Statement_of_Work.pdf
PDF 3 MB Posted
- Attached to
- Carpet Replacement Federal contract opportunity
- Solicitation number
- 140P6423Q0080
About this file
This statement of work describes a carpet replacement project for four apartments at Perry's Victory and International Peace Memorial in Put-in-Bay, Ohio. The selected contractor will remove existing carpet, padding and tack strips before installing new carpet padding, tack strips and carpet matching the specified brand, fiber type, density and face weight. The contractor must complete the work within 240 calendar days after award excluding scheduled weather delays. The National Park Service is soliciting this requirement under solicitation number 140P6423Q0080 to replace carpet at two duplex buildings located at 90 and 100 Park Avenue in Put-in-Bay, Ohio.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6423Q0080_Amd_0001.pdf | ||
| Price_Schedule.pdf | ||
| Wage_Determination.pdf | ||
| Sol_140P6423Q0080.pdf | ||
| Provisions_to_be_Completed.docx | DOCX document | |
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Provisions_to_be_Completed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Service Contract Requirements V. 2021-10-18 Page | 1
Perry’s Victory and International Peace Memorial
Put in Bay, Ohio
STATEMENT OF WORK:
Replace Carpet
Dated:
8/15/2023
NATIONAL PARK SERVICE
INTERIOR REGION 3/4/5
OHIO MAJOR ACQUISITION BUYING OFFICE
Page | 2
SERVICE GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 – LOCATION AND DESCRIPTION OF WORK
1.1 Background: This project consists of the removal of existing carpet and carpet padding and tack strips. The installation of new carpet padding, tack strips and carpet in four, two bedroom apartments. The carpet in the apartments are approximately 550 square feet per apartment. These apartments mirror each other in square footage. Each apartment has two bedrooms and a living room to be carpeted.
1.2 Work Covered by the Contract Documents:
A. Project Location: location of the duplexes are 90 Park Ave Put in Bay OH 43456 and 100 Park Ave. Put in Bay OH 43456
1. Work consists of: Remove furniture from rooms being carpeted.
2. Remove room threshold/transitions
3. Remove existing carpet, carpet padding and tack strips.
4. Inspect the sub floor for any damage or unevenness. Repair or replace any damaged sections.
5. Install new padding.
6. Install new tack strips.
7. Install new carpet by stretching carpet attaching to tack strips.
8. Neatly tuck edges of carpet and smooth out any wrinkles.
9. Install new thresholds/transitions
Page | 3
B. All work will be performed under a single contract.
C. Period of Performance: Work shall be done after apartments are unoccupied. Generally the apartments are not occupied between October 15th thru April 15th. Contractor to coordinate with the island ferry service for their schedule and closers. Work shall be completed within 240 calendar days after date of Award. The period of performance is inclusive of 0 weather days.
Period of Performance will be
This contract will be performed after the occupants move out of the apartments and the contractor should know that the park is on an island. The ferry service operates on a schedule into the fall months and then is dependent on weather in the winter and spring months. We start having employees back to park moving in these apartments in April.
ITEM 2 - EXISTING UTILITIES
2.1 Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies to coordinate proposed locations, times for excavation and request location services prior to any digging operation.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
2.3.1 Notify CO and COR not less than two business days in advance of proposed utility interruptions.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Superintendent's Compendium - Perry's Victory & International Peace Memorial (U.S. National Park Service) (nps.gov)
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
Page | 4
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;
holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site. Limit use of premises to area of service provided as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limits: Duplex #90 and Duplex # 100 and the nearest parking spaces. If a dumpster is needed park will notify the contractor the spot it is to be placed.
C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
D. Utilities:
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for operations without any additional permit costs. Use resources wisely and minimize waste of water.
Page | 5
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for operations without any additional permit costs. Power may or may not meet your power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Toilets: Contractor can us the toilet in the apartments they are working in.
E. Security and Protection facilities: Some of this may be relevant and some may not.
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct work in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all service equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Disassembly of equipment components or specialized inspection tools are not required.
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial.
No cost specific storage and staging area’s may be discussed at the kick off meeting. Parking for vehicles in designated parking area. Discus with COR on location of dumpster if needed. Limits of use and control shall be subject to Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters.
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Photo Documentation:
Contractor must provide existing condition, progress and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email within 7 days from time of taken or as approved by COR.
Page | 6
3.9 Fire and Life Safety:
A. Comply with the requirements of NFPA.
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
i. Immediately report all spills of hazardous materials to the CO, COR and park.
ii. Maintain a spill emergency response kit.
iii. Train employees how to respond to a spill and use an emergency response kit.
3.10 Noise and Acoustics Management: N/A
ITEM 4 - EXAMINATION OF THE SITE
4.1 All interested contractors are urged to visit the job site and examine existing conditions before submitting quotes. Contractors will be expected to complete the work as quoted.
ITEM 5 – SUBMITTALS
5.1 General Submittal Procedures:
A. General: Prepare and submit submittals for approved equipment as specified
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer.
5.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Product Data: Provide component and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or
.TIF) to COR.
B. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selection. Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
C. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
Page | 7
D. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor.
If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
5.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
ITEM 6 – TEMPORARY SERVICES
6.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
Page | 8
ITEM 7 – DELIVERY
7.1 Contractor will ensure all delivery of materials, tools and supplies to specified locations as outlined in the contract. Storage on-site of the above items will be at the discretion of the COR.
ITEM 8 - PROJECT CLOSEOUT
8.1 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for intended use.
8.2 Completion: Contractor shall request a final inspection to the Contracting Officer and COR.
8.3 Warranties:
A. Workmanship Warranty will be based on project acceptance and will remain in effect for 1 year following acceptance. The contractor will also support manufacturer warrantied items and repair work during this period.
B. Provide all manufacturer warranty information of products installed. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
Page | 9
PART 2 – MATERIAL SPECIFICATIONS
All product/materials contained in the below sections are subject to FAR Clause 52.211-6 Brand Name or Equal.
Despite a manufacturer and product being listed, it is a suggested product, but all products/materials are brand name or “or equal”. Brand name or equivalent product must use manufacturer’s instructions and recommendations for product installation/application.
Item Description
Part Number Specifications
Carpet Quiet Sanctuary 5E280
Gauge:
Tufts:
Finished Pile Thickness:
Fiber:
Primary Backing:
Twist Information:
Density:
Face Weight:
Color:
3/16 inch
3.6 per inch
0.987 inch
100% Anso High Performance PET
Polypropylene
5.20
2134 oz/yd³
58.5 oz/yd³
Park will choose color
Additional Requirements:
A. An additional 10% overage of carpet (not including remnants) will be supplied by the contractor to the government COR.
B. It is recommended that square footage be double checked prior to bidding to ensure accuracy.
END OF SECTION
1 �= \()' �y r
0i
�o
�--<....�Y--oc l"~.
�I
J rbegany Typewritten Text
APARTMENT LAYOUT
Untitled Map Write a description for your map.
Legend
Duplex
Feature 1
0 National Park Service
9 Put-in-Bay Ferry
IP Put-in-Bay Tour Train rbegany Typewritten Text
PARK MAP
| Statement of Work |
| ApartmentDrawing |
| Park Map |
File details come from the government source that posted it. Updated .