STATEMENT OF WORK.pdf
PDF 144 KB Posted
- Attached to
- BUILD UP OF THE SEB PH/HV/MODULES Federal contract opportunity
- Solicitation number
- 80NSSC245978
About this file
This statement of work outlines requirements for a federal contract to prepare for the build-up of SEB PH/HV modules. The contractor shall establish the technical baseline for PH6 including lessons learned, requirements, design definition, and verification requirements. The contractor will also perform schedule and programmatic tasks such as meetings and reviews. Additional responsibilities include reviewing and procuring PCBs and completing coupon testing, receiving and processing parts kits, screening and preparing optoelectronics, winding magnetics, project planning and management, and PH6 build activities such as populating boards. The place of performance will be at UMICH/SPRL for electronic delivery and NASA/GSFC for in-person support. The period of performance is scheduled to begin in December 2023.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Under this contract, SPRL will perform the effort required to prepare for the build-up of the SEB PH/HV modules
2. Characteristics, Scope, and Specs The contractor shall perform the following duties:
1) Establish Technical Baseline for PH6
a. Lessons learned and assessment of risks
b. Functional Requirements and Constraints for PH6 (Thermal, Volume, Voltage levels, Interfaces)
c. Design Baseline Definition
d. Verification Requirements
2) Schedule and Programmatic Tasks
a. Meetings (Formal reviews, Tiger Team participation, Travel for in person
GSFC meetings, Status meetings)
3) PCB Activities
a. Review PCB design layout, update if needed
b. Procure PCBs (6ea?)
c. Complete coupon testing of the boards
4) Parts Kit
a. Receive/Inspect (parts sent from GSFC)
b. Process, catalog, and store the parts
c. Up-screening optos for their various positions
d. Clean prep/pot optos based on their use
e. Wind the magnetics that are needed
5) Project Management
a. Planning, communications, coordination of activities, risk management, cost Management, technical management
6) PH6 Build Activities
a. Receive/Inspect parts sent from GSFC
b. Process, catalog, and store the parts
c. Up-screening optos for their various positions
d. Clean prep/pot optos based on their use
e. Start construction of the PH6 magnetics
f. Start population of the PH6 board
3. Place of Performance
UMICH/SPRL – electronic delivery of review materials and inputs NASA/GSFC – in person support for the review
4. Period of Performance
a. December 2023 – new government contract start
File details come from the government source that posted it. Updated .