Statement of Work for Laser Wire Marker.pdf
PDF 802 KB Posted
- Attached to
- Laser Wire Marker Federal contract opportunity
- Solicitation number
- FA8125-22-Q-0084
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers Amendment 0001 Attachment for Laser Wire Marker.pdf | ||
| Solicitation Amendment FA812522Q00840001 SF 30.pdf | ||
| Solicitation - FA812522Q0084.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Laser Wire Marker
Prepared by
OBCA / PZIM
PREAMBLE
Commander’s Safety Intent
The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each Contractor and Government employee.
1 SCOPE. This Statement of Work (SOW) defines the effort required for the purchase of one
(1) Laser Wire Marker to include delivery, installation, performance verification, calibration and training at Building 9001, Post U-30 at Tinker Air Force Base, OK.
2 REQUIREMENTS
2.1 General. Installation, performance verification, calibration and training shall be accomplished within five (5) business days of delivery. The Contractor shall provide to the Government Point of Contact (GPOC) the date that the Delivery, Installation, Training, Calibration and Performance Verification will take place, five (5) business days prior to installation beginning. The Contractor shall be responsible for ensuring all services, parts and components provided under this contract are In Accordance With (IAW) the terms and conditions outlined in this SOW.
2.2 Item Description 76 CMXG request the purchase of one (1) Laser Wire Marker.
1. 76 CMXG request the purchase of one (1) Laser Wire Marker delivery, installation, startup/performance verification, calibration and training.
2. The requested descriptions/specifications are outlined below:
o UV laser wire marking
• Sealed Laser
• Direct write on wire
• Full upper and lower case ACSII alphanumeric character set
• Single floor standing Unit – fully integrated system
• Air cooled laser
• Powered coiling pan
• Electrical requirements between 90-240 VAC, 50-60 Hz single phase
• Floor standing single dereeler not powered Processing Capabilities
• Accommodate 26 AWG to 6 AWG wire/cable
• Accommodate up to 900 m cable length and down to 150mm
• Accuracy of lengths meet -0/+0.25%
• Measure and cut wire electrically
• Marking speed of at least 25 m/min
• Splice detector capable
• Knot detector capable
• Automatic Spooling Controls
• Windows based computer controlled with software that is fully programmable
• Monitor/Keyboard/Mouse if required to control software Specifications
• Required to be able to meet Boeing BAC 5152 Electrical Standards
• Maximum dimensions: 35.0 x 35.0 x 40 inch.
Other
• One (1) Cover to prevent dust intrusion
• User manual
• Four (4) ea Laser safety goggles
• One (1) ea Laser Maintenance Kit o Installation
• Calibrated to AS5649/EN4650 standard
• Training of up to two (2) days o Two (2) year extended warranty
3. Contractor shall provide delivery, installation, startup/performance verification, calibration and training
IAW the SOW.
2.3 Contractor Requirements
• The Contractor shall deliver one (1) Laser Wire Marker that also includes items listed in 2.2 of this SOW
• The Contractor shall provide Delivery, Installation, Startup/Performance Verification, Calibration and Training.
• The Contractor shall make all necessary adjustments to the Laser Wire Marker until the item is fully operational in accordance with (IAW) the Original Equipment Manufacturer (OEM) specifications and to what is stated in this Statement of Work (SOW).
• The Operating system shall be Windows 10 Enterprise Long Term Servicing Channel (LTSC) or have all software, drivers, and installation instructions needed to allow for the computer to be upgraded by Air Force Information Technology (IT) personnel.
• The Contractor shall ensure that system administrators have access to perform mandatory patch management and security scans in order to comply with current Air Force Sustainment Center (AFSC) System Maintenance Plan and Information System Configuration management.
• The Contractor shall ensure that any Windows operating system can be configured to be domain joined and that contractor access will be restricted upon completion until access is deemed needed for consultation, maintenance, or repair.
2.4 Installation
2.4.1 The Contractor shall be responsible for equipment delivery to Building 9001, Post U-30 at Tinker AFB, OK. The Contractor shall be responsible for offloading equipment and moving equipment to installation area (Building 9001, Post U-30). The Contractor shall install and shall ensure that the installation of the provided Laser Wire Marker is IAW with the Original
Equipment Manufacturers (OEM) specifications. The Contractor shall be responsible for moving the one (1) Laser Wire Marker to the work area. The Laser Wire Marker will stand in the Government’s location of choice.
