STATEMENT OF WORK.pdf

PDF 184 KB Posted

Attached to
SOLIENSE LIFT BENCH 2. 0 FLUOROMETER SYSTEM Federal contract opportunity
Solicitation number
80NSSC243997
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines requirements for the National Aeronautics and Space Administration Goddard Space Flight Center to purchase a Soliense LIFT BENCH 2.0 Fluorometer System. The scope includes one base unit with five excitation wavelengths and six emission channels, one flowthrough cuvette assembly, an integrated pump assembly, LIFT software for control, data acquisition and processing, and a shipping case. Additional items are a Dell laptop computer for instrument control and data storage, four DC UV excitation spectral channels, one spectrofluorometer channel, and LIFT software calibration utility. Delivery is required by May 15, 2024, with a loaner instrument to be provided by February 15, 2024. The related federal contract opportunity is solicitation number 80NSSC243997 to purchase the Soliense LIFT BENCH 2.0 Fluorometer System for the National Aeronautics and Space Administration Shared Services Center.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

NASA Goddard Space Flight Center (GSFC) requires the purchase of the Soliense LIFT BENCH 2.0 Fluorometer System which will be used by the Field Support Group of the Ocean Ecology Lab/Code 616.

2. Characteristics, Scope, and Specs

QTY DESCRIPTION

LIFT_BENCH_2.0 Light Induced Fluorescence Transient Fluorometer, Bench‐ Top Version, Base Unit Base instrument with five excitation wavelengths and six emission channels One flow‐through cuvette assembly Integrated Software controlled stepper motor‐driven pump assembly LIFT real‐time control, data acquisition, and data processing software package PELICAN REPC1550NF shipping case

LIFT_CONTROLLER_1.0

Dell Precision 7680 Workstation Laptop computer for instrument control, data processing, and data storage intel Core i7‐13850HX vPro, Windows 10 OS 16GB RAM, 1x16GB 4800MT/s, non‐ECC 1 Tb, M.2 2280, Gen4 OCIe NVMe, SSD

1 LIFT_BENCH_DCUVEX_2.0

DC UV excitation spectral channel

4 LIFT_BENCH_DCVISEX2.0

485, 560‐565nm, and 620 nm

1 LIFT_BENCH_SPECTR_LML_1.0

Spectrofluorometer Channel

1 LIFT_BENCH_PAR_1.0

SQS): LIFTsoftware calibration utility

3. Place of Performance

NASA Goddard Space Flight Center 8800 Greenbelt Rd Greenbelt, MD 20771 Bldg 22, Rm C283 POC: Antonio Mannino

4. Period of Performance

Delivery lead time: 5/15/2024 *A loaner instrument will be provided within 3 months of PO issuance (~by 2/15/2024).