Statement of Work - 70Z03824QB0000190.pdf
PDF 102 KB Posted
- Attached to
- OVERHAUL & HYDROSTATIC TESTING OF MH-65 ENGINE EXTINGUISHERS Federal contract opportunity
- Solicitation number
- 70Z03824QB0000190
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to overhaul and test engine extinguishers used on the United States Coast Guard's H-65 helicopter.
The key details are:
- The contractor shall test and evaluate the extinguishers to determine if they are Ready for Installation (RFI) or Beyond Economical Repair (BER). RFI items will be returned as-is, while non-RFI items will be overhauled to OEM specifications.
- The contractor must have the capability to release, capture, re-use, and dispose of the existing extinguishing agent, and complete hydrostatic testing on each extinguisher.
- The contractor must have access to and use the applicable OEM maintenance manuals and specifications, and meet quality system requirements.
- The contract includes a firm-fixed price for the test and evaluation and overhaul work. The government may exercise an option to increase the quantity by up to 40 extinguishers.
- Delivery is required within 15 days for test and evaluation, and 30 days for overhaul.
- This is a Total Small Business Set-Aside solicitation, with a North American Industry Classification Standard (NAICS) code of 336413 and a size standard of 1,250 employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Requirements - 70Z03824QB0000190.xlsx | XLSX spreadsheet | |
| Terms and Conditions - 70Z03824QB0000190.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
PCN: 70Z03824QB0000190
Contractor Requirements
1. This requirement is for the overhaul of items listed in the following table utilized on the
United States Coast Guard (USCG)’s H-65 helicopter. Upon receipt of the components, the contractor shall perform a test and evaluation to determine the condition of the item.
Description Quantity National Stock Number Part Number
Engine Extinguisher 5 1680-14-562-8832 10230-1
Engine Extinguisher 40 Opt Qty 1680-14-562-8832 10230-1
2. Test and Evaluation. If, after visual and functional inspections, an item is found to meet manufacturer's minimum performance specifications and is considered to be Ready for
Installation (RFI) or is considered to be Beyond Economical Repair (BER) in accordance with (IAW) paragraph 12, the contractor will be allowed the firm fixed price for test and evaluation only. The contractor shall prepare a failure data report IAW paragraph 14 which shall be included with the returned component. The parts shall be marked "RFI” or “BER” and returned as-is. All other items shall be overhauled IAW this SOW.
3. Overhaul. Non-RFI components shall be overhauled and returned to RFI condition IAW the
OEM minimum functional performance specifications and OEM’s most current CMM.
Components shall be overhauled for the specific fault noted on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, or CG-1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each non-RFI item. The contractor shall perform an inspection and correct deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion. In addition, the vendor must have the capability of releasing, capturing, re-using, and disposing of (as applicable) the existing extinguishing agent, and to complete successful hydrostatic testing on each extinguisher bottle to establish a new start date of the 5-year testing requirement.
4. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part.
Corrosion removal and treatment of affected areas will be accomplished IAW Original
Equipment Manufacturer (OEM) specifications or Federal Aviation Administration (FAA)
Advisory Circular AC 43-4B, dated 09/11/2018, Corrosion Control for Aircraft.
5. Work under this purchase order shall be performed at the contractor’s facility or USCG approved facility. The contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and overhaul the components listed in this purchase order at the firm-fixed prices listed in the schedule. If any parts or materials are not available to the Contractor and need to be provided as Government Furnished Equipment (GFE), the
Contractor must make this requirement known in writing to the Contracting Officer for approval and indicate the reason they are unable to provide and the quantity for each GFE needed per component to be overhauled. The contractor shall perform overhaul IAW applicable OEM’s Component Maintenance Manuals (CMMs), other overhaul specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by the USCG.
6. The contractor must have access to required CMMs, overhaul specifications and/or test/acceptance criteria and any other required data to ensure all components are tested and overhauled IAW the OEM’s current specifications and procedures. The USCG may review overhaul manuals and performance/test/ acceptance criteria as required. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.
7. The Contractor must have access to all applicable documents and obtain current editions of all applicable documents. The USCG does not own nor can it provide the technical documents specified herein. Neither the closing date for receipt of offers nor contract award will be delayed pending receipt of these documents for any offeror.
8. Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by SRR Engineering.
Replacement parts shall be new and accompanied with OEM traceability. The cost for parts that are replaced systematically during overhaul shall be included in the price listed in the schedule for these operations.
9. Prices do not include components that have been cannibalized or severely damaged due to mishandling or crash damage. Additionally, the H-65 helicopter is used primarily around salt water at low altitude for search and rescue missions. Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft. Corrosion does not constitute unusual damage.
