Statement of Work Attachment 1.docx

DOCX document 22 KB Posted

Attached to
EMERGENCY FEED PUMP Federal contract opportunity
Solicitation number
N5005420Q0048
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to EMERGENCY FEED PUMP, newest first.
File Type Posted
DD2345 Presentation.pdf PDF
DD2345 Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision Date: 26 FEB 2020 Rev: 2 of 2 Statement of Work

USS WASP (LHD-1)

Title: Emergency Pump

1.0. INTRODUCTION

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 3.1.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. SCOPE OF WORK

2.1. Scope of Work

2.1.1. The required Long Lead Time Material (LLTM) is for the replacement of the existing Emergency Feed Pump onboard the USS Wasp (LHD-1). The material is required to sustain the technical integrity of the vessel for extended periods of deployment. Per the table 3.1.1, Emergency Feed Pump is required by the required delivery date (RDD) listed in 4.1. Inspections, engineering testing, and approvals are required to use similar or substitute items, which can inevitably jeopardize the production completion date (PCD) for scheduled maintenance. Any delay could negatively affect USS Wasp’s mission readiness.

3.0. GENERAL REQUIREMENTS

3.1. The vendor shall supply and deliver the material listed in 3.1.1, complying with the specifications listed in the table below.

3.1.1. Table of Deliverables

QTY
NAME OF PART
DRAWING #
PIECE #
2
PISTON ROD GLAND
0947-LP-072-6010
20
2
BRACKET
0947-LP-072-6010
23
2
MAIN LEVER
0947-LP-072-6010
90
2
LOWER PUMP CYLINDER HEAD
0947-LP-072-6010
134
2
UPPER PUMP CYLIND
0947-LP-072-6010
137
4
COVER
0947-LP-072-6010
141

3.2. All material to be in accordance with technical drawings.

4.0. DELIVERY AND ACCEPTANCE

4.1. Required Date of Delivery (RDD): 17 NOV 2020

4.2. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511

5.0 SHIPPING

5.1 Shipping terms shall be FOB Destination.

5.1.1 The product shall be accepted and inspected at FOB Destination.

5.2 Shipping cost shall be included in the quote.

5.3 Provide written notification via email to the following of date and tracking information when material has shipped.

6.0 POINTS OF CONTACT (POC)

6.1 MARMC Contracting

Shannon Caldow Shannon.caldow@navy.mil 757-400-0329

6.2 Delivery/Acceptance

Magalene Mckelvey magalene.mckelvey@dla.mil 757-278-8449 (End of Statement of Work)

File details come from the government source that posted it. Updated .