Statement of Work.pdf

PDF 156 KB Posted

Attached to
Calibration Kit Certification Federal contract opportunity
Solicitation number
NB6720202101477
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

TITLE: Calibration Kit Certification

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Radio Frequency Fields (672.02)

General Statement of Need:

The antenna laboratory has several pieces of Rohde and Schwarz (R&S) equipment that are used for conducting antenna measurement. This equipment requires regular service and calibration.

Background:

Regular service and calibration are necessary for maintaining equipment operation up to date for Antenna Measurement Services and laboratory operations.

Objective(s):

Maintenance of US Government owned R&S equipment at original equipment manufacturer standard.

Scope/General Requirements:

The Radio Frequency Fields Group possesses 32 pieces of R&S proprietary equipment that are critical to successful operations within the Antenna Measurement Services Laboratory.

Tasks/Specific Requirements:

Task Number Description Format Quantity Due Date

Customized Calibration:

- Calibration certificate including

Compliance Statement -ISO 9001 certified and in line with ISO 17925

32 ARO + 18

Months

-Measurement of product specifications, customized to individual needs, with the same procedures as used in production, including measurement uncertainties and guardbanding

-Documentation of calibration results upon receipt

-Adjustments to optimize the product parameters to after production condition when needed and documentation of after adjustment parameters

- Preventive maintenance and performance modifications

Government-Furnished Property, Material, Equipment, or Information:

This work shall be performed at contractor’s location. The items listed in the statement of work will be sent to contractor’s location, this work shall be coordinated with the technical point of contact and be performed in accordance with this statement of work.

Item: Calibration Unit 10MHz to 50GHz Model Number: ZV-Z55 Serial Number(s): 101436

Item: Calibration Kit WR15, 50GHz to 75GHz Model Number: ZV-WR15 Serial Number(s): 100004

Item: Calibration Kit WR10, 75GHz to 110 GHz Model Number: ZV-WR10 Serial Number(s): 100013

Item: Calibration Kit WR08, 90GHz to 140GHz Model Number: ZV-WR08 Serial Number(s): 101126

Item: Calibration Kit WR0, 140GHz to 220GHz Model Number: ZV-WR05 Serial Number(s): 101117

Item: Calibration Kit WR03, 220GHz to 325GHz Model Number: ZV-WR03 Serial Number(s): 100003

Item: Calibration Kit WR02, 325GHz to 500GHz Model Number: ZV-WR02 Serial Number(s): 101423 / 101424

Item: Vector Network Analyzer, 10MHz to 50GHz Model Number: ZVA50 Serial Number(s): 100126 / 100127

Item: Thermal Power Sensor DC to 50GHz Model Number: NRP-Z56 Serial Number(s): 101461

Item: Power Meter Control Unit Model Number: NRP2 Serial Number(s): 101709

Item: Frequency Convert WR15, 50GHz to 75GHz Model Number: ZVA-Z75 Serial Number(s): 100007 / 100010 / 100011 / 100012

Item: Frequency Converter WR10, 75GHz to 110GHz Model Number: ZVA-Z110 Serial Number(s): 100009 / 100040 / 100041 / 100042

Item: Frequency Converter WR08, 90GHz to 140GHz Model Number: ZVA-Z140 Serial Number(s): 100861 / 100862 / 100863 / 100864

Item: Frequency Converter WR05, 140GHz to 220GHz

Model Number: ZVA-Z220 Serial Number(s): 101024 / 101025 / 101026 / 101027

Item: Frequency Converter WR03, 220GHz to 325GHz Model Number: ZVA-Z325 Serial Number(s): 100021 / 100022 / 100023 / 100024

Security:

Security requirements for the NIST, Boulder Campus, CO (if necessary) N/A

Travel:

Special Material Requirements:

Other Unique Requirements:

Place of Performance:

Shall be at contractor’s location. This shall be coordinated with the technical point of contact.

Period of Performance:

18 months After Receipt of Order

File details come from the government source that posted it. Updated .