The USCG will be notified of components found to have excessive corrosion which may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, overhaul costs determined, and authorization to proceed obtained from the contract officer prior to commencement of work.
10. Components received which indicate obvious misuse, cannibalization or severe damage due to mishandling or crash damage may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, overhaul costs determined, and authorization to proceed obtained from the Contracting Officer prior to commencement of work. Once notified of a possible exclusion, The Contracting Officer will make a written determination within thirty (30) days as to exclusion validity. The Contracting Office may approve the quote, decline the quote and have the item returned as-is, or consider the item
BER IAW paragraph 11.
11. The contractor may request an item to be determined BER if after initial inspection of the component the contractor feels that the part requires significant overhaul outside of the scope of the normal overhaul procedures provided in the OEM’s CMM. The contractor’s request shall be sent to the KO for consideration. Only USCG can determine a component BER.
The KO will review the request and either accept or deny the BER determination. If the KO denies the BER determination, the contractor shall overhaul the component back to RFI condition at the firm-fixed price rate agreed upon in the schedule. If the KO determines an item to be BER, the KO shall make a unilateral decision as to component disposition. The contractor shall release, capture and re-use or properly dispose of the extinguishing agent before returning all BER (empty) extinguishers to ALC. The contractor shall not return any BER item until they have been notified by a written modification to the order.
The contractor shall prepare a failure data report IAW section 13 in these instances. This report shall be included with the returned component. When returning items to ALC, the items shall be clearly marked as “BER” with the supporting evidence.
12. The Government shall not be liable for any amount expended by the contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting Officer.
13. The contractor shall submit a failure data report for each overhauled component. This report shall include NSN, Part Number, Serial Number, nomenclature, date of overhaul, contract delivery order number, line item number, description of overhauled failure, the USCG’s reported failure, a listing of parts overhauled and a listing of parts replaced. The contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the overhauled component.
14. The contractor is required to be certified and maintain a quality system that complies with the requirements of ISO 9001 Quality Management Systems – Requirements, AS9110, or equivalent. The contractor is responsible for performing or assuring all inspections, tests and calibration necessary to substantiate that the goods or services furnished conform to
Government’s requirements. The contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements.
Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.
15. The contractor shall maintain, at a minimum, one of the following: FAA, European Aviation
Safety Agency (EASA), Department of Defense (DOD), OEM, Industry Standard
Certification (i.e., National Aerospace and Defense Contractors Accreditation Program
(NADCAP)) and/or USCG certifications for overhaul of components identified in the
Schedule for the entire duration of this Purchase Order. The Contractor shall provide immediate notification to the Contracting Officer upon loss of any required certifications.
The contractor shall also:
• Comply with the certification/documentation requirements specified herein.
• Attach certifications/documentation to the outside of the shipping container.
16. All parts overhauled under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form
1574 Serviceable Condition Code Tag completed in its entirety. The contractor shall furnish a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components. These forms shall be packaged with each component.
17. The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's part number and date of manufacture. For Production
Approval Holder, a COC AND a copy of the FAA Parts Manufacturer Approval (PMA) or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.
18. ALC considers components ready for issue (RFI) upon acceptance. Components determined to be non-RFI upon installation may be returned to the contractor with deficiencies described in a Product Quality Deficiency Report (PQDR).
19. All parts must be thoroughly cleaned IAW applicable CMMs, to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take rando samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027
(Cadmium).
Tracked Items
1. When checked the contractor shall comply with the following documentation requirements:
The components to be overhauled under this Purchase Order are tracked in the
USCG’s Asset Computerized Maintenance System (ACMS). ACMS is the management information system used to schedule and record all USCG equipment maintenance actions and calibration intervals.
2. Tracked components will be shipped to the contractor with a Significant Component History
Report (SCHR). The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped. (NOTE: written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the
SCHR for 90 calendar days.
3. The Contractor shall provide a Component Repair Record (CRR) with the overhauled components. The CRR records the maintenance performed on a serial number tracked component and enrolls or disenrolls components from ACMS when those components are scrapped, added to, or removed from the USCG inventory. At a minimum, the CRR shall identify the equipment and contain a description of the maintenance action performed, parts replaced, service bulletins and modifications. The original CRR shall be packed with the component. The Contractor shall retain a copy of each CRR for 90 calendar days. The
Contractor may request that their in-house work order be accepted to fulfill the CRR requirement. The Contracting Officer will provide a written determination in response to the request.
Purchase Order Requirements
1. The following table shows the required delivery for each priced line item listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.
Line Item Item
Description
Due No Later Than:
0001 Test and
Evaluation
(to include
Hydrostatic
Testing)
Fifteen (15) calendar days after receipt of components
0002 Overhaul Thirty (30) calendar days after receipt of components
File details come from the government source that posted it. Updated .