This is a Justification for Other Than Full and Open Competition (JOTFOC) memorandum for the procurement of a Pump/Motor Assembly for the USNS MEDGAR EVERS under the simplified acquisition threshold. The requirement is for a repair part for the Stern Tube FW Cooling Pump/Motor Assembly No.2 (model 79807-01-1-2 MXH 403-60/C) to be provided by Defense Maritime Solutions, Inc. with a required delivery date of March 8, 2025.
The justification for sole source procurement is based on several factors: Defense Maritime Solutions owns proprietary rights to the drawings, the equipment is deemed critical ship equipment that poses safety risks if it fails, and standardization requirements specify this make/model for T-AKE 1-14 vessels. The requirement was identified on August 29, 2024, with an estimated 14-week production lead time. The procurement is considered urgent as it involves replacing a failed, beyond-repair and obsolete circuit breaker needed for monitoring overloads, short circuits and preventing overheating wires. The technical research phase caused some delay between requirement identification and submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis_Solicitation_25Q2121.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 July 2018)
Date: 10/16/2024
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): N290024241W161 / USNS MEDGAR EVERS
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include: PUMP/MOTOR ASSEMBLY
a) the name of the required source or brand name
DEFENSE MARITIME SOLUTIONS, INC.
b) the required delivery date/period of performance and
03/08/2025
c) its intended use.
REPAIR PART FOR STERN TUBE FW COOLING PUMP/MOTOR ASSY NO.2
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
DEFENSE MARITIME SOLUTIONS, INC.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. X Only one responsible source (select all that apply):
1. X RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
DEFENSE MARITIME SOLUTIONS, INC. OWNS PROPRIETARY RIGHT TO THE
DRAWINGS OF THE MATERIAL.
b. If drawings are included, who is identified as “owning” the drawings.
2 Ver 2.0 (01 July 2018)
2. EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. X OTHER REASON:
X CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: 10.6-002-01-AKE
b. X STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): DEFENSE MARITIME SOLUTIONS, INC. / 79807-
01-1-2 (MXH 403-60/C)
ii. Identify other vessels with this Make / Model:
T-AKE 1-14
c. FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. X OTHER: Other reasons not identified above: MSC does not have manufacturing and technical information required to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. The OEM rep has access to provide parts and technical data / drawings from the original manufacturer, as required to properly repair and maintain the equipment.
4. X UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would
3 Ver 2.0 (01 July 2018) injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: 08/29/2024
b. Required delivery date / Period of Performance: 03/08/2025
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.
DELAYED DUE TO TECHNICAL RESEARCH.
d. Estimated production lead time: 14 WEEKS
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
This is to replace failed, beyond repair and obsolete circuit breaker. Circuit breaker is needed for monitoring overloads, short circuits and to prevent overheating wires.
f. CASREP Number:
IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT:
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Requester Signature / Date
Higher (Suppo / SPE / ASPE) / Date
Contract Specialist / Date
Contracting Officer / Date ALVEY.CAMERON.S.1595 Digitally signed by
615379
ALVEY.CAMERON.S.1595615379
Date: 2024.11.20 11:15:17 -05'00'
| I. BACKGROUND: |
| II. DESCRIPTION OF ITEM OR SERVICE: |
| REPAIR PART FOR STERN TUBE FW COOLING PUMP/MOTOR ASSY NO.2 |
| DEFENSE MARITIME SOLUTIONS, INC. |
| DEFENSE MARITIME SOLUTIONS, INC. OWNS PROPRIETARY RIGHT TO THE DRAWINGS OF THE MATERIAL. |
| 3. X OTHER REASON: |
| DELAYED DUE TO TECHNICAL RESEARCH. |
| IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: |