This statement of work outlines requirements for upgrading hardware, software, and the Unify OpenScape Command and Control dispatch system for the 7th Bomb Wing Command Post located at Dyess Air Force Base. Key requirements include upgrading the existing HiPath 4000 communications server and four controller positions at the primary location, and providing upgraded equipment for storage at the alternate location upon renovation completion. The contractor must also upgrade existing voice recorders, radio interfaces to connect primary command post radios, and provide an administrative desktop PC for system management. The contractor is responsible for installation, setup, testing, training, documentation, and providing a 12-month warranty and support period beginning at final acceptance. The solicitation requests quotes to be submitted by email no later than 10:00 a.m. CST on 21 December 2022 to kasey.hutton.1@us.af.mil. The Department of the Air Force Global Strike Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Unify Console System Update, newest first.
File Type Posted
FA466123Q0005 RFQ.docx DOCX document
FAR 52.212-5.pdf PDF
FAR Provisions and Clauses.pdf PDF
FA466123Q0005 RFQ.docx DOCX document
Unify Console Specs List.pdf PDF
Brand Name JA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

17 OCT 2022

Unify HiPath to OpenScape Dispatch System Upgrade

7 Bomb Wing Command Post

AT DYESS AFB, TEXAS

1.0. Description of Work. The contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, transportation, materials, and any other items necessary to upgrade hardware, software, and the Unify OpenScape Command and Control (C2) dispatch system for the 7th Bomb Wing Command Post located at Dyess Air Force Base.

Building 8030 will serve as the primary Command Post

Building 6015 will serve as the alternate Command Post

Scope. This project effort is to upgrade the Unify (formerly Siemens) HiPath dispatch communications system for the Dyess Command Post. The work consists of a site visit/survey, design, planning, upgrade, installation, system set-up, testing, cutover, controller training, and applicable documentation of hardware and software components installed. The contractor shall include a support and maintenance warranty for 12-month period, beginning at final system acceptance/cutover.

Objectives. The Dyess Command Post will have direct lines to all operational organizations as part of the current HiPath System configuration. Each controller position must be able to communicate with all agencies involved in the 7th Bomb Wing and 317th Airlift Wing operations.

1.1. Installation. 7 BW/CP, Bldg. 8030. Contractor shall upgrade the existing HiPath 4000 communications server and upgrade four (4) controller positions at the primary location. The Contractor shall provide an upgraded communications server and three (3) controller positions for storage as the alternate location, Bldg. 6015, is currently under renovation.

The HiPath system will receive a software upgrade to the Joint Interoperability Test Center (JITC) Certified OpenScape Voice Local Session Controller (LSC) Node A & B. The LSC-Node A will be located in building 8030. LSC-Node B will be located in building 6015. Both nodes will connect to each other via base LAN infrastructure and remain ‘active’ to support all positions. The existing voice recorders will receive upgrades to IP versions and connect to the OpenScape solution. Rack-installation locations will be determined during engineering survey.

The Contractor shall provide manufacturer certified professionals to perform all necessary work for the completion of the project. The Contractor shall appoint an authorized representative who will be the company’s senior representative for all customer communication and enforce compliance of all requirements for the project.

a. In support of the upgrade described above the contractor shall:

i. Coordinate with 7th Communications Squadron (7 CS) telephone systems and Tech Control Facility to support relocating all existing Primary Rate ISDN (PRI) connections between the base Dial Central Office and HiPath to the OpenScape Voice LSC. (PRI relocation will be staggered during initial installation and testing so operations are not impacted). If PRI programming demands provisional changes from the current voice network/circuits, the contractor via the project manager (PM) will host a transport-provisioning meeting with the 7 CS reps. All transport and PRI changes needed to accommodate the upgrade will be fully agreed upon as “able to provide” from the existing central telephone office switch. The contractor is responsible for any proprietary issues that arise creating problems to establish the new service via the LSC gateway to the base central office, the contractor shall provide the SME-engineer POC to accommodate connection to today’s servicing transport/translations network.

