About this file

This statement of work outlines requirements for a concrete slab foundation and sidewalk for a 40-foot containerized laboratory in Hilo, Hawaii. The contractor will provide all labor and materials to construct a reinforced 6-inch concrete slab above grade with a 4-foot-wide perimeter sidewalk. The foundation must include a 6-inch-deep by 6-inch-wide water moat surrounded by the sidewalk to prevent crawling insects from entering the building. All work must be completed within 30 days of the notice to proceed. The government will furnish water and electricity as needed for construction.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Slab for Containerized Lab USDA ARS Hilo, Hi Pre-solicitation Notice, newest first.
File Type Posted
PreSolicitation Notice Contrete Slab Hilo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Project: Concrete Slab for Containerized Lab

GENERAL INFORMATION

1.0 Scope of Work: Provide a concrete foundation for a containerized 40’ laboratory with a water barrier to exclude crawling insects to enter building and 4’ sidewalk.

2.0 Background: This foundation will provide a solid foundation for the 40’ containerized laboratory. This container will be used to cultivate plants imported under an APHIS Controlled Import Permit.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

o Contractor shall provide the labor and materials to construct reinforced concrete slab set above grade.

o Ground will be leveled with base coarse and high enough to avoid water run off entering the building.

o Concrete shall have a minimum thickness of 6” and level.

o Concrete shall have a reinforced wire mesh.

o Concrete shall have a minimum strength rating of 2500 PSI.

o Concrete slab will have an inner area of 45 ft x 8 ft surrounded by a 6” deep x 6” wide water moat surrounded by a 4’ wide sidewalk.

o Water moat will be made of or coated with solid, impervious, and waterproof material that can hold at least 4’ of water.

o Conduit pipe to be installed in concrete slab for electricity and water.

o Contractor shall provide all the necessary excavation/fill and compaction requirements to meet concrete construction specifications.

o Concrete surface shall have a brush finish to prevent slipping.

o Contractor shall remove all excess material and debris from site.

Drawing not to scale

45 feet 4 ft

6” wide by 6” deep water moat

8 ft

4.0 Government Furnished:

o The Government will furnish a reasonable amount of water.

o Electricity if not readily available in construction area.

o Facility will be open from 7 am to 5 pm daily except for Federal holidays.

5.0 Deliverables / Schedule:

o The completion time 30 days after notice to proceed (NTP).

6.0 Travel: None

7.0 Contractor’s Key Personnel: N/A

8.0 Security Requirements: N/A

9.0 Data Rights: N/A

10.0 Section 508 – Electronic and Information Technology Standards: N/A

CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks: