Statement of Work_RB-M Insulation Renewal.docx
DOCX document 32 KB Posted
- Attached to
- Insulation renewal on Coast Guard Medium Response Boat Federal contract opportunity
- Solicitation number
- 70Z028-21-Q-3HB20000
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DOL Wage Determination Miami Dade County.pdf | ||
| 52.212-4.docx | DOCX document | |
| 52.212-3.docx | DOCX document | |
| 52.212-1.docx | DOCX document | |
| 52.212-5.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/SPECIFICATION/WORK STATEMENT
FOR INSULATION RENEWAL ON RESPONSE BOAT - MEDIUM
Work Statement
In the performance of this contract, the contractor shall provide the services to perform insulation renewal on a 45-foot Response Boat – Medium (RB-M) while the vessel is dry-docked at USCG Base Miami Beach Industrial Production Facility located at 100 MacArthur Causeway Miami Beach, FL 33139.
The contact person for this contract is LT Louis Simione, 305-535-4332.
Scope of Services
The contractor shall furnish trained, qualified personnel, and any required special tools or equipment necessary to complete the following work:
1. Install insulation in the entirety of the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, IAW Drawing 45-RB-M-635-002, Rev C.
2. Installation material will be as follows:
a. Sound attenuation barrier: Pyrotek “QUADZERO” #17763007
b. Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation
3. Installation process is as follows:
Bulkhead > 2” Insul-Quick Hullboard > Insulation Speed Washer > QUADZERO > Insulation Speed Washer > Trim Pin (if necessary) > Insulation Cap
4. Tape all boundaries.
5. All consumables, Hullboard: Owens Corning 2” Foil-Faced “Insul-Quick” insulation, Pyrotek insulation, and stud gun will be provided by the contractor.
6. USCG will provide pins and caps. Contractor will replace any damaged pins found upon insulation removal.
7. Contractor will arrange for disposal of existing lead-lined insulation. Existing lead-line insulation will be removed and packaged prior to Contractor arrival.
Contractor Performance Requirements
(1) Installation period of performance will be scheduled as determined by the vessel’s production schedule; estimated April or May 2020.
(2) Exact periods of performance will be scheduled by the COTR at least two weeks prior to start and will be performed Monday through Friday excluding holidays, during the following work hours:
6:30 am to 3:00 pm
(3) If overtime is required, the contractor must notify the COTR 24 hours in advance and must be approved by Base Miami Beach officials.
File details come from the government source that posted it. Updated .