ii. Upgrade four (4) controller workstations each configured with one (1) touch-screen computer, two (2) push-to-talk handsets, and two (2) dual-channel speakers. One Universal Power Supply (UPS) unit per position is included in this project. The contractor shall ensure proper ANSI/ANSI 568 cabling standards be employed to all servicing workstations back to the LSC as determined during engineering survey.

iii. Upgrade four (4) radio interfaces for Any-to-Any Voice Connectivity to connect primary Command Post radios. Specific channels/nets to be determined during engineering survey. Proper ANSI/ANSI 568 cabling standards will be employed to all servicing workstations back to the LSC as deemed. This connection will be via the USAF/government LAN.

iv. Upgrade existing voice recorder to support recording (telephone and radio) for each controller position. Proper ANSI/ANSI 568 cabling standards will be employed to all servicing workstations back to the LSC as identified in the engineering survey.

v. Upgrade one (1) administrative desktop PC for local user system management IR Range.

b. ALTERNATE Node, bldg 6015. Building 6015 is currently under renovation and equipment for the Alternate Node cannot be installed until completion.

Therefore, the contractor shall provide the OpenScape Voice Node B and associated equipment and it will be stored by the 7 BW Command Post until such time that Building 6015 is ready to receive installation. Ultimately, the alternate location will operate in the same manner as the primary in the event of a node failure (fully survivable). This node is NOT a backup server, this is an active node that remains fully integrated in all call control sessions. Meaning, a failure in node A or connectivity loss to node A will not result in system degradation.

i. Coordinate with 7 CS telephone systems and Tech Control Facility to support relocating all existing PRI interface connections between the base

Dial Central Office and HiPath to the OpenScape Voice LSC. (PRI relocation will be staggered during initial installation and testing so operations are not impacted) If PRI programming demands

ii. Provide three (3) controller workstations each configured with one (1) touch-screen computer, two (2) push-to-talk handsets, and two (2) dual-channel speakers. One UPS unit per position is included in this project.

The contractor shall ensure proper ANSI/ANSI 568 cabling standards be employed to all servicing workstations back to the LSC-pair as determined during engineering survey. This network will utilize the USAF/government LAN.

iii. Provide three (3) radio interfaces for Any-to-Any Voice Connectivity to connect alternate Command Post radios. Specific channels/nets to be determined during engineering survey. Proper ANSI/ANSI 568 cabling standards will be employed to all servicing workstations back to the LSC-pair as deemed. This connection will be via the USAF/government LAN

iv. Support recording (telephone and radio) for each controller position.

Proper ANSI/ANSI 568 cabling standards will be employed to all servicing workstations back to the LSC-pair as identified in the engineering survey.

c. Above system will support the following salient features:

i. One-touch conferencing (perform “all calls” on radios and by phone)

ii. Automatic notification of incoming telephone or radio calls

iii. Provide programmable pre-set calling operations via ‘buttons” on touch-screens

iv. Electronic directory (include hotlines to key agencies)

v. Connect to existing base dial central office via existing PRI connections.

vi. A thorough transport/translation/configuration cutover strategy meeting will be performed and agreed upon prior to service activation. Segregated or NFAS/D channel service, dial plan, testing, and more will be thoroughly examined same. Future SIP services transport is required.

vii. Warranty and troubleshooting support included for 12 months

1.1.2. Drawings. The contractor shall provide an installation equipment list and drawings of the installed equipment.

1.1.3. Operational Test. The contractor shall conduct operation test in accordance with manufacturer’s standard to meet commercial practice and to ensure the system is functional.

1.1.4 Testing Requirements

The Contractor will perform all testing as specified in the Contractor provided and Government approved (which approval shall not be unreasonably withheld or delayed) test plan to verify that the system meets the minimum feature requirements specified therein. The Contractor has the responsibility to test the installation prior to cutover. The Government may witness all testing. The Contractor will document these test results. Copies of the test results will be provided to the Government upon the Government’s request. All hardware and software procured under this SOW will be tested as set forth in the testing plan described above.

