Statement of Work.pdf
PDF 78 KB Posted
- Attached to
- THREE BUSCH PUMPS MODEL BA0100C Federal contract opportunity
- Solicitation number
- 80NSSC225395Q
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Provide three new pumps with the characteristics below.
Busch BA0100 with Horizontal Inlet -2.4 kW, 60 Hz, 208/480 volts, -set up for 480 volt input (requires flipping of internal switch to run at 208 volts) -Air cooled -With frequency inverter -Main switch at front -N2 dilution + barrier gas -Inlet flange KF50 -Exhaust silencer with KF40 flange and G 1/2" Drain fitting -N2 Fitting: d6 / 1/4 -With D-Sub mating plug.
-Harting power connector -Drainable silencer -Vacuum Pump oil PFPE (supplied separately alongside the pump) Lead Time: 4-6 Weeks
BA0100.CBFA.11YX
CABLE, YEONHAP FEM./DDK MALE
Cable, Yeonhap Female to DDK Male ~150 mm length Connects a Yeonhap BA pump to a DDK power drop
Only new pumps will be accepted.
Robert Somnasri
July 2022.
File details come from the government source that posted it. Updated .