Statement of Work - One time Service Contract.docx

DOCX document 27 KB Posted

Attached to
One-Time Preventive Maintenance & Calibration Service on a Gentlemax Laser Pro Unit Federal contract opportunity
Solicitation number
HT941024Q1002
Issued by
Defense Health Agency

About this file

This statement of work outlines requirements for a one-time preventive maintenance and calibration service contract for a Gentlemax laser unit. The contractor shall provide a field service engineer to perform calibration and preventive maintenance on the equipment according to manufacturer specifications, utilizing any necessary parts, tools, supplies, transportation, and accommodations. The service includes legibly documenting all work completed on a signed service report to the Biomedical Repair Division within 72 hours of completion. The period of performance is for this one-time service requirement. The related federal contract opportunity is a solicitation from the Defense Health Agency to provide the preventive maintenance and calibration service specified in the statement of work for the Gentlemax laser unit.

View the file

Other files for this federal contract opportunity

Other files attached to One-Time Preventive Maintenance & Calibration Service on a Gentlemax Laser Pro Unit, newest first.
File Type Posted
Combined Synopsis-Solicitation - HT941024Q1002.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work One-Time Calibration and Preventative Maintenance Service Contract

1.0 GENERAL SCOPE OF WORK

Provide a trained Field Service Engineer who shall perform calibration and preventative maintenance (PM) for the equipment item listed in this statement of work under Appendix 1. The contractor shall provide labor, parts, equipment, tools, all supplies, transportation, accommodation, and services necessary to perform calibration and PM of the equipment item listed in Appendix 1.

2.0 DETAILED WORK REQUIREMENTS

The contractor shall perform calibration and PM in accordance with the manufacturer specifications. The contractor shall provide the necessary service and parts to complete the service as stated in this statement of work.

2.1 Parts

All parts necessary to perform calibration and PM during this service shall be provided by the contractor. The contractor shall not change, modify, or alter the original design and functional capabilities, without the written permission of both the manufacturer and the Biomedical Repair Division. The Contracting officer must approve any change, modification or alteration that would increase the contract price before the contractor performs any change, modification, or alteration.

2.2 Travel and Accommodations

The contractor shall be responsible for all travel, accommodations, and any other travel-related costs.

3.0 SPECIAL CONTRACT REQUIREMENTS

3.1 Minimum Qualifications

The contractor shall provide only fully qualified engineers or technicians who have gone through Original Equipment Manufacturer (OEM).

3.3 Normal Working Hours:

The contractor shall report to the Biomed Shop prior to performing the service at USNMRTC Guam, Monday through Friday, between the hours of 0730 -1700 local time. Any other hours will be at the discretion and agreement between the Biomedical point of contact and contracted service provider without additional cost.

3.7 Contractor Performance Evaluation

If performance does not meet the specifications stated in this SOW the contractor shall be notified of the lack of performance. The contractor shall be given a specified amount of time by the Biomedical Repair Section and Contracting Officer to correct the deficiencies. If deficiencies are not corrected, appropriate action will be taken in conformance with laws and regulation.

4.0 Documentation

Upon completion of the service, the contractor shall submit a signed service report to the Biomedical Repair Division within 72 hours. The service report shall indicate all problems addressed, devices checked, parts replaced, repair parts installed, labor, parts ordered and any issues unresolved. Each service report must at a minimum document the following data legibly and in complete detail:

- Name of contractor.

- Name of technician.

- Control number for the contractor or log number for the report.

- Description of the work performed in detail.

- Equipment identification: Manufacturer, make, model, serial number, electronic control number or (ECN)

- Itemized description of services performed with labor time.

- Action taken and or recommendations for consideration.

- Pending actions or resolutions to any problems.

- Total billing for services provided should be clearly indicated.

- Signature of the field service technician that conducted the maintenance.

Reports shall be submitted to usn.guam.navhospgu.list.biomed-repair@health.mil.

5.0 PERIOD OF PERFORMANCE

This is a statement of work for a one-time requirement.

Appendix 1. Equipment

ECN
Mfr. Serial No.
Nomenclature
Manufacturer
Common Model
83625
9914-9035-14037
LASER, ND:YAG, DERMATOLOGIC
CANDELA CORP
GENTLEMAX PRO

File details come from the government source that posted it. Updated .