1.1.5 Acceptance Upon the Contractor’s successful completion of its testing in accordance with Section 1.1.4, above, the installation will be cutover and deemed accepted by the Government.

At that time, the Government will finalize all applicable acceptance documentation required to close out the project.

1.2. Power Shut Down. Contractor work requiring shutting down facility power will need to be coordinated with facility POCs in advance of requested power outage. Although not anticipated with this project, in cases where power outage requests may affect critical functions affecting the facility’s primary mission systems, power outage coordination requests are required twenty-one

(21) days in advance due to critical information technology (IT) equipment within the building areas. It should be noted that the Contractor's performance may be interrupted from time to time because of high priority mission schedules or no-notice events. For each calendar day and/or portion of a calendar day that the contractor is removed/denied access from the job site, the contractor schedule will be adjusted by one calendar day.

1.3. Operation and Maintenance Manual: The contractor shall provide two hard-copy and one (1) CD of the manufacturer’s operation and maintenance manuals.

1.4. Warranty. The contractor shall include a support and maintenance warranty for 12-month period, beginning at final product system acceptance/cutover.

The Contractor will include one (1) year onsite warranty on all parts and labor and warranty support for all Contractor installed hardware and software under this SOW. The one (1) year warranty period will not begin until Government’s acceptance, as further described below. The warranty will consist of emergency technical assistance as required, including 24/7 remote dial-in (provided that the Government is responsible for providing such remote access) and on-site responses, as appropriate, for system failures (as further described below). The remainder of this Section further describes the scope of the Contractor’s responsibilities with respect to deficiencies with the hardware and software provided by the Contractor:

1.4.1 Catastrophic Failures: A catastrophic failure means loss of the ability to initiate or answer calls on 25 percent or more of the circuits.

If a catastrophic failure occurs, the Contractor will perform a service call, if Contractor deems necessary. The Contractor’s personnel will use all commercially reasonable efforts to begin diagnosis and repair efforts within two (2) hours of the Contractor’s receipt of the notification of the failure and immediately commence efforts to diagnose and repair the problem. The Contractor will continue to work on the problem until full system capabilities are restored.

1.4.3 Major Failures: A major failure means the loss of supervision, conference ability, or ability to initiate or answer calls on 10 percent or more of the circuits.

If a major failure occurs, the Contractor will perform a service call, if Contractor deems necessary. The Contractor’s personnel will use all commercially reasonable efforts to begin diagnosis and repair efforts within three (3) hours of the Contractor’s receipt of the notification during the Contractor’s normal business hours. In the event of a notification during Contractor’s non-business hours, the Contractor’s personnel will use all commercially reasonable efforts to begin to repair the problem at the beginning of the Contractor’s next business day during the Contractor’s normal business hours. The Contractor will use commercially reasonable efforts to restore the service within forty-eight (48) business hours of the Contractor’s initial notification.

1.4.4 Minor Failures: A minor failure means any abnormal hardware or software error that degrades service to less than the desired performance, but which does not constitute a major or catastrophic failure.

If a minor failure occurs and the customer notifies the Contractor of such minor failure, the Contractor will begin repair efforts as soon as commercially reasonable. The Contractor will use commercially reasonable efforts to repair minor failures within three (3) business days after the customer’s receipt of notification of the minor failure.

1.5 Training. The contractor shall provide system training for the user upon completion of the installation.

2.0. Hours of Service. The contractor’s personnel will perform scheduled work on weekdays, Monday through Friday from 0800 – 1600 except US Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Exceptions shall be coordinated in advance and approved in writing by the Contracting Officer (CO).

2.1. U.S. Recognized Holidays.

1 January New Year’s Days 3rd Monday in January Martin Luther King Jr.’s Birthday 3rd Monday in February President’s Day Last Monday in May Memorial Day 19 June Juneteenth 4th of July* Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11 November* Veterans Day 4th Thursday in November Thanksgiving Day 25 December* Christmas Day

*American holidays falling on a Saturday will be observed on the preceding Friday, and holidays falling on a Sunday will be observed on the following Monday.

