Statement of Work - USCGC MAKO FY20 DOCKSIDE 70Z080-20-Q-P45A5100.pdf

PDF 2 MB Posted

Attached to
USCGC MAKO FY20 DOCKSIDE Federal contract opportunity
Solicitation number
70Z080-20-Q-P45A5100
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to USCGC MAKO FY20 DOCKSIDE, newest first.
File Type Posted
Schedule of Services - USCGC MAKO FY20 DOCKSIDE.xlsx XLSX spreadsheet
Combined Synopsis Solicitation -USCGC MAKO FY20 DS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MAKO (WPB 87303)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2020

Developed By: Ryan S Hopkins

(Rev-0, 30 January 2020)

USCGC MAKO (WPB-87) DOCKSIDE AVAILABILITY FY2020

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 1: Grey Water Holding Tank(s), Clean and Inspect WORK ITEM 2: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 3: Grey Water Piping, Clean And Flush WORK ITEM 4: Sewage Piping, Clean And Flush WORK ITEM 5: Foundation, Boat Winch, Modify WORK ITEM 6: HVAC 2-Stage Intake Separator, Modify

WORK ITEM 7: MOTOR CONTROLLER, INSTALL

WORK ITEM 8: Mooring Bits, Renew (EC 087-B-037) WORK ITEM 9: Watertight Closure, Renew WORK ITEM 10: Silencer, Exhaust, Renew WORK ITEM 11: Exhaust Ring, Main Diesel Engine, Repair WORK ITEM 12: Mounting Studs, Forepeak, Renew WORK ITEM 13: Pilothouse-to-Mast Multi-Cable Transit, Renew WORK ITEM 14: Ship Service Diesel Generator Sets (SSDG’s), Replace WORK ITEM 15: Fire Alarm Control Panel, Replace iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads

Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan

Coast Guard Drawing 87 WPB 151-001, Rev L, Superstructure Details

Coast Guard Drawing 87 WPB 167-002, Rev C, CG Schedule of Doors, Manholes, Windows & Hatches

Coast Guard Drawing 87 WPB 167-004, Rev H, W.T. Doors and Hatches

Coast Guard Drawing 87 WPB 182-001, Rev C, Main Engine and Generator Foundation

Coast Guard Drawing 87 WPB 185-001, Rev AN, Auxiliary Foundation Booklet

Coast Guard Drawing 87 WPB 201-001, Rev F, Machinery Arrangement

Coast Guard Drawing 87 WPB 233-001, Rev A, Remote Emergency Shutdowns

Coast Guard Drawing 87 WPB 252-002, Rev P, Alarm & Monitoring System

Coast Guard Drawing 87 WPB 256-001, Rev AC, Sea Water Cooling Piping

Coast Guard Drawing 87 WPB 259-001, Rev J, Engine Exhaust Piping

Coast Guard Drawing 87 WPB 259-002, Rev C, Prpln Eng/SSDG Exh Pp – Insulation Mods

Coast Guard Drawing 87 WPB 261-001, Rev L, Fuel Oil Service Piping

Coast Guard Drawing 87 WPB 261-003, Rev -, Fuel Oil System Mods Incidental to John Deere SSDG

Installation

Coast Guard Drawing 87 WPB 302-001, Rev W, Misc. Controls Wiring Diagram

Coast Guard Drawing 87 WPB 304-001, Rev C, Wireways Arrangement

Coast Guard Drawing 87 WPB 304-002, Rev A, Wireway Penetration Details

Coast Guard Drawing 87 WPB 304-003, Rev -, Multi-Cable Transit (MCT) Riser Box

Coast Guard Drawing 87 WPB 310-001, Rev J, Ship’s Service One-Line Diagram

Coast Guard Drawing 87 WPB 310-010, Rev-, Powergen Wiring SSDG

Coast Guard Drawing 87 WPB 310-011, Rev-, Powergen One Line SSDG, One Line

Coast Guard Drawing 87 WPB 310-012, Rev A, Powergen Schematic SSDG, Electrical Elementaries

