About this file

This statement of work outlines requirements for 100 tactical radios and related equipment to support operations at Royal Air Force Mildenhall in the United Kingdom. The U.S. Air Force seeks to upgrade outdated systems and replenish unserviceable radios to facilitate training and operations. Key requirements include three AN/PRC-160 radios, three AN/PRC-117G radios, batteries, chargers, antennas, and carrying equipment. The solicitation is identified as FA558723Q0116 from the Department of the Air Force United States Air Forces in Europe - Air Forces Africa. Vendors must include all costs such as shipping and handling in their proposals. Successful offerors will deliver equipment FOB destination and coordinate installation at the base.

View the file

Other files for this federal contract opportunity

Other files attached to Harris Radios, newest first.
File Type Posted
Brand Name Justification.pdf PDF
Quote Sheet.pdf PDF
Combo Solicitation FA558723Q0116.pdf PDF
Item Description.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

100 OSS Harris Radios at

Royal Air Force (RAF) Mildenhall Rev. 2, 14 August 2023

1.0 Introduction

1.1. Mission: 100 OSS Weapons and Tactics operations has requirements at RAF Mildenhall, UK for Wideband, Multiband, and Multi-mission Tactical Radio systems. 100 OSS weapons and tactics uses these tactical radios for team continuity of communications during training and operations. These will both upgrade current out-of-date systems and replenish unserviceable radios to facilitate integration capabilities for USAFE operations and training.

1.1 Background: 100 OSS operations has requirements to develop, train and test full spectrum operations for USAFE.

Just as communications impact operations in the sky, they are just as important for the ground team. The RAF Mildenhall weapons and tactics team applies Personnel Recovery TTPs and full spectrum communications to enhance air operations, further increasing the USAF Mission accomplishment.

1.2 Scope: This contract will serve to overhaul existing unserviceable/out-of-date tactical radios within 100 OSS weapons and tactics. Through this tactical radio update, 100 OSS weapons and tactics will meet its operational requirement to interlink and coordinate ground parties and airborne personnel simultaneously.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.

Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to provide the following:

Item Description Quantity Specifications/Standards Technical Requirements

AN/PRC-160(V)1

RADIO ASSEMBLY, HF

MANPACK, MIL GPS. ***

SUPPLY COMSEC/DODACC/KLIF

ACCOUNT AT TIME OF

ORDER***

AFI 16-1301 USAFE SUP

A3.1

12200-8413-02 3 AN/PRC-160, LPI/LPD AND LDD,

FW V2.4.0X, FACTORY INSTALL

BB-2590/U 3 BATT LITHIUM ION

RECHARGEABLE 28.8 V

**GROUND TRANSPORTATION

ONLY, ADDITIONAL FEE

IMPOSED FOR SHIPMENTS BY

AIR/SEA DUE TO ICAO/IATA

REGULATIONS***

12043-4800-01 3 BATTERY BOX ASSEMBLY

RF-1944-AT150 3 ANTENNA, BROADBAND,

INVERTED VEE, 150 WATT

RF-5935-CA001 3 RUCKSACK, FALCON III RADIO

BAG

10553-0100-02 3 KIT, FIII KDU, GREEN W/ EXT

CABLE

RF-5058-CH002 3 BATTERY CHARGER,

CONDITIONER, 2-BAY

AN/PRC-117G(V)1

(C)

3 RADIO ASSY, TYPE I MULTIBAND

MANPACK,W/GPS,W/WB ***

SUPPLY COMSEC/DODACC/KLIF

ACCOUNT AT TIME OF

ORDER.***

12043-8940-0012 3 SW, FACTORY OPTION, MUOS.

***RESTRICTED FOR SALE TO

USG DOD CUSTOMER***

RF-3081-AT001 3 ANTENNA, MUOS, ATP SATCOM AFI 16-1301 USAFE SUP

12006-8010-01 3 KIT, MUOS, DIPLEXER, ATP, RF-

3081, PRC-117G

RF-7800B-DU024 3 BGAN ANT SYS, CLASS 2 LAND

PORTABLE, TAN DU

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.

4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.1.5 Hazardous material is not submitted.

4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.

4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 Shipping shall be FOB Destination.

4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.3.3 Weight of individual shipments must exceed 300lbs.

4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.

4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED

STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.8 100 ARW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 100th Logistical Readiness Squadron (100 LRS)

4.3.3.1 100 LRS/LGRD Customs; 100LRS.LGRD.Customs@us.af.mil

4.3.3.2 100 LRS/LGRDCR Inbound; 100lrs.lgrdcr@us.af.mil

4.3.3.3 Commercial phone number; +44 01638 543450.

5.0 Appendix: Related Documents

5.1 Attachment Harris 23CS63112Q

5.2 Attachment Harris 23CS61779Q