STATEMENT OF WORK.pdf
PDF 96 KB Posted
- Attached to
- SOFTWALL CLEAN ROOM Federal contract opportunity
- Solicitation number
- 80NSSC237484
About this file
This statement of work outlines requirements for two softwall clean room tents to be provided under the National Aeronautics and Space Administration Shared Services Center solicitation number 80NSSC237484. The manufacturer shall provide one ISO 7 clean tent measuring 16' wide, 10' deep with an 8' interior height constructed of materials compatible with an ISO7 cleanroom environment containing no exposed silicones. Full height sidewalls, interior lighting, HEPA airflow to sustain ISO7 conditions with 3 gowned workers inside, and feet for mounting are required. Additionally, one ISO 8 portable clean tent measuring 8' wide, 4' deep with an 8' interior height is required, with compatible construction, full sidewalls, interior lighting, ISO8 sustaining HEPA airflow for 1 gowned worker, and wheels for mobility. All electrical equipment for both tents must operate at 120 volts with NEMA 515 or 520 plugs.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of work for building 37 room S185 clean tents:
Manufacturer shall provide the following:
One ISO 7 clean tent, 16’ wide, 10’ deep with an 8’ interior height
Tent shall be constructed of materials compa ble with ISO7 cleanroom environment with no exposed silicones
Tent shall have full height sidewalls
Tent shall have flaps for entering
Tent shall have interior ligh ng
Tent shall have adequate HEPA airflow to sustain ISO7 with 3 gowned workers inside
Tent shall be mounted on feet
All electrical equipment shall operate on 120 volt power and have NEMA 5‐15 or NEMA 5‐20 plug ends
Manufacturer shall provide the following:
One ISO 8 portable clean tent, 8’ wide, 4’ deep with an 8’ interior height
Tent shall be constructed of materials compa ble with ISO8 cleanroom environment with no exposed silicones
Tent shall have full height sidewalls
Tent shall have interior ligh ng
Tent shall have adequate HEPA airflow to sustain ISO8 with 1 worker gowning inside
Tent shall be mounted on wheels
All electrical equipment shall operate on 120 volt power and have NEMA 5‐15 or NEMA 5‐20 plug ends
File details come from the government source that posted it. Updated .