE
(AED)
QUANTITIES
2 3/16
SECTION D - METAL WORKS
WALLS
Internal wall partition to segregate the storage rooms from the break room. Fire rating and acoustic requirements, as per spec and drawings.
A Supply and Installation of Internal Wall Partition as per (A101) - Wall type ( GPS-60R-DOS-02) 18.8 m2
B Supply and Installation of Steel Wall Cladding as per specs requirement (A101) - Wall Update (GPK-
15R-DOS-02)
23.6 m2
LOUVERS SYSTEM
The Louvers should be installed on the external façade of the rear elevation as per drawing (A301) and as per KIZAD Tenant guide.
C Supply and Installation of Aluminum Louvers 30.0 m2
FE Grille
Fe Grille should be installed on mezzanine floor external windows, HVAC duct opening in the external wall area and ground floor main entrance door area.
Supply and Installation of FE Grille 57.0 m2
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 4/16
SECTION E - GYPSUM WORKS
WALLS
Providing and fixing 8 meters height partitions ofoverall thickness of 100 mm using gypsum board to cover up any exposed piping.
A Supply and Installation of all Gypsum Wall
Partition. 24.2 m2
Gypsum Wall Cladding should be integrated on the surface of the walls and new partitions in the break room as shown in the drawings.
B Supply and Installation of all gypsum Wall Cladding
34.9 m2
CEILING
Providing & fixing in position false ceiling in
Gypboard 12mm thick s fixed as per specs. including access panels for service access.
C Supply and Installation of a Gypsum Ceiling for
Break Room
9.0 m2
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 5/16
SECTION H - DOORS AND WINDOWS
INTERNAL DOORS
Note: Treat door assemblies as fragile merchandise.
Delivery of the assembly to project site with fabrication, finishing, and assembly of primary panels, sub-frames and frames as per specs.
Fire rating and acoustic requirements, as per spec and drawings.
A
Supply and Installation of Steel Door (DC01) as per drawing (A101) Door Type -(DOS 2123) as per
Specs provided.
1.0 Item
B
Supply and Installation of 8MIL Shatter Resistant
Window Film on Protected Side as per specification
48.0 m2
C Supply and installation of Padlock as per details and specification for Rolling shutter 4.0 Nos
D Supply and installation of Padlock as per details and specification for Louver Door
1.0 Nos
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 6/16
ITEM DESCRIPTION QTY. UNIT
SECTION J - FINISHING
WALL FINISHES
Supply and installation, including all necessary provisions for fixtures and accessories and finishes schedule and specifications
WHITE PAINT
Wall paint on all exposed brick walls and gypsum walls.
A Antibacterial White paint 1170.6 m2
EPOXY
Epoxy finishes to be included in package unit
B Epoxy paint for foundation 7.9 m2
C Epoxy skirting for break room 11.4 lm
ACCESSORY FINISHES
D Forklift parking marking 5.8 lm
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 7/16
SECTION M - FURNISHINGS
Providing and fixing 18mm thick MDF Veneer Desk including joinery and all necessary fastening and accessories required to complete the installation as shown on drawings and specifications.
A Workstation Desk Item
RESERVED
B Roller Blinds 39.1 m2
Supply and install an office chair with revolving base, pneumatic height, back adjustment and arm.
C Medium back chair Item
RESERVED
D Waiting Chair Item
RESERVED
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 8/16
SECTION N - MEP
Air Conditioning Installation
Supply and installtion of Outdoor and Indoor air conditioning unit capacity complete with all interconnecting refrigerant pipe work including cables , isolators as per specification & drawings
(AC101 - AC104)
A 1 TR Wall mounted split units with indoor and outdoor machines including refrigerent pipes 1.0 no
B 3 TR Wall mounted Split Units With Indoor and outdoor machines including refrigerent pipes 2.0 no
C 1.5 TR Wall mounted split units with indoor and outdoor machines including refrigerent pipes. 1.0 no
D 20.275 TR Package Unit 1 1.0 no
E 20.275 TR Package Unit 2 1.0 no
F Duct Works (Supply , Return & Fresh )as per
SMACNA and Insulation 1.0 LS
G Air Outlets , Grilles ,Volume Control Damper 1.0 LS
H Drainage for AC units 1.0 LS
I Cladding to outdoor ducts 1.0 LS
J Welding works for AC system 1.0 LS
K Wall Mounted Industrial Exhaust Fan, Model
40KQT, KDK Japan
1.0 no
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 9/16
A Allow for all protective and decorative painting, as specified
1.0 Item
B Allow for identification labels,. plates, charts and identification of plant, equipment, pipe work, controls and the like
1.0 Item
C Allow for earthing to all items of pipe work, ductwork, control panels, and air-conditioning and ventilation equipment and the like
1.0 Item
D Allow for coordinating with all other engineering installations including employer's direct contractors
1.0 Item
E Allow for providing documents, operating instructions and maintenance manuals, as specified
1.0 Item
G Allow for HPUPVC Condensate drain pipes including all insulation, CE, U traps, Supports & AC
Drain pits As per drawings & Specifications.