2.2. Arrangements of the Performance Time. In the event that upgrades or changes to the system must be done during off peak or limited usage time (i.e. weekends), the Government reserves the right to request flexible work hours from contractor personnel. Upon a 24 hour advance, written notification from the Contracting Officer, the Government and contractor may establish a mutually agreed upon time to institute/incorporate the system change. Contractor personnel will substitute the noncore, weekend hours for an equal number of weekday hours.

For example, if an upgrade is accomplished on a Saturday and takes 4 hours, contractor personnel may choose to take off 4 hours on the following Monday or Tuesday.

2.3. Temporary Work Stoppage. In the event the U.S. Government requests a temporary shutdown of the facility, the contractor will be notified in writing by the CO. Any Government caused delays as a result of a temporary shutdown that may require an adjustment to the contract will be coordinated through the CO.

3. Disposal of Materials. All debris and unserviceable materials generated under this contract such as scrap, salvage material, industrial waste, non-recyclable materials and equipment/material not listed on hand-receipts shall be disposed of off-base by the contractor in accordance with all applicable federal, state, and local regulations. Hand receipt items require turn-in action by the contractor when the listed items have to be replaced.

4. Inspection/Acceptance. Upon completion of above work, acceptance inspections shall be conducted by the contractor and the Government Representative (GR). If any deficiencies are found during the inspection, the contractor shall make correction(s) as required, at no additional charge to the Government.

5. Responsibility for Damages. Any damages caused to U.S. Government property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government. The Contractor shall notify the CO within one (1) business day of damage to Government property or equipment during the execution of the contract.

6. Government Furnished Properties and Services. The Government will provide reasonable utilities and workspace for the contractor to perform the requested duties. The Contractor will provide all equipment and storage space necessary to perform tasks. With the exception of equipment and materials used for No covered or secure storage areas will be made available to the contractor. Storage of materials or equipment inside of a government facility shall be coordinated and approved by the CO or GR in writing.

6.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted. Contractor personnel will ensure facility cleanliness is maintained at all times.

6.2 Telephones. The Government will not provide telephone services. If available, the Contractor may use government phones in a case of emergencies or during field and site work.

No long-distance telephone calls will be authorized.

7. Restricted Area/Access Coordination. The GR is responsible for coordinating with the facility manager/user/occupant/requester to provide access, escorts, or temporary visitor access badges for contractor personnel while performing SOW duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.

7.1 Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.

The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Dyess AFB outside of the "USAF Controlled" and "USAF Restricted" areas.

“USAF Controlled” access areas are the mid-level security areas. Presence within the CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.

The highest level of security on Dyess AFB is that within the “USAF RESTRICTED AREAS”.

These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of Dyess AFB Security Forces.

7.2 Access to Classified Information. Access to classified not required.

8. Installation Access. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The GR will provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security Forces.

NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.

8.1. Dyess Form 173. The Dyess AFB Form 173 is subject to the privacy act of 1974, Authority: 10 U.S.C. 8012 and 5 U.S.C. 552a (b) (7). Disclosure is Mandatory: Failure to provide the information and Social Security Number (SSN) could result in denied access to the Dyess AFB installation.

8.1.1. Effective 1 Nov 04, a completed signed original Dyess Form 173 (Mar 04) must be delivered to Pass & ID by 0900 on the duty day prior to the desired day of entry onto Dyess AFB. The Visitor Control Center no longer issues temporary passes to contractor personnel unless they have already been previously identified on an executed Dyess Form 173. All information on the Dyess Form 173 must be typed and the authorizing signature must be in blue or black ink. Personal information provided on the Dyess Form 173 will be cross-referenced against state and federal criminal databases to identify those individuals possessing outstanding warrants. Those individuals with outstanding warrants will be detained at the Visitor Control Center on the desired day of entry, and turned over to Abilene Police Department.

8.1.2. The approving authority (individual on the 577) can make “ink changes” in red ink to correct any errors noted on the form. All changes have to be initialed by the approval authority.

