STATEMENT OF WORK.pdf
PDF 138 KB Posted
- Attached to
- PIKA X2 CAMERA SYSTEMS Federal contract opportunity
- Solicitation number
- 80NSSC245805
About this file
This statement of work outlines requirements for a hyperspectral imaging camera system to be used by NASA Goddard Space Flight Center. The system must include a Pika XC2 Hyperspectral Imaging Camera manufactured in the United States, a 50mm VNIR objective lens manufactured in Germany, and a standalone linear stage with imager mounting and SpectrononPro software on a laptop, all manufactured in the United States. The camera will be used to measure the spatial and spectral uniformity of the VIIRS Flat Plate Illuminator in one vacuum chamber. Delivery is required by January 1, 2024 with an estimated lead time of three weeks. The related pre-solicitation for this requirement is solicitation number 80NSSC245805 for a Pika X2 camera system through the National Aeronautics and Space Administration Shared Services Center.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
NASA Goddard Space Flight Center has a requirement for a Pika XC2 Hyperspectral Imaging Camera with lens, mount, and calibration service. The Pika Camera will be used to measure spatial and spectral uniformity of the VIIRS Flat Plate Illuminator, in one vacuum chamber on campus. The camera system will allow characterization for the spatial and spectral uniformity in one measurement.
2. Characteristics, Scope, and Specs
Qty Description Part #
1 Pika XC2 Hyperspectral Imaging Camera (Manufactured in the US) 20‐10034
1 Objective Lens VNIR – 50mm (Manufactured in Germany) 10‐10217
Standalone Linear Stage (12" ServoSystem) w/ Imager Mounting and SpectrononPro on Laptop (Manufactured in the
US)
Custom Hardware
1 Radiometric Calibration, per Lens (Service performed in the US) RadCal
3. Place of Performance
NASA Goddard Space Flight Center 8800 Greenbelt Road, B33-G424 Greenbelt, MD 20771
4. Period of Performance
Lead time estimate: 3 weeks ARO Delivery required by - January 01, 2024
File details come from the government source that posted it. Updated .