Coast Guard Drawing 87 WPB 310-013, Rev-, Powergen Communications SSDG

Coast Guard Drawing 87 WPB 310-014, Rev A, Powergen Interconnection, SSDG

Coast Guard Drawing 87 WPB 313-001, Rev N, DC System

Coast Guard Drawing 87 WPB 324-001, Rev B, Switchboard Wiring Diagram & Details (Hulls 1-12)

Coast Guard Drawing 87 WPB 324-002, Rev C, Switchboard Wiring Diagram & Details (Hulls 13-On) v (Rev-0)

Coast Guard Drawing 87 WPB 324-003, Rev B, Switchboard Wiring Diagram & Details (Hulls 52 & On)

Coast Guard Drawing 87 WPB 436-001, Rev E, Fire Detection System

Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping Systems

Coast Guard Drawing 87 WPB 514-004, Rev -, Mods to HVAC Intake Duct

Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping

Coast Guard Drawing 87 WPB 582-001, Rev J, Mooring and Towing

Coast Guard Drawing 87 WPB 583-001, Rev W, RIB Deployment Structure

Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation

Coast Guard Drawing 87 WPB 640-001, Rev N, Interior Furnishings

COAST GUARD PUBLICATIONS

Welding and Allied Processes

Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual

Coast Guard Technical Publication (TP) 4507, Apr 2019, SWBS 311, Ship’s Service Diesel Engine

Generator Operation and Maintenance Manual

Coast Guard Technical Publication (TP) 4540, SWBS 514, March 2003, Pump, Chilled Water- Model

KC2

Coast Guard Technical Publication (TP) 4542, SWBS 264, March 2003, Pump, Lube Oil Evacuation-

Model 01SS1PTYDJHLW

Coast Guard Technical Publication (TP) 4570, SWBS 593, March 2003, Pump, Waste Oil

Coast Guard Technical Publication (TP) 4988, SWBS 513, June 2011, Ventilation Fan, Engine Room

Circulating-Model YM-18

Coast Guard Technical Publication (TP) 9051, SWBS 436, Mar 2016, Fire Alarm Control Panel NFS-

320/E/C & LCD2-80, Multiple Class Cutters

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041) 2014, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard

Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042) 2014, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, And Installation

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary

Services vi (Rev-0)

OTHER REFERENCES

American Bureau of Shipping (ABS), Steel Vessels Under 90 Meters in Length, Part 4, Vessel System and Machinery, Chapter 6 Electrical Installations, Feb 2015

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

Description of System Operations (DOSO)

Institute of Electrical and Electronic Engineers IEEE STD 45, Recommended Practice for Electrical

Installations on Shipboard, April 9, 2004

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe

Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

7 N Controller with Power

Supply

NSN: 6110-01-F17-5287 PN:

ECN05A8QAA-

R63/BP18Z90E3P67P68S6-N12

1 ea. $540.18

7 N Controller with Power

Supply

NSN: 6110-01-F17-5288 PN:

ECN05A8QBA-

R63/BP18Z90E4P67P68N-12

3 ea. $600.00

9 N Door, QAWT, 26”X54”R.H. (Main

Deck Office Access)

NSN: 2040-01-F14-3674 1 ea. 10,250.90

9 N Door, QAWT, 52” x

26” (Deck Locker

Access)

PN: BSI 1116383 CAGE:

0D5X4

1 ea. 5,000.00

10 N Silencer, 8”, Spark

Arresting, RH

PN: SRU08-X0612 1 ea. 10,000.00

10 N Sealant, Silkolene NSN: 8030-01-593-2919 2 ea. 142.29

10 N Soft Patch Sealing Kit NSN: 8040-01-601-2062 PN:

87SPK CPB-1 PATCH

1 ea 1122.56

10 N Clamp, V-Band, 8” NSN: 5340- 01-568-6899 PN:

024-007000

2 ea. 50.15

11 N **MDE Exhaust

Concentric Ring

NSN: 2990-01-537-5198 1 ea. 3,989.09

11 N Sealant, Silkolene NSN: 8030-01-593-2919 1 ea. 117.28

13 N Multi-Cable Transit

(MCT), Brattberg, with Removable End

PN: RGSO-4 ALU 1 ea 500.00

13 N Addblocks (4mm-

8mm Cable)