8.1.3 .All individuals with Dyess Form 173’s will still continue to be processed via the Texas Law Enforcement Terminal System (TLETS—police wants/warrants check). Once it is determined the individual is cleared from any wants or warrants, a copy of the Dyess Form 173 will be placed at the Tye Gate entry point. The Tye Gate Guard will use this form as an Entry Authority List (EAL) allowing contractors onto the installation. The contractor will then be able to go to the Gate directly (not the Visitor Control Center (VCC) or Arnold Gate) and verify if their Dyess Form 173 is there. Should their Dyess Form 173 not be there, they will be directed to the VCC for issuance of an AF Form 75. At this time, someone will physically have to meet them to sponsor them onto the installation. (Reasons why the form would not be at the guard shack would be erroneous driver’s license number, erroneous information, warrant, or identified as illegal alien).

8.1.4 Should their Dyess Form 173 be at the Tye Gate entry point, the contractor will be told to proceed directly to the Pass and Registration Section for the 7 SFS Contractor Badge issue. The Pass Section will have the original Dyess Form 173. Once a badge is obtained, they need only show the badge at the installation gate for entry onto the installation. Please note that neither the Security Forces Control Center nor the Tye Gate Guards will check the Dyess Form 173 for errors. This is the responsibility of the Pass and Registration Section.

8.1.5. The Dyess Form 173 will be maintained at the Tye Gate entry point for 48 hours (two business days). After the specified time has expired, it will be destroyed. Should the contractor not process through Tye Gate in that 48-hour period, the contractor will require someone to physically vouch them on base to get a one day pass at the VCC so they may proceed to the Pass and Registration office for their badge. The hold period for these forms at the gate can and will be extended should rain days occur or through prior coordination with any affected agency.

8.2 Trusted Agent Letter for Day Labor Requests. The purpose of this letter is to provide sponsoring authority to specific contractor individuals as identified by their sponsoring agency (7 CONS, Army Corp of Engineers, etc) to sponsor day laborers on for one day periods.

8.2.1. The sponsoring agency, in coordination with their contractor, will identify contractor individuals that require sponsoring/vouching authority. This authority is given to the contractor for the purpose of sponsoring day laborers/job site personnel sub-contracted as a result of an unexpected or new requirement not previously identified in the current contract. This authority will not be given to contractors for convenience only, but should be limited to the smallest group of manager or foreman contractor personnel needed to complete their assigned contract. It is the responsibility of the sponsoring agency to ensure the Trusted Agent Letter remains current.

Additionally, all reasonable actions should occur to prevent use of this process when a known laborer/sub-contractor was required well in advance of the day labor/sub-contractor request.

(Effective Date: Immediately)

8.2.2. The sponsoring agency will provide this letter to the Pass and Registration Section who will maintain it on file. The Pass and Registration section shall post a copy of the letter at the VCC, as a reference, to verify which contractor personnel have sponsoring/vouching authority.

8.2.3. The Process to get Day Labors/Job Site Personnel Sub-Contracted onto the Installation:

The contractor individuals identified in the Trusted Agent Letter will provide a typed or hand-written form (form will be provided by the 7 SFS) with all individuals they will sponsor onto the installation to the VCC Guard. The VCC Guard will verify the identity of all individuals on the form by checking the information against a valid State/Federal Identification card. The VCC Guard will randomly check a percentage of the individuals via the TLETS. Should any individual not possess a valid identification card, they will be turned away at the VCC and entry to the installation denied. Pen and ink changes can be made to the form, but all information must be validated by the guard before the contractor will be allowed to proceed onto the installation with the sponsored individuals. No AF Form 75/Visitor Pass will be issued to any individual who is sponsored by the Trusted Agent Contractor, unless the sponsored individual will be driving a vehicle onto the installation. Trusted Agent Contractors are encouraged to consolidate all sponsored individuals into the smallest number of vehicles as possible to avoid the issuance of multiple AF Forms 75. Should an AF Form 75 be issued, the driver will be required to produce a valid driver’s license, current insurance card, and current registration for the vehicle being operated. Once on the installation, the Trusted Agent Contractor will be responsible for the actions of the sponsored individuals. Should an incident occur with a sponsored guest, and negligence be proven on the part of the Trusted Agent Contractor, their vouching/sponsoring authority will be revoked. The Trusted Agent Letter can be adjusted to add and delete names of Trusted Agent Contractors as needed, as long as the provisions of this paragraph are followed.

