Statement of Urgency - Hubbard Hall _Redacted.pdf
PDF 109 KB Posted
- Attached to
- Chrome plate chemicals Federal contract opportunity
- Solicitation number
- W911PT-20-P-0138
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| pp-63 Sole Source Justification - Hubbard Hall redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
WATERVLIET ARSENAL
1 BUFFINGTON STREET
WATERVLIET, NEW YORK 12189
TAWV-CO 18-Mar-2020
MEMORANDUM FOR RECORD
SUBJECT: Statement of Urgency - Purchase of Electropolish, Model #11-J Cleaner (de-ruster) and Aquaease Cleaner for chrome plate facility
1. Purpose: The purpose of this memorandum is to document the urgency with which the US Army is pursuing the transition of the chrome plate facility from GOCO to GOGO. New Electropolish, Model #11-J Cleaner (de-ruster) and Aquaease Cleaner chemicals are required to maintain production chrome quality in all large caliber cannon barrels produced at the Watervliet Arsenal.
2. Background: After a significant decline in chrome plate quality of large caliber cannon barrels, one contributing factor was determined to be declining effectiveness of electro polish which can be mitigated by direct replacement of these chemicals.
3. Benet Laboratories has generated test data that demonstrates a trend in declining quality of Electropolish, Model #11-J Cleaner (de-ruster) and Aquaease Cleaner used to process cannon barrels before plating. To maintain high quality chrome that meets the Technical Data Package (TDP) requirements and meeting the required production schedule for chrome plated cannon barrels requires the expedited acquisition of these critical production materials. This office requests that new contracts in support of the chrome plating acquisition are urgently placed.
4. Impact: If the Electropolish, Model #11-J Cleaner (de-ruster) and Aquaease Cleaner is not replaced it will have a negative effect on the quality of the chrome plating applied to large caliber cannon barrels. This will result in barrels not meeting TDP requirements and having waivers written against them which in turn will cause delays in meeting our scheduled delivery commitments.
5. POC is Mr. Terry Van Vranken, John B. Zayhowski Chief of Manufacturing U.S. Army Watervliet Arsenal
File details come from the government source that posted it. Updated .