PN: 20/4-8 9 ea 20.00

13 N Addblocks (9mm-

13mm Cable)

PN: 20/9-13 6 ea 20.00

13 N Solid Blocks PN: 20/0 21 ea 20.00

13 N Stayplate, 120 mm SS PN: N/A 5 ea 20.00

13 N Endpacking PN: STG1SS 1 ea 30.00

14 Y Ship Service Diesel

Generator Set, Port

NSN: 2815-01-F13-3325 1 ea. 40,925.00

14 Y Ship Service Diesel

Generator Set, STBD

NSN: 2815-01-F18-5409 1 ea. 40,925.00

14 N Main Switchboard and

440 VAC Panels, includes 7-inch touch screen HMI

NSN: 6110-01-F17-5033 1 ea. 150,500.00

14 N SSDG Exhaust

Insulation Blanket, NSN: 2990-01-674-5103 1 ea. 1,485.00 viii (Rev-0)

Advanced Thermal

Products Inc, Marine

Wrap, Port

14 N SSDG Exhaust

Insulation Blanket, Advanced Thermal

Products Inc, Marine

Wrap, STBD

NSN: 2990-01-674-9188 1 ea. 1,495.00

14 N Repair Kit, Soft Patch

Kit

NSN: 8040-01-601-2062 2 ea. 1,028.19

14 N Clamp Synchro 8" NSN: 5340-01-568-6899 12 ea. 47.02

14 N Sealant Compound NSN: 8030-01-593-2919 4 ea. 117.28

14 N Clamp Synchro (12"

V-Band Clamp)

NSN: 5340-01-590-8152 6 ea. 55.24

14 N Clamp Synchro Turbo NSN: 5340-01-593-2913 4 ea. 277.18

14 N Clamp Synchro 4.5" NSN: 5340-01-593-2907 2 ea. 31.41

15 N Fire Alarm Control

Panel

NSN: 6320-01-F18-5529 1 ea. 2,185.00

15 N Battery, 12 Volt, 12

AH

NSN: 6140-01-529-4234 2 ea. 151.95

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter ix (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work

Item Title

This section is not applicable to this package.

x (Rev-0)

PRINCIPAL CHARACTERISTICS

87' WPB

PHYSICAL

Length overall 87'

Length between perpendiculars 81' 7"

Depth 10' 11"

Maximum beam 19.4'

Draft, mean to design waterline 5' 9"

Height of highest projection 50.2'

Full load displacement 93.5 long tons

Minimum operating displacement 83.9 long tons

Displacement, light ship 77.9 long tons

Framing Longitudinal

Bulkheads Four watertight bulkheads located below the Main Deck

Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

HULL

Hull/main weatherdeck material ABS Grade AH 36

Superstructure 5086 Aluminum

MACHINERY

Main propulsion Two MTU 8V396TE94, sequential turbo-charged diesels

Reduction gears Two ZF Type BW 255

Propulsion shaft Two AQUAMET 22, 101.6mm

Shaft diameter 4"

Shaft seal Two John Crane mechanical seals

Shaft bearing, intermediate Thordon Elastomeric Bearing

Shaft bearing, aft Thordon Elastomeric Bearing

Number of propellers 2

Number of blades 5

Diameter of propeller 1040mm

Pitch 1230 mm fixed

Shaft RPM 828

Rudders Two 316L Stainless Steel

Ship's service generators Two Man Model D08241F01 diesel with Stanford 60KW Generator

TANK CAPACITIES

3-9-1-f (fuel oil) 1402 gal

3-9-2-f (fuel oil) 1402 gal

3-12-2-f (waste oil) 86 gal

3-12-1-f (oily water) 86 gal

3-7-0-q (sewage collection) 352 gal

3-7-1-q (grey water) 52 gal

3-12-1-w (fresh water) 200 gal

3-12-2-w (fresh water) 200 gal

1 (Rev-0)

00000_0618_FLT

REC_00000_FLT_ISC Project (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by and at an ISC for Coast Guard vessels.

