STATEMENT OF WORK.pdf

PDF 96 KB Posted

Attached to
SOFTWALL CLEAN ROOM Federal contract opportunity
Solicitation number
80NSSC237484
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This statement of work outlines requirements for two softwall clean room tents to be provided under the National Aeronautics and Space Administration Shared Services Center solicitation number 80NSSC237484. The manufacturer shall provide one ISO 7 clean tent measuring 16' wide, 10' deep with an 8' interior height constructed of materials compatible with an ISO7 cleanroom environment containing no exposed silicones. Full height sidewalls, interior lighting, HEPA airflow to sustain ISO7 conditions with 3 gowned workers inside, and feet for mounting are required. Additionally, one ISO 8 portable clean tent measuring 8' wide, 4' deep with an 8' interior height is required, with compatible construction, full sidewalls, interior lighting, ISO8 sustaining HEPA airflow for 1 gowned worker, and wheels for mobility. All electrical equipment for both tents must operate at 120 volts with NEMA 515 or 520 plugs.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of work for building 37 room S185 clean tents:

Manufacturer shall provide the following:

One ISO 7 clean tent, 16’ wide, 10’ deep with an 8’ interior height

Tent shall be constructed of materials compa ble with ISO7 cleanroom environment with no exposed silicones

Tent shall have full height sidewalls

Tent shall have flaps for entering

Tent shall have interior ligh ng

Tent shall have adequate HEPA airflow to sustain ISO7 with 3 gowned workers inside

Tent shall be mounted on feet

All electrical equipment shall operate on 120 volt power and have NEMA 5‐15 or NEMA 5‐20 plug ends

Manufacturer shall provide the following:

One ISO 8 portable clean tent, 8’ wide, 4’ deep with an 8’ interior height

Tent shall be constructed of materials compa ble with ISO8 cleanroom environment with no exposed silicones

Tent shall have full height sidewalls

Tent shall have interior ligh ng

Tent shall have adequate HEPA airflow to sustain ISO8 with 1 worker gowning inside

Tent shall be mounted on wheels

All electrical equipment shall operate on 120 volt power and have NEMA 5‐15 or NEMA 5‐20 plug ends

File details come from the government source that posted it. Updated .