Statement of Work - Lactation Modules.pdf
PDF 108 KB Posted
- Attached to
- Peterson SFB Building 350 Lactation Modules Federal contract opportunity
- Solicitation number
- FA251722Q0140
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Lactation Module Requirements.xlsx | XLSX spreadsheet | |
| Combined Synopsis-Solicitation - Lactation Pods B350.pdf | ||
| Lactation Module Placement.pdf | ||
| Lactation Modules Buy List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Lactation Pods
1.0. Introduction and Background. Peterson SFB has a requirement to purchase 4 lactation modules for use at locations in Building 350. The contractor will be required to provide and install the modules at the locations identified in paragraph 3.0.
2.0. Minimum Specifications. See Attachment 1 for minimum specifications.
3.0. Installation. The contractor will be required to provide on-site assembly and installation of the products at Building 350 on Peterson SFB in accordance with Attachment 2. Installation shall occur Monday – Friday from 0700-1600, excluding all federal holidays.
4.0. Base Access. The contractor will be responsible for obtaining access to Peterson SFB on the day(s) of installation. If your personnel require installation access, please submit the following to the Contracting Officer at least 7 calendar days before access is required:
Last Name, First Name
Driver’s License #
State Date of Birth
Company Days/Hrs for access
Visitor’s passes can be obtained from the Peterson SFB visitor’s center (located at the Peterson SFB West Gate). Bring registration and proof of insurance for all vehicles to be driven on Peterson SFB.
If a commercial vehicle is required on base (any vehicle whose primary purpose is to deliver equipment and supplies), please enter Peterson SFB from the East Gate vehicle search area.
Please expect at least 1 hour to obtain a visitor’s pass (one-time occurrence) and at least 1 hour for vehicle search (each time installation access is required).
Attachments (2)
1) Lactation Module Requirements
2) Lactation Module Placement
File details come from the government source that posted it. Updated .