STATEMENT OF WORK.pdf
PDF 106 KB Posted
- Attached to
- ELECTRONICS RETROFIT AND SOFTWARE UPGRADE FOR THE 4485 LOAD FRAME Federal contract opportunity
- Solicitation number
- 80NSSC236777
About this file
This statement of work outlines requirements for a retrofit of a 4485 load frame and software upgrade. The National Aeronautics and Space Administration Shared Services Center seeks to procure hardware and software to replace electronics and a PC on an Instron 4485 load frame to integrate an operator touch screen for machine control. Repairs are also needed to replace the power amp and 100kN load cell. Deliverables include replacement parts with a 12-week lead time from order acceptance. The performance period for the retrofit is December 4-8, 2023 at the NASA/GSFC Building 30, Room 125 location. This supports the pre-solicitation for opportunity number 80NSSC236777 for an electronics retrofit and software upgrade for the specified load frame.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Procurement of Retrofit 4485Load Frame
PR 4200846777
1. Objective/Requirements The procurement of hardware and software for Instron 4485 load frame. The most recent test software, Bluehill Universal, requires replacement electronics and PC for integration.
The update will integrate an operator touch screen for machine control. Repair and replace power amp and 100kN load cell
2. Characteristics, Scope, and Specs
The electronics retrofit should be capable of performing the following:
Running Bluehill Universal Software Touch screen Include prewritten test profiles in accordance with ASTM standards Provide customization of test profile for either compression or tensile
Replacement of Power amp and 100kN load cell. The load cell shall have autorecognition to the frame and capable of shunt calibration and fitted with Instron connector.
3. Deliverables or Delivery Schedule See price quote for item details 12-week lead time from acceptance of official order, subject to prior orders
4. Place of Performance
NASA/GSFC Building 30, Room 125
5. Period of Performance
Retrofit shall be performed December 4, 2023 through December 8, 2023.
File details come from the government source that posted it. Updated .