Contractor

Name

Work to be

Performed

Spaces

Effected

Period of

Performance

Resources

Requested of

Prime

POCs

CG Yard SINSII Install Pilot House, Mast

24 AUG – 28

AUG 2020

Power to energize Pilot

House systems

(Day 1, 4, 5).

CWO

Keith

Jarvis

These dates are provided below and attached from CWO

Jarvis.

24 Aug -28

Aug 2020

Power is required on day

1, 4 and 5 of the project

(typically

Monday/

Thursday/Friday

(8/24, 8/27-28)

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

2 (Rev-0)

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3 (Rev-0)

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is small quantity.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

4 (Rev-0)

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. The ISC shall be considered the generator of all hazardous wastes, and shall manage hazardous wastes in accordance with its management plans, policies, and instructions. Handle all hazardous wastes generated during the execution of this contract in accordance with all Federal, state, and local regulations.

Notify the ship’s hazardous waste coordinator prior to any transfers of hazardous wastes from ship to shore.

3.5.6 ISC Contractors. ISC Contractors shall comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-3A - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3B - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading

(mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge Is

Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

59301_1019_FLT

REC_59301_FLT_87’ WPB (ALL) (1017)

WORK ITEM 1: Grey Water Holding Tank(s), Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TABLE 1 – TANKS

TYPE OF TANK LOCATION CAPACITY - 95% (gallons) LOW SUCTION (Gallons)

Grey Water (stainless steel, uncoated)

Below Hold Deck between Frames 8 and 9, 3-7-1-W

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

12 (Rev-0)

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Plug all inlet and outlet piping in the tank(s) to prevent contaminants from entering. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings.

Maintain a plug accountability log outside the tank to prevent any of the installed temporary plugs from being lost inside the tank or forgotten inside at tank closure. Submit this log to the Coast Guard Inspector after completion of work item.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Piping.

Pump(s).

Stateroom berthing locker.

Toilet (to be removed by CG personnel).

Speed log.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.3 Service disruption. When grey water is disrupted due to Contractor repairs, the Contractor shall refer to SFLC Standard Spec 0000 par 3.2.11 to provide required temporary facilities.

3.4 Cleaning. The Contractor shall accomplish the following for the tank(s) listed. The Contractor shall refer to Coast Guard Drawing 87 WPB 601-001 for guidance.

3.4.1 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations

3.4.2 Cleaning requirements. Remove manhole cover(s). Clean all tank structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths.

Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all

Federal, state, and local regulations. Clean all tank vent lines. Remove and clean the eductors and level

13 (Rev-0) switches inside of the tank(s). Reinstall the eductors and level switches upon completion of tank cleaning.

Use new gaskets and o-rings to install/reinstall all removed/disturbed components.

3.5 Inspection. The Contractor shall visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit the Tank and Void Inspection Form, and a CFR including the following, as applicable:

Tank structural condition.

Inaccessible areas.

Condition of tank coating, including measurements taken, percentage, location, and type of coating failure (not applicable for stainless steel tanks).

Tank level indicator (TLI), vacuum and/or float switch condition.

Suction and discharge piping and vent line condition.

Fastener material (stainless steel) and condition.

Zinc anode condition (remaining percentage).

3.6 Control Panel Assembly. The Contractor shall open and vacuum clean the control panel assembly.

Inspect the control panel assembly for any indications of overheating or loose wiring or connections.

Submit a CFR

3.7 Closing. The Contractor shall notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330.

3.7.1 Renew 100% of nylon insert/nylock nuts and washers.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.8 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.8.1 The Contractor shall adjust the set point on each of the vacuum pressure switches (as applicable) to the set points noted previously.

