Statement of Work - BetaSAM.pdf

PDF 385 KB Posted

Attached to
Resilient Mount Parts Federal contract opportunity
Solicitation number
N5005420Q0106
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a statement of work and related federal contract opportunity solicitation. The statement of work requires the supply and delivery of resilient mount parts and associated hardware to replace diesel generator mounts. A total of 110 resilient mounts, 660 bolts, 660 self-locking nuts, 880 socket head bolts, and 220 self-locking nuts must be delivered by February 8, 2021 to the DLA Distribution Norfolk RMC Proj facility in Norfolk, Virginia. The federal contract opportunity posted on BetaSAM seeks responses from sources capable of providing these resilient mount parts in accordance with the statement of work specifications. Quotes are due by August 3, 2020 and must be submitted electronically to the Naval Sea Systems Command point of contact provided.

View the file

Other files for this federal contract opportunity

Other files attached to Resilient Mount Parts, newest first.
File Type Posted
Statement of Work - BetaSAM.pdf PDF
DD2345 Presentation.pdf PDF
DD2345 Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Title: DIESEL GENERATOR RESILENT MOUNT; REPLACE

1.0. INTRODUCTION.

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 to be delivered to DLA Distribution Norfolk RMC PRJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 thru 2.1.6 complying with the following specifications.

SOW PARA NO. QTY NOUN NAME

2.1.1 110 RESILIENT MOUNT

2.1.2 660 BOLT (7/8-9 X 3.5 INCH)

2.1.3 660 NUT (7/8-9 THREAD) SELF LOCKING

2.1.4 880 BOLT, SOCKET HEAD

(3/4-10 X 2.25 INCH)

2.1.5 220 NUT (1.5-6 THREAD) (SELF LOCKING)

2.1.6 110 RESILIENT MOUNT

2.3. Required Date of Delivery: 08 FEB 21

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PRJ

Bunker Hill Towaway Bldg. X136

Norfolk, VA 23511

M/F: Tony Cunningham

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.

File details come from the government source that posted it. Updated .