2.4.2 The Government shall provide power to the area that the one (1) Laser Wire Marker will be installed.
2.4.3 The Government shall provide utilities within 20 feet of the machine.
2.5 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600-1600. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the Contracting Officer (CO). Upon approval from the CO, the Government Subject Matter Expert (GSME) or GPOC must be present with the Contractor at all times.
2.6 Laser Wire Marker Acceptance Test Requirements
After installation, the Contractor shall demonstrate that the One (1) Laser Wire Marker meets or exceeds all OEM specifications and the requirements listed in section 2.2 of this SOW.
Contractor shall be present for the entirety of the acceptance testing. The length of time for Acceptance testing should not exceed one (1) day.
2.7 Training The Contractor shall provide training on-site Tinker Air Force Base for no less than six (6) operators. Training shall be for two (2) days, for eight (8) hours per day and shall be specified in the Contractor’s proposal.
2.7.2 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0600 - 1600. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the CO. Upon approval from the CO, the SME or GPOC shall escort all Contractor personnel at all times.
2.7.3 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
2.8 Calibration
2.8.1 The Contractor shall provide commercial calibration and certification on the equipment listed within the listed in the scope of work. Calibrated to AS5649/EN4650 standard.
2.8.2 Completion of Calibration Services: The Contractor, upon completion of the calibration services, shall demonstrate to the GPOC and Government Subject Matter Expert (SME) that all aspects of the system are calibrated and are properly functioning IAW the manufacturer’s specifications, industry standards and this SOW.
3.0 On-Base Requirements
3.1 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
3.1.2 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the Contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC's receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.
The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFI 32-7086, “Hazardous Materials Management”. The Contractor shall maintain a log of all HAZMAT that is used on base.
This usage log shall be provided to the GPOC monthly, the last business day of each month, or when the required work is completed. The GPOC will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.
3.1.3 Safety Data Sheet (SDS) and Labeling: Upon GPOC's receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this SOW on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the GPOC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs) and a completed OC-ALC Form 152, SDS Information Sheet. The Contractor shall receive approval from the GPOC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/
1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s); pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The GPOC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the GPOC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.
3.1.4 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor, or administrative and disciplinary action for the later shall be assessed if found in violation of above certification.
The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the GPOC if the required waste containers are not available on site.
3.1.5 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the GPOC within ten
(10) days after award. The GPOC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
3.1.6 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the GPOC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.
3.1.7 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and Unit Environmental Coordinator (UEC). The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to the CO, two (2) copies to the GPOC, a copy to the UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
3.1.8 Environmental Training: Upon the GPOC's receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
Contractor personnel performing duties in the service of this SOW shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;
http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the GPOC for approval within ten
(10) calendar days after contract award date. Once written approval is received from the GPOC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this SOW to the GPOC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.
3.2 Reserved
3.3 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.
3.4 Foreign Object Damage (FOD) and Dropped Object Prevention (DOP): Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.lion.com/Storing-Hazardous-Waste-for-LQGs acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the GPOC or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM.
3.4.1 The Contract Manager (CM) shall provide written certification to the GPOC for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the GPOC prior to the employees starting work in the OC-ALC shops. Every thirty-six (36) months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the
GPOC.
3.5 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 FOD/DOP Tool Listing, prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the GPOC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the GPOC within five (5) business days after delivery setup and calibration actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the GPOC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The GPOC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the GPOC.
The CM shall ensure each employee on the job site receives a briefing from the GPOC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.
3.6 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.
3.7 Visitors Pass: The Contractor shall contact the GPOC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The GPOC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate, which is South of I- 40 off Air Depot Blvd. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
3.8 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
3.9 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, GPOC, and Government Contract Administrator (GCA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, GPOC, and GCA within one (1) business day of damage to Government property or equipment during the execution of the contract.
3.10 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
3.11 OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The GPOC will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the GPOC with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security”, Chapter 6, Paragraph 6.2-6.2.3, 6.4- 6.4.4.; DoDI 5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.
3.12 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the GPOC shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the Government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
3.13 Speak up for safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
http://www.state.gov/g/tip
Events that present imminent danger to personnel or catastrophic damage to property we empower our employees to intercede to ensure continued safe operations.
3.14 Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.
3.15 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the GPOC (see Appendix C).
| 2 REQUIREMENTS |
| 3.4 Foreign Object Damage (FOD) and Dropped Object Prevention (DOP): Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Gr... |
| 3.4.1 The Contract Manager (CM) shall provide written certification to the GPOC for each employee within ten (10) business days after the contract award date. The certification shall have the title of the training, the name of the person who received... |