3.8.2 The Contractor shall verify operation of the low and high level switches/alarms and that the pumps cycle from lead to lag status during operation. Demonstrate proper operation of tank TLIs to prove satisfactory operating condition.

3.8.3 Upon completion of testing and, in the presence of the Coast Guard Inspector, the Contractor shall pump tank(s) to the limit of the ship’s installed pumps.

4. NOTES

This section is not applicable to this work item.

14 (Rev-0)

59302_ESD _1019_FLT

REC_59301_FLT_87’ WPB (ALL) (1017)

WORK ITEM 2: Sewage Holding Tank(s), Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TABLE 1 – TANKS

TYPE OF TANK LOCATION CAPACITY - 95% (gallons) LOW SUCTION (Gallons)

Sewage (stainless steel, uncoated) Hold Deck between Frames 6 and 8, 3-7-0-W 363

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 601-001, Rev R, Outboard Profile & General Arrangements

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General.

15 (Rev-0)

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.1 Plug all inlet and outlet piping in the tank(s) to prevent contaminants from entering. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Piping.

Pump(s).

Stateroom berthing locker.

Toilet (to be removed by CG personnel).

Speed log.

3.1.5 Plug log. The Contractor shall keep a written record of all plugs put in any tank vents. A separate list shall be kept for each tank being entered.

3.1.5.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.1.5.2 The plug log shall be available to the Coast Guard Inspector when the inspector is performing his close-out inspection on each tank.

3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an operational pre-test to demonstrate all tank TLIs' existing operational condition.

Submit a CFR.

3.3 Service disruption. When sewage collection service is disrupted due to contractor repairs, the

Contractor shall refer to SFLC Standard Spec 0000 par 3.2.11 to provide required temporary facilities.

3.4 Cleaning and inspection requirements. The Contractor shall accomplish the following for the tank(s) listed in paragraph 1.1 (Intent), referring to Coast Guard Drawing 87 WPB 601-001 for guidance:

3.4.1 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations

3.4.2 Cleaning requirements. Remove manhole cover(s). Clean all tank structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths.

Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all

Federal, state, and local regulations. Clean all tank vent lines. Remove and clean the eductors and level

16 (Rev-0) switches inside of the tank(s). Reinstall the eductors and level switches upon completion of tank cleaning.

Use new gaskets and o-rings to install/reinstall all removed/disturbed components.

3.4.3 Inspection. Visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.

Submit a CFR including the following, as applicable:

Tank structural condition.

Inaccessible areas.

Condition of tank coating, including measurements, percentage, location, and type of coating failure (not applicable for stainless steel tanks).

Tank level indicator (TLI), vacuum and/or float switch condition.

Suction and discharge piping and vent line condition.

Fastener material (stainless steel) and condition.

Zinc anode condition (remaining percentage).

3.4.4 Control panel assembly. Open and vacuum clean the control panel assembly. Inspect the control panel assembly for any indications of overheating or loose wiring or connections. Submit a CFR

3.5 Closing. The Contractor shall notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330.

3.5.1 The Contractor shall renew 100% of nylon insert/nylock nuts and washers.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.6 Operational test, post repairs. After completion of work, the Contractor shall accomplish the following in the presence of the Coast Guard Inspector, and submit a CFR:

3.6.1 Adjust the set point on each of the vacuum pressure switches (as applicable) to the set points noted previously.

3.6.2 Verify operation of the low and high level switches/alarms and that the pumps cycle from lead to lag status during operation. Demonstrate proper operation of tank TLIs to prove satisfactory operating condition.

3.6.3 Upon completion of testing and, in the presence of the Coast Guard Inspector, pump tank(s) to the limit of the ship’s installed pumps.

17 (Rev-0)

59320_0618_FLT

REC_59320_FLT_87’ WPB (ALL) (0318)

WORK ITEM 3: Grey Water Piping, Clean And Flush

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the grey water piping system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping

Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective

18 (Rev-0) measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Grey water pumps

Valves

3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.