1.0 Item
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 10/16
SECTION O - FIRE FIGHTING
A Relocation of existing sprinklers accoring to the layout (If Required) 1.0 LOT
B Items not listed above but necessary for successful completion of the project and for Civil defense approval.
(Bidders Should provide detailed breakdown)
1.0 LOT
Carried To Collection
TOTAL PRICE
(AED)
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 12/16
SECTION Q - PLUMBING
A Emergency Eye wash Unit including all other accessories. 1.0 No.
B Potable water supply to Eye wash unit as shown in the drawings 1.0 LOT
C Condensate Drainage Pipes and fitting including soak pits as shown in the drawings 1.0 LOT
D Insulation of condensate drainage pipes with elastomeric flexible type covered with canvas cloth and anti fungus vapor barrier. 1.0 LOT
E Items not listed above but necessary for successful completion of the project related to plumbing trade.
(Bidders Should provide detailed breakdown)
1.0 LOT
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 13/16
SECTION R - LIGHTING
Supply, install and, test of lighting fixtures as described below, including all necessary accessories required to provide and install all LED Lights as per drawings and specs (ELE-L-101)
A
150 w LED High Bay located in the main area as per drawing 23.0 Item
B LED Light 32.0 Item
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 14/16
SECTION S -ELECTRICAL
Provide and install the complete electrical installation strictly in accordance with the specification and as indicated on drawings and all builder's work as, but not limited to the following items:
A 13A Twin Switch Socket Outlet
24.0 Item
B 16A 1PH Industrial Power Socket
2.0 Item
C 32A 3PH Industrial Power Socket 1.0 Item
D 20A DP Switch with Neom indicator for F.C.U
4.0 Item
E TP Isolator for AC package units 2.0 Item
Additional electrical power for UPS is required as a battery backup for ventillation, AC, and lighting system within the break room.
F Supply and install a UPS (Uninterrupted Power
Supply) within the CES as per drawings and specs.
1.0 Item
G Provide a 3 phase, 415 /240 V with 60 amps MCB and CB is required.
Carried To Collection
ITEM
REF.
UNIT RATE
TOTAL PRICE
(AED)
QUANTITIES
2 11/16
SECTION P - FIRE ALARM
RELOCATE
A Relocation of Intelligent Optical Smoke Detector with Standard Base 16.0 Item
B Relocation of 1x8 W Emergency Light non maintained self-contained
16.0 Item
SUPPLY AND INSTALL
C
Supply and Installation of Intelligent Optical
Smoke Detector with Standard Base 8.0 Item
D Supply and Installation of 1x8 W Emergency Light non maintained self-contained
7.0 Item
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
2 15/16
SECTION T - TELEPHONE/ ACCESSORIES
PUBLIC ADDRESS AND MUSIC SYSTEM
Supply, install public address system as specified and shown on drawings including all raceways,conduits ,boxes and accessories
(independent from any other LOW CURRENT system)
Co-ordination and interfacing with all systems as specified & shown on the drawings.
Integration with the public address system in the project
A Ceiling Speaker 1 Item
B PA Panel 1 Item
C Volume Control 1 Item
D Microphone 1 Item
System wiring through CAT-6A cables for distribution including all connection and accessories as specified, as shown on drawings
RJ-45 socket outlet including conduits, accessories, draw boxes & the like for internal main distribution etc…
E Voice & DATA outlet (in wall). 9 Item
Carried To Collection
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
TOTAL PRICE
(AED)
STRUCTURED CABLE SYSTEM Data & Voice(As per ETIC
PJSC) regulation.
2 16/16
Collection
A Amount of Page 1/16 Item
B Amount of Page 2/16 Item
C Amount of Page 3/16 Item
D Amount of Page 4/16 Item
E Amount of Page 5/16 Item
F Amount of Page 6/16 Item
G Amount of Page 7/16 Item
H Amount of Page 8/16 Item
J Amount of Page 9/16 Item
K Amount of Page 10/16 Item
L Amount of Page 11/16 Item
M Amount of Page 12/16 Item
N Amount of Page 13/16 Item
P Amount of Page 14/16 Item
Q Amount of Page 15/16 Item
R Amount of Page 16/16 Item
Bill No. 1 - Total Carried To Summary
TOTAL PRICE
(AED)
BILL OF
QUANTITIES
ITEM
REF.
UNIT RATE
| Kizad - Warehouse A-02 Contractor BOQ_Cover_Main |
| Kizad - Warehouse A-02 Contractor BOQ_Bill |
| Kizad - Warehouse A-02 Contractor BOQ_Civil |
File details come from the government source that posted it. Updated .