Statement of Work.docx
DOCX document 4 MB Posted
- Attached to
- Pest Control Services at Hilo, HI Federal contract opportunity
- Solicitation number
- 12905B24Q0053
About this file
This solicitation requests quotes for pest control services at a location in Hilo, Hawaii. The solicitation will be awarded as a small business set-aside to provide monthly pest control services over a one-year base period and four one-year options. Quotes are due by March 12, 2024 and shall be submitted electronically to the email addresses provided. The services will be performed at 64 Nowelo St in Hilo for the Agricultural Research Service Pacific West Area of the Department of Agriculture.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TERMS AND CONDITIONS.docx | DOCX document | |
| WAGE DETERMINATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
PEST CONTROL SERVICES
USDA-ARS
ARS-PBARC-DKI
64 Nowelo St, Hawaii 96720
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
0. Project Title:
Pest Control Services
0. Project Location:
USDA-ARS-DKI
Pacific Basin Agricultural Research Center
2.0 PROJECT CONTACT PERSONS:
0. CENTER DIRECTOR (CD):
Marisa Wall Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo Hi 96720
0. ADMINISTRATIVE OFFICER (AO):
Carlee Wehrsig Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 923-2120 E-mail: carlee.wehrsig@usda.gov
| d. | LOCATION CONTRACTING OFFICER REPRESENTATIVE (COR): |
| Pernell Hanoa |
Facilities Manager Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 959-4356 Cell: (808) 896-4523 E-mail: Pernell.hanoa@ars.usda.gov
| e. | SAFETY OFFICER (CDSO) | |
| Scott Geib PhD |
USDA-ARS Pacific Basin Agricultural Research Center 64 Nowelo Street, Hilo, Hawaii 96720 808-959-4335 E-mail: scott.geib@ars.usda.gov
3.0 SCOPE OF WORK
The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required service shall be in accordance with the requirements as described herein and on attached contract documents.
3.1 Background: The USDA/DKI-PBARC located at 64 Nowelo St. and 928 Stainback Highway in Hilo Hawaii requires a turnkey full-service pest control for our laboratory buildings, sidewalks, trailers, concrete buildings, head house buildings, green houses and all associated structures, storage rooms, break areas and workspaces.
| 3.2 | Contractor shall supply all labor, pesticides, poisons, baits, and traps to control the following pests. |
| 3.2.1 | Ants and spiders of all species (except for fire ants) to include interior bait traps, in building and office and lab spaces as well as exterior applications of the concrete borders, sidewalks, building foundations, lawn areas and underground utility boxes as needed. |
| 3.2.2 | Cock roaches of all species to include interior bait traps, in buildings and office and lab spaces as well stairwells and mechanical rooms as needed. |
| 3.2.3 | Rats and mice to include bait traps, mechanical and glue traps as needed. |
| 3.2.4 | Mosquito and fly infestations to include baits and sprays as needed. |
| 3.2.5 | Contractor may submit additional quotes for extreme infestations or unusual issues that may require additional services or treatments. |
| 3.2.6 | Contractor shall provide monthly pest control services not to exceed 1 year plus 4 option years. |
4.0 PROJECT REQUIREMENTS:
1. The Contractor will work with site personnel to ensure the services is accomplished in a timely manner.
1. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction and services shall comply with applicable federal, state, and local code requirements as well as current industry standards, (ie: EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
1. All work to meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.
4.1 Background & Site Description:
The project site is located at the Daniel K. Inouye, Pacific Basin Agricultural Research Center and Germplasm Repository.
4.2 Bid Schedule:
Item Description
Base Item Provide materials, labor, and supplies and all associated services necessary to complete project.
4.3 Description of Work:
1. The Contractor will provide a turn-key project satisfying all Local, State, and Federal requirements.
1. The Contractor will provide all the necessary materials and labor per Section 3.0 and properly dispose of any pests as needed.
1. The contractor is responsible for any damage to adjacent equipment and miscellaneous objects that may become damaged during construction. The Contractor is responsible for making repairs to meet or exceed conditions prior to damage.
1. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for contractors experienced performing this type of work.
4.4 Government Furnished Equipment\Services
1. The Government does not anticipate the need in this project, but the Government will be available to assist with the identification/location of utilities as necessary.
1. The Government will provide a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
0. Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disturbances that might jeopardize on-going operations and research. The owner reserves the right to retain any equipment / materials removed as part of the scope of the work. Contractor shall coordinate any equipment / materials to be retained with Owner prior to starting demolition operations. The contractor shall legally dispose of all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the COR for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. The contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
5.6 Protection of Work and Property/Safety Requirements:
1. Contractor shall furnish a Site-Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) 10 days after contract award. SSSP / APP shall be reviewed by the Government before construction work commences if requested. In addition to the usual components of a safety plan, the plan shall include specific procedures to address mold encountered during the project.
1. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the contractor’s expense, to pre-damaged condition to the satisfaction of the COR.
1. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
1. The contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
1. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during services and shall repair or replace any items damaged through its own negligence.
1. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the COR 21 working days prior to the need.
5.8 Materials and Equipment:
1. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
1. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/COR.
1. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The construction site shall always be kept clean and free of debris. Disposal of the dead rodents, pests and disposable traps is required. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
5.10 Warranty:
1. Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
1. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.
6.0 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from Notice to Proceed.
64 Nowelo St Site Map
64 Nowelo St facilities highlighted in yellow.
New Insectary Building
928 Stainback Highway Facilities highlighted in yellow.