Although the 7 SFS form is used in lieu of the AF Form 75, it carries the same authority and responsibilities. Additionally, the 7 SFS Form will expire at 0001 daily or at the end of the contractor duty day, whichever occurs first. At no time will the Trusted Agent Contractor depart the installation and leave any of his/her sponsored individuals with another contractor that does not have the same vouching/sponsoring privileges.

8.2.4. All contractors must attend a contractor briefing given to the contractors by Pass and Registration who will provide a more detailed explanation regarding contractor badges and their uses. Pass and Registration reserves the right to not issue a contractor badge due to erroneous information or failure to disclose information on the Dyess Form 173. Any derogatory information received from the background check will result in the non-issuance of the contractor badge.

8.3. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.

8.4. Other Vehicle and Licensing Requirements:

8.4.1. All Contractor employees who will be driving a vehicle on Dyess AFB shall have a current driver’s license with them at all times while on Dyess AFB.

8.4.2. All Contractor vehicles to be operated on Dyess AFB will have a valid state registration, vehicle inspection, and insurance. Proof of registration and vehicle insurance must be physically available at all times while the vehicle is on Dyess AFB.

8.4.3. Any Contractor employee who will be operating heavy equipment or specialized equipment that requires a license or certification shall be so licensed and/or certified with proof presented to the contracting officer prior to work start.

9. Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection Requirements. All Contractor operations shall be conducted and performed in accordance with the Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and the US Army Corps of Engineers’ Safety and Health Requirements Manual 385- 1-1, dated 03 Sep 96 at https://www.publications.usace.army.mil/USACE-Publications/Engineer- Manuals/. The Contractor shall keep the work site clean and clear of any work debris, materials, supplies, tools, or equipment when work is not taking place

9.1. Security Police and Fire Protection. The Government will provide general on-base security police and fire protection service. Security police phone extension is (325)696-2131 for emergencies, and (325)696-4100 for routine calls. Fire protection emergency phone is 117 (from on-base phone only), or (325)696-2117 from a cell phone.

9.2. Hazardous Conditions. During the course of performing work under this contract, should the contractor find existing hazardous conditions that create an unsafe working environment preventing him or her from completing the outlined work, the CO shall be immediately notified.

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

10. State Requirements. All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation Commission (TWCC), shall be submitted For Information Only (FIO) upon request by the Government. In addition to meeting the TWCC requirements; the plan must also include the requirements of US Army Corps of Engineers’ Safety and Health Requirements Manual 385-1-1.

11. Contractor Employees. All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the contractor’s company name and the employee’s name.

11.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for all requirements in this SOW. The name of this person and an alternate(s) who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer (CO). The contract manager or alternate shall have full authority to act for the contractor on all matters relating to this contract. The contractor shall provide the contract manager’s names, addresses, and telephone numbers. The contractor shall maintain a current listing of employees, providing updates as changes occur. The contract manager or alternate shall be available during Monday thru Friday 0800L until 1630L. The contract manager or alternate shall have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral) issued in English by the CO or GR.

11.2 Removal of Contractor Employees. The contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The CO may require that the contractor remove any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S.

Government.

12. COVID-19 Health Procedures. Dyess Air Force Base is currently at HPCON Alpha, meaning there is no requirement for masking or social distancing. HPCON levels are subject to change based on local COVID-19 transmission levels. If the contractor is experiencing symptoms of COVID-19, they will not report to the job site.

1.1.4 Testing Requirements
1.1.5 Acceptance Upon the Contractor’s successful completion of its testing in accordance with Section 1.1.4, above, the installation will be cutover and deemed accepted by the Government. At that time, the Government will finalize all applicable acc...