3.3 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and handling the chemicals. For each operator/cleaning technician, submit documentation of applicable experience and training obtained within the last twelve months along with the Cleaning Plan (see paragraph 3.5.2 (Plan Submittal)).

3.4 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.5 Piping hydrojet cleaning. The Contractor shall perform the following work:

3.5.1 The Contractor shall clean and flush the entire grey water system piping (including condensate drain lines), shown on Coast Guard Drawing 87 WPB 526-001 and 87 WPB 593-001.

3.5.2 Prior to commencing work, coordinate with the Coast Guard Inspector. Determine required down times for affected piping system. Determine the feasibility/need for the piping system to be split to minimize system down time.

3.5.3 With the aid of ship’s force, split the plumbing drain system fore and aft by closing isolation valves in the drainage system. Work on only one section of the plumbing drain system at a time to allow use of toilet and shower facilities in the other section of the system by the ship’s duty section.

3.5.4 Using the referenced Coast Guard drawings as guidance, hydro blast the internal surfaces of all of the plumbing drain piping. Hydro blast pressure shall be at least 2500 psig at the discharge nozzle in all piping to ensure removal of all salts and scale from piping internal surfaces.

3.5.4.1 Ship’s force will provide an assistant to the Contractor to show the Contractor the location of clean-out connections within the plumbing drain system.

3.5.4.2 Open each of the clean out connections as required to clean and hydro blast all of the internal piping within the system. Catch any fluid that drains from the clean out connections when it is opened and clean up any spills using bleach to disinfect the spill after cleaning.

3.5.4.3 It may be necessary for the Contractor to install additional clean-out connections to access all portions of the plumbing drain system. If additional clean-out connections are needed, a separate specification item in this specification package shall be authorized to install additional clean-out connections.

19 (Rev-0)

3.5.4.4 Hydro blast cleaning water may be collected in the ship’s sewage system and disposed of via the ship’s sewage shore tie connections.

3.5.5 Clean until all of the following conditions are met:

All visible calcium carbonate deposits, solid deposits and build-up are removed from pipe walls.

Discharge water from the piping being cleaned is free of all visible scale and deposits.

3.5.5.1 Inspect the piping interior using a borescope in the presence of the COR, to verify that all solid deposits visible to the unmagnified eye have been removed. Continue the cleaning process until all visible solid deposits are removed from the pipe walls.

3.5.6.2 Chemical cleaning waste water disposal. Dispose of all cleaning fluids and debris in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item. Do not drain any fluids (including fresh water) into any space, bilge, or exterior location.

Sequence of each location that ensures all piping sections will be cleaned and all foreign debris removed.

3.6 Pumps and valves. The Contractor shall replace system tank valve(s) with temporary spool piece(s).

Visually inspect system pumps and valve(s); and submit a CFR. Upon completion of work, reinstall the removed tank valve(s) with new gaskets.

3.7 Gasket renewal. The Contractor shall reinstall all removed valves and fittings with new gasket material conforming to applicable referenced drawings.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.8 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.8.1 Leak test. After all system components are reinstalled, the Contractor shall test all disturbed piping for leaks, as follows, and submit a CFR:

Plug all system openings (except the highest) and fill system with water to the point of overflow. Ensure that the water level does not go down (without adding any water) for sufficient time to inspect the entire system (no less than 15 minutes).

Closely monitor the system for leaks. Repair all leaks detected.

Repeat test and inspection until no leaks are detected.

20 (Rev-0)

59321_1118_FLT

REC_59320_FLT_87’ WPB (ALL) (0318)

WORK ITEM 4: Sewage Piping, Clean And Flush

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the sewage piping system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 526-001, Rev J, Scuppers & Deck Drains Piping

Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1.1 CIR.

None.

21 (Rev-0)

3.1.3 Protective measures. The and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Sewage pumps

Toilets

Valves

3.2 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.

3.3 Personnel qualification. The Contractor shall ensure that personnel accomplishing this work are qualified and experienced in operating the pressurized water system and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .