Statement_of_Work.doc
DOC document 42 KB Posted
- Attached to
- BIOSOLIDS HAULING/DISPOSAL Federal contract opportunity
- Solicitation number
- 140P4223Q0043
About this file
This statement of work outlines biosolids disposal services required by Shenandoah National Park. The contractor will haul approximately 15-20 tons of biosolids per trip in multiple trips spaced over a year from the Big Meadows Wastewater Treatment Plant to an approved landfill in Virginia, with trips to be completed within ten business days of ordering. The contract term is one base year with two option years. The contractor will be responsible for landfill disposal costs and include them in the firm fixed price per tonnage quotes of $205 for the base year and option years. Services are required between 8am and 3pm Monday through Friday. Access to the treatment plant requires use of Skyline Drive with restrictions on vehicle size and weight between May and November as well as December through April.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_-_Combined_Synopsis_Solicitation.docx | DOCX document | |
| Sol_140P4223Q0043.pdf | ||
| DOL_Wage_Rate.pdf | ||
| Shenandoah_National_Park_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Biosolids Disposal Services, Shenandoah National Park, 2023
BACKGROUND
Shenandoah National Park operates two tertiary treatment extended aeration sewage treatment plants with drying beds. The drying beds are used to dry consolidated slurry of biosolids. The solids are dried to a very low moisture content and then loaded into a storage bunker at Big Meadows Wastewater Treatment Plant. Two to three times a year, the bunker gets full enough to where it needs to be hauled. Park staff will remove from the bunker and load onto a contractor’s truck approximately 15-20 tons of biosolids each load.
DESCRIPTION OF SERVICES
Provide disposal services to haul and dispose of waste biosolids stored at the Big Meadows Wastewater Treatment Plant located within Shenandoah National Park. This contract will be for a base year with two option years. All biosolids will be removed from the Big Meadows Wastewater Treatment Plant to be disposed of in compliance with all applicable State and Local regulations. The contractor will haul the biosolids and dispose of the biosolids at a State of Virginia approved landfill that is willing to take them. Currently, the following facilities are the only facility approved to accept biosolids from Shenandoah National Park:
Amelia Landfill 20221 Maplewood Rd
(804) 561-5787
Jetersville, VA 23083 Shoosmith Landfill
Virginia Waste Services, Inc.
11800 Lewis Road
Chester, VA 23831
(804) 748-3311
The government will provide reports of testing as required by the receiving landfill. All loading and testing will be completed by government personnel and equipment within one hour of service provider arriving on site, provided the service provider arrives between the hours of 8am and 3pm Monday through Friday.
The service provider will provide all management, supervision, equipment, supplies and personnel required to haul and dispose of the biosolids. Hauling of the biosolids will be done in multiple trips that may be spaced by a number of months. Generally, the service provider will haul approximately 15-20 tons per trip, making an approximate total of four trips in the service year. Trips will be ordered by the COR, Tina Touchstone, and should be completed within ten business days of ordering service.
Location
Big Meadows Wastewater Treatment Plant is located within the Big Meadows admin area, of Shenandoah National Park, approximately 30 miles south of the town of Luray, VA via US Hwy 211 and the Skyline Drive. Big Meadows Wastewater Treatment Plant is accessed by use of Skyline Drive that runs through Shenandoah National Park. The speed limit for Skyline Drive is 35 miles per hour and may be reduced to 20 miles per hour in certain areas. To access the Big Meadows Wastewater Treatment Plant via US Hwy 211 and Skyline Drive, travel through the Mary’s Rock Tunnel will be required. Mary’s Rock Tunnel is restricts vehicles over 12 feet 8 inches in height and/or over 11 feet in width. Vehicles traveling on Skyline Drive between May 1st to November 30th (inclusive) cannot exceed a vehicle combination gross weight of 40,000 lbs. Vehicles traveling on Skyline Drive between December 1st to April 30th (inclusive) cannot exceed a vehicle combination gross weight of 20,000 lbs.
Base Quote Service provider shall be responsible for all measurements and invoicing. All services shall be provided on a single invoice. The contractor shall be responsible for paying the accepting landfill and including that cost in the invoice. Standby time will not be paid. Additions to invoices, including environmental fees and fuel surcharges should be included in the firm fixed price bid.
Item
| Unit of Measure |
| Estimated Units |
| Unit Cost |
Total Cost
Haul and Disposal Base
| Ton |
| 80 |
| $205.00 |
| $16,400.00 |
| Option Year 1 |
| Ton |
| 80 |
| $205.00 |
| $16,400.00 |
| Option Year 2 |
| Ton |
| 80 |
| $205.00 |
| $16,400.00 |
File details come from the government source that posted it. Updated .