Statement of work 47271.docx
DOCX document 645 KB Posted
- Attached to
- 47' MDE REM/ INSTALL, WELDING, & PAINT Federal contract opportunity
- Solicitation number
- 70Z04024QQSBPL0023
About this file
This document is a solicitation for commercial items to provide general labor, equipment, and facilities to haul out a 47-foot motor lifeboat for the U.S. Coast Guard station in Bragg, California to complete hull inspection and repairs, welding work, recoating of paint and protective coatings, and replacement of the port main diesel engine. The contractor must commence work within 21 days of award and complete the project within 10 working days of scheduled haul out. Quotes are due by January 22, 2024 at 8:00 pm EST and award will be made to the lowest price offeror. This is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,300 employees.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
U.S. Coast Guard Station NOYO River 19325 S. Harbor Dr.
For Bragg, CA. 95437
(707) 964-6612
1. SCOPE: Contractor shall provide general labor, equipment, and facilities to haul out US Coast Guard 47 FT Motor Lifeboat (MLB) 47271 to complete a hull inspection, a forward deck welding repair, recoat all paint and protective coatings, and renew/replace port main diesel engine. See attachments for all applicable instructions, schedules, and plans.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work within 21 days and work diligently to complete the entire project and have vessel ready for use by 10 working days from scheduled haul out after contract award.
3. INFORMATION AND REQUIREMENTS:
Physical Characteristics of Vessel
1. Hull Length 47’ 11”
2. Length Overall 48’ 11” (w/ rub rails)
3. Hull Beam 14’ 0” Beam Overall 15’ 0”
4. Highest Points: Fixed 18’ 6”, Unfixed 28’ 4”
5. Hoisting condition 40,000 LBS (boat, full fuel, outfit; no crew or cargo)
Drydocking
1. Haul vessel
2. Securely block vessel.
3. Lauch vessel (Coast Guard representative shall ensure watertight integrity of vessel and test all propulsion machinery before launch).
4. Documentation provided as attachments:
· Docking Plan 47B-MLB_801_2_1
· Lifting Arrangement 47B-MLB_997_1
Hull Inspection Items
1. Pressure wash hull
2. Record Stern Tube Bearing Clearances
3. Record Strut Bearing Clearances
4. Record Rudder Bearing Clearances
5. Inspect Condition of Propellers
6. Inspect Hull Body, Supporting Structures, and Integrity.
7. Replace Propeller Shaft and Hull zincs (Coast Guard Provided)
8. Service the line cutters
9. References provided as attachments:
· Propulsion Shafting 47B-MLB_243_10_1_-_W
· Procedure Card B00011.0
Forward Deck Welding Repair
1. Complete electrical isolation IAW T14000.0
2. Clad weld 8-inch crack in forward deck plating (3/16 5456-H116-AL ALY PL).
3. Conduct NDT on new welds IAW with industry standards
4. Reconnect electrical IAW T14000.0
5. Pictures provided in enclosure (1).
6. References provided as attachments:
· T14000.0
· Main Deck Drawing 47B-MLB_110_100
· 47 MLB Hot Work Diagram
Contractor Preps, Primes, and Paints
1. Recoat Hull. Prime as needed.
2. Hull paint stock number: Sea Voyage Black, N51B301
3. Primer stock number: AMERICOAT235
4. References provided as attachment:
· Paint Schedule 47B-MLB_631_20
Complete Engine Swap of Port Engine (IAW MPC: A15001.D)
1. Tow reel will be removed prior to arrival.
2. Coast Guard will disconnect all required electronics.
3. Contractor will remove and install all interferences.
4. Contractor will remove and replace PORT main diesel engine.
5. References provided as attachment:
· Procedure Card A15001.D
4. CONDITIONS AFFECTING THE WORK: If additional work items are found, contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original SOW.
5. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s representative of intended start date. The work shall be done in accordance with the specification.
6. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
7. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).
8. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
9. CLEAN UP: All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.
10. UPON COMPLETION OF WORK: Contact the COR to arrange for inspection/acceptance of work.
11. POINTS OF CONTACT:
Contracting Officer Representative Aaron Wills, USCG, MK1 Phone: (707) 964-6612 Email: aaron.s.wills@uscg.mil
12. Enclosure 1:
image1.jpg image2.jpg image3.jpg image4